| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.8 LAccepted-AOC | ₹20.8 L | L1 | Accepted-AOC Lowest value |
| Sl No | Description | Qty | Unit | M/S VKM POWER SOLUTION L1 |
|---|---|---|---|---|
| 1.00Excavation of Pole/Stay pits | ||||
| 2.00 | Excavation of pole pit up to 27”(8.0m) pole | 225 | Each | 450 ₹1.0 L |
| 3.00 | Excavation of pole pit 9.0 Mtr and above RSJ pole | 85 | Each | 550 ₹46,750 |
| 4.00 | Stay pit 4.5' to 5' depth by using JCB or manual | 135 | Each | 450 ₹60,750 |
| 5.00 | Erection of PSC/RCC poles/Metal pole up to 8.00m (27’) | 225 | Each | 550 ₹1.2 L |
| 6.00 | Erection of PSC/RCC poles/Metal pole up to 9.14.m(30’) | 85 | Each | 650 ₹55,250 |
| 7.00 | Erection of RSJ Metals Poles above 9.0 m (40') | 5 | Each | 650 ₹3,250 |
| 8.00 | Erection of stay set complete | 135 | Each | 240 ₹32,400 |
| 9.00 | HT V Cross arms / Channel Cross arms / Guarding Cross arm 4 1/2 | 100 | Each | 180 ₹18,000 |
| 10.00 | LT 3 Phase cross arm | 250 | Each | 120 ₹30,000 |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
16 Feb 2026, 2:30 pmClosed
SE/SEDC/SALEM
O/o The SE/SEDC/SALEM
Works contract for Rural Attur Kattukottai and Manjini Section at EastAttur Sub division in Attur Division
2026_EB_651276_1
SE/SEDC/Wc.053/25-26 Dt.02.02.26
Open Tender
Electrical and Maintenance Works
365 days
Attur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
15 Jun 2026
4 Feb 2026
17 Feb 2026
4 Feb 2026
16 Feb 2026
5 Feb 2026
Excavation of Pole/Stay pits
Excavation of pole pit up to 27”(8.0m) pole
Excavation of pole pit 9.0 Mtr and above RSJ pole
Stay pit 4.5' to 5' depth by using JCB or manual
Erection of PSC/RCC poles/Metal pole up to 8.00m (27’)
Erection of PSC/RCC poles/Metal pole up to 9.14.m(30’)
Erection of RSJ Metals Poles above 9.0 m (40')
Erection of stay set complete
HT V Cross arms / Channel Cross arms / Guarding Cross arm 4 1/2
LT 3 Phase cross arm
LT single Phase cross arm
HT /LT TI Fitting
Fixing of HT Pin Insulators (11/22KV)
Fixing of HT 11KV stain disc
Fixing of HT 22KV stain disc
Fixing of LT Pin Insulators
Fixing of LT Shackle
Fixing of knob
ACSR 7/4.09 mm Raccoon conductor
7/3.35mm ACSR 7/3.15mmAAAC(per Km)
7/2.59mm ACSR & 7/2.50mm AAAC(per Km)
Earthing of Poles
Tree cutting (Clearing of Branches)
Drilling of Holes
Cutting of channel
Loading or Unloading Transformer upto 100kVA for each
Loading or Unloading Transformer Above 100kVA upto 200kVA
Loading or Unloading Transformer upto 200kVA for each
Erection of New Transformer all capacities (with jumpering)
Mass concreting including materials (Cement + River sand/ M sand and Blue metals and watering)
Stay Concreting including cost of materials and labour 375mmx375mmx50mm
Base Concreting including cost of materials and labour 2'x2'x1' (If base plate not provided)
Erection of Transformer structure completed in all respects with wiring Earthing ,fixing of open type fuse units ,HT/LT/LAS and jumpering 3 Each.Earth pits with tubs including painting of metal parts, structure poles , fixing of top channel seating channel, belting angle including concreting (Except erection of transformer) - Double pole structure
Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Each. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
Erection of D.P. structure with AB switch, top channel, cross bracing, earthing, painting, providing stay including concreting
Transport of poles/Materials/ conductors and other materials Below 8 Kms
Transport of poles/Materials/ conductors and other materials Above 8 Kms. For additional Km (Irrespective of weight in tonnage)
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100m
Loading of poles upto 27"
Loading of poles upto 30"
Un Loading of poles upto 27"
Un Loading of poles upto 30"
Loading of metal poles all size
UnLoading of metal poles all size
Loading of line Materials
Unloading of line Materials
Releasing of Single Phase service wire and refixing
Releasing of Three Phase service wire and refixing
Alteration of back clamps to suits for the works
Alteration of stay clamps to suits for the works
Dismantling of pole & pole pit and loading unloading of grills (7.5mtr & 8mtr)
Dismantling of pole & pole pit and loading unloading of grills 9 mtr
Dismantling of HT V Cross arms /Channel Cross arms / Guarding Cross arm 4 1/2
Dismantling of HT /LT TI Fitting
Dismantling of HT Pin Insulators (11/22KV)
Dismantling of HT 11KV stain disc
Dismantling of 22 KV disc
Dismantling of 3 PH X arm
Dismantling of 1 PH X arm
Dismantling of Alu Knob
Dismantling of LT pin Insulator
Dismantling of LT Shackle Insulator
Dismantling of Stay Set Complete
Dismantling of 7/3.35 mm ACSR conductor (Km)
Dismantling of 7/2.59 & 7/2.11 mmACSR conductor (Km)
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_780965.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid