| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical OK |
| 2 | Accepted-Technical | Accepted-Technical OK |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
16 Jul 2026, 2:00 pmClosed
EXECUTIVE OFFICER
NAGAR PALIKA PARISHAD BANGARMAU
haji kadir ke makan se lucknow road nala tak RCC nala ka nirman karyahaji kadir ke makan se lucknow road nala tak RCC nala ka nirman karya
2026_DOLBU_1167750_1
964/E-N.S./2026-27 Date 08-07-2026
Open Tender
Civil Works
Percentage
NAGAR PALIKA PARISHAD BANGARMAU
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,298
EXECUTIVE OFFICER
₹1.1 L
Yes
9 Sept 2026
9 Jul 2026
17 Jul 2026
10 Jul 2026
16 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in Excavation for foundations in (silty,garbege, panni) soil including dressing and ramming of bottom and disposal of surplus excavated earth as directed by Engg.-In-Ch.SI 256 | - | M³ | 165 | - |
| 2 | Earth Workfilling in ordinary soil including dressing and cartage up to 4 km distance sl no 253 | - | M³ | 313.2 | - |
| 3 | Providing and laying P.C.C. 1:4:8 (cement,coarse sand, 40mm gauge stone ballast) etc all complet. SI 281 | - | M³ | 5,945 | - |
| 4 | M-150 class Brick work over base concreate in Cement Mortar 1:3 including material,labour,T&P in foundation work below plinth lavel complete .SI no 307 | 1 | M³ | 5,510 | ₹5,504.49 |
| 5 | 20 mm thick plaster with 1:2 mix with neat cement 3 mm floting coatr etc all comp si no 537 | - | M³ | 260 | - |
| 6 | RCC wotk with 1:2:4 coarse sand and 20 mm guage stone grit to | - | M³ | 8,315 | - |
| 7 | M.S Iron work for R.C.C. cover with cutting and binding etc all comp | - | qtl | 6,700 | - |
| 8 | Water Divergen in running water with pump set pipe and making bangha, soil baeg etc all comp | - | job | 1,00,000 | - |
| 9 | P/L of barcating work on boath side for procetion work making and dismentling etc all comp | - | M | 60 | - |
| 10 | P/L Shutring work on boath side for protection work with making and dismentling etc all comp | - | M² | 328 | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
BOQ_2190041.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .