Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAccepted-Finance | L1 | Accepted-Finance LOWEST RATES QUOTED/OFFERED | |
| 2 | L2₹10.9 L+₹28,267.94 (2.66%)Accepted-Finance | L2 | Accepted-Finance 2ND LOWEST RATES QUOTED/OFFERED | |
| 3 | L3₹11.8 L+₹1.2 L (10.9%)Accepted-Finance | L3 | Accepted-Finance 3RD LOWEST RATES QUOTED/OFFERED | |
| 4 | L4₹11.9 L+₹1.3 L (12.3%)Accepted-Finance | L4 | Accepted-Finance 4TH LOWEST RATES QUOTED/OFFERED |
Tender Value
Refer Docs
EMD Value
₹26,000
Closing Date
13 Jul 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DFO Social Forestry Division Anantnag
Divisional Office, SF Division Khanabal Anantnag
Construction of BOs Hut at Co. 35LDR Pahalgam of Social Forestry Range Anantnag
2021_FD_129656_1
e-NIT No. 05 OF 2021-22 Dated 06-07-2021
Open Tender
Civil Works
Item Rate
90 days
Pahalgam
Please refer Tender Documents
2 documents required · 2 mandatory
₹1,100
Government Treasury under Account Head 0406-Forest
₹26,000
15 Jul 2021
6 Jul 2021
14 Jul 2021
7 Jul 2021
13 Jul 2021
7 Jul 2021
7 Jul 2021 - 8 Jul 2021
45 days
Amount
Site clearance and land levelling
Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr inwidth as well as 10 sqm. on plan) including disposal ofexcavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil TOTAL WALL AREA = 1X294.25XsdX3.00 = 882.75 S-TANK = 1X10.00X8.00X6.00 = 480.00 SOAK PIT = 0.785X6.00X6.00X12.00 = 339.12 = 1701.87 Cft = 48.18 Cum
P/ LAYING OF DRY STONE SOLLING HAND PACKING IN FOUNDATION INCLUDING 15KM MT CARRIAGE FROM SOURCE. Total Wall Area = 1 x 294.25sft x 0.50 = 147.13 S-Tank = 1 x 10.0 x 8.00 x 0.50 = 40.00 Room Filling = 1 x 8.50 x 8.875 x 3.00 = 226.31 = = 1 x 19.0 x 10.875 x 3.00 = 619.88 = = 1 x 07.5 x 6.875 x 3.00 = 154.69 = = 1 x 4.5 x 4.875 x 3.00 = 65.81 = = 1 x 7.25 x 8.875 x 3.00 = 193.03 = = 1446.84 Cft = = 40.96 Cum
P/LAYING OF CEMENT CONCRETE OF GRADE M 7.5 USING 40MM N.S.A. INCLUDING CURING, BUT EXCLUDING THE COST OF CENTRING AND SHUTRING. = = 1x294.30sft x 0.33 = 97.10 S-Tank = 1x10.0x8.0x0.33 = 26.40 = = 123.50 Cft or 3.50 Cum
P/ LAYING OF CEMENT CONCRETE OF GRADE M 10 USING 20MM N.S.A INCLUDING CURING, BUT EXCLUDING THE COST OF CENTRING AND SHUTTRING. Plinth U/G = 1x294.25sftx1.16 = 341.33 A/G = 1x223.68sftx2.50 = 559.20 Verandah = 1x6.75x4.0 x 3.00 = 81.00 Steps = 0.5x4.00x4.0x3.0 = 24.00 = 1005.53 Cft Plum 20% 28.47 = 5.69 Cum
Concrete 80% 22.78 Cum
P/ LAYING OF RAINFORCED CEMENT CONCRETE OF GRADE M 15 USING 20MM N.S.AGG. INCLUDING CURING EXCLUDING COST OF SHUTTERING AND REINFORCEMENT STEEL. RAFT = 1x294.25 Sft x1.00 = 294.25 BEAMS = 1X8.00X0.75X1.00 = 6.00 DPC = 1X223.68SFTX0.50 = 111.84 RCC LINTEL = 1X114.00SFTX0.50 = 57.00 SLAB = 1X679.00 SFTX0.42 = 285.18 = 754.27 CFT = 21.36 CUM
BRICK WORK WITH FPS BRICKS OF CLASS DESIGNATION 75 FOR SUPER STRUCTURE (1:6) MIX EXCLUDING CARRIAGE. L/W = 1X114.0SFTX8.50 = 969.00 S-TANK = 1X39.50X0.75X5.00 = 148.13 DEDUCTIONS DOORS = -4X2.5X0.75X7.00 = -52.50 = -1X4.7X0.75X7.50 = -26.27 WINDOWS = -7X6.0X0.75X5.0 = -157.50 = -1X4.0X0.75X3.0 = -9.00 = -1X3.0X0.75X2.50 = -5.63 = 866.23 CFT = 24.53 CUM
EXTRA For brickwork in super structure above plinth level.
MS REINFORCEMENT FOR RCC WORK INCLUDING STRAIGHTINING, CUTTING, BENDING, PLACING IN POSTION COMPLETE .
0.8 QTL/CUM
PROVIDING FORM WORK OF ORDINARY TIMBER PLANKS FOR CENTRING SHUTTRING PROPPING ETC. AND REMOVAL OF SAME. PLINTH AND DPC OUTSIDE = 2X27.0+28.25X3.0 = 331.50 = 2X19.0X3.00 = 114.00 = 2X10.875X3.00 = 65.25 = 4X8.875X3.00 = 106.50 = 2X7.25X3.00 = 43.50 = 2X7.50X3.00 = 45.00 = 2X6.88X3.00 = 41.25 = 4X4.40X3.00 = 52.80 S-TANK = 1X10.00X8.00 = 80.00 SOAP PIT = 0.785X6.00X6.00 = 28.26 STEPS = 4X4.00X0.670 = 10.72 = 918.78 SFT = 85.39 CUM
ABOVE PLINTH LEVEL RCC LINTEL = 2X152X0.50 = 152.00 SLAB = 1X679XSFT= 679.00 SLAB EDGE = 1X152X0.42 = 63.84 = 894.84 SFT = 83.16 SQM
P/LAYING OF CEMENT CONCRETE 1:2:4 OF SPECIFIED GRADE (M15) USING 20MM N.S.A FLOORING 50MM THICKNESS. = 1X10.0X10.0 = 100.00 = 1X09.0X08.0 = 72.00 = 1X12.0X20.5 = 246.00 = 1X06.0X05.3 = 31.50 PASSAGE 1X69.5XSFT = 69.50 = 172 SFT = 15.99 SQM
12MM THICK CEMENT SAND PLASTER OF 1:4 MIX ROOMS INNER WALL AND CEILING (2*(S1+S2)*H)+(S1+S2) = S1 S2 X H R1 = 1X10.0X10.0X9 = 460 HALL = 1X12.0X20.50X9 = 831.00 KITCHEN = 1X8.0X9.00X9 = 378.00 BATH ROOM = 1X6.00X5.25 = 234.00 PASSAGE = 2X10.8X8.0X9 = 423.50 PLINTH OUTSIDE - 1X28.3X27.0X3 = 331.50 OUTSIDE = 1X27.0+28.25X9 = 994.5 DEDUCTIONS DOORS -8X2.5X7.0 = -140.00 = -2X4.7X7.50 = - 70.05 WINDOWS -14X6.0X5.0 = - 420.00 = - 2X4.0X3.0 = -24.00 = -2X3.0X2.50 = -15.00 = 3977.95 SFT = 369.55 SQM
WOOD WORK IN FRAMES OF DOORS AND WINDOWS WROUGHT FRAMED AND FIXED IN POSTION SECOND CLASS KAIL WOOD. DOORS 4X16.5X0.25X0.42 = 6.93 = 1X27.0X0.25X0.42 = 2.84 WINDOWS 7X32.0X0.25X0.42 = 23.52 = 1X17.0X0.25X0.42 = 1.79 = 1X13.5X0.25X0.42 = 1.42 = 36.49 CFT = 1.03 CUM
P/F OF PANNELED GLAZED SHUTTERS FOR DOORS WINDOWS INCLUDING BUTT HINGES WITH NECESSARY SCREWS AND OTHER HARDWARE ITEMS, OF 35 MM THICK SECOND CLASS KAIL WOOD COMPLETE JOB. DOORS = 4X2.2X6.84 59.37 = 1X4.2X7.34 30.68 WINDOWS = 7X5.3X4.61 168.58 = 1X3.5X2.67 9.37 = 1X2.7X2.17 5.79 = 268.01 SFT = 24.90 SQM
PROVIDING AND APPLYING WHITE CEMENT BASED PUTTY OF AVERAGE THICKNESS 2 MMOF APPROVED BRAND AND MANUFACTURE OVER THE PLASTERED WALL SURFACE TO PREPARE THE SURFACE EVEN AND SMOOTH and APPLYING ONE COAT OF WATER THINNABLE CEMENT PRIMER OF APPROVED BRAND . AREA VIDE ITE NO 11 DEDUCTIONS BATHROOM = -1X20.0X4.00 -80 SFT = - 7.43 SQM NET 362.12 SQM
PAINTING WITH SYNTHETIC PAINT ENAMEL PAINT OF APPROVED BRAND AND MANUFACTURE TO GIVE AN EVEN SHADEINCLUDING APPLYING PRIMING COAT WITH READY MIX PINK OR GREAY PRIMER OF APPROVED BRAND AND MANUFATURE ON WOOD WORK HARD AND SOFT WOOD TWO OR MORE COATS ON NEW WORK. FOR DOORS/WINDOWS
P/F IST QUALITY CERAMIC GLAZED TILES CONFORMING TO IS :15622 OF MINIMUM THICKNESS 5MM OF APPROVED MAKE LIKE NITCO ORIENT SOMNNAY KAJARIA OR EQUIVALENT MAKE IN ALL COLOUR OF ANY SIZE AS APPROVED BY ENINGEERING CHARGES AND JOINTING WITH GREY CEMENT SLURRY @ 3.3 KG PER SQM INCLUDING POINTING IN WHITE CEMENT MIXED PIGMENT OF MATCHING SHADE COMPLETE. BATHROOM 1X20X4 = 80.00 SFT = 7.43 SQM
FLOOR = 1X6X5.25 = 31.50 SFT = 31.50 SFT = 2.93 SQM
Providing, fixing of sanitary/plumbing work.
1.LONG PAN PATTERN WC PAN OF SIZE 580MM INCLUDING FLUSH CESTERN. 2.WASH BASIN SIZE 630*450MM WITH A PAIR OF 15MM C.P BRASS PILLAR TYPE WHITE VITREOUS CHINA. 3. BIB COCK LONG NOSE OF APPROVED BRAND 15 MM BORE (4no's) 4. BRASS WASH BASIN MIXER 15 MM N BOX OF STANDARD BASE TYPE (01 no) 5. CP BRASS ANGLE VALUE 15MM NOMINAL BORE O APPROVED BRAND (2 No's) 6. WHITE VITREOUS CHINA WASH BASIN PEDESTAL, CP GRATING, CP WASTE (01 NO EACH). 7 15MM G.I PIPE 8 NO'S, PVC PIPES 4" & 3" 6 NO'S EACH INCLUDING BENDS AND MANHOLE PVC COVER, 8. TOWEL ROD STAINLESS STEE, MIRROR, BALL VALUE. ETC. TO PE PAID A.P.A(S.T.A)
P/F TANKT 1000 LTS TRIPPLE LAYER INCLUDING FITTING CHARGES.
RRM MASONARY IN DRY FOR FOUNDATION AND PLINTH USING QUARRY STONES. SOKAGE PIT = 0.785X(6*6-2*2) X 12.0 = 301.50 CFT = 8.53 CUM
PROVIDING AND FIXING OF steel Grill for windows and front gate complete JOB. = 7X6.0X5.00 = 210.00 = 1X4.0X3.00 = 12.00 = 1X3.0X2.50 = 7.50 = 1X4.7X7.50 = 35.03 = 264.53 SFT = 396.79 KG
CARRIAGE OF SAND BAJRI 40 KM BY M.T
CARRIAGE OF BRICKS BY MT 5OKM QAZIGUND.
CARRIAGE OF OTHER REMAINING ITEMS (Wooden frames, doors shutter, grills, cement,paint, hardware and sanitary items etc.)
CARRIAGE OF RRM QUARRY STONES. 45 KMS
Electification TO BE PAID (S.T.A) A.P.A
arjumand hussain sheikh
M/s JAVAID AHMAD ALLAIE
TAHIR AHMAD WANI
tech_eval.pdf
fin_eval.pdf
finance_256390.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .