| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.7 LAccepted-AOC | ₹12.7 L | 1 | Accepted-AOC WORK ORDER |
| 2 | 2₹12.8 LRejected-Finance | ₹12.8 L | 2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Modern Infrastructure L2 | R. DHANAPAL, CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 153.6 | Cum | 200 ₹30,720 | 197 ₹30,259.20 |
| 2.00 | Collection and supply of M sand and filling conveyance to the siteand all labour charges for filling as per standard speecifications | 12.8 | Cum | 1,940 ₹24,832 | 1,933 ₹24,742.40 |
| 3.00 | Cement Concrete in 1 : 4: 8mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 20.8 | Cum | 5,625 ₹1.2 L | 5,620 ₹1.2 L |
| 4.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 6 | Cum | 6,925 ₹41,550 | 6,922 ₹41,532 |
| 5.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing and conveyance of all materials to site and all labour charges etc complete -10 cum | 416 | Sqm | 548 ₹2.3 L | 547 ₹2.3 L |
| 6.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum | 48 | Cum | 6,380 ₹3.1 L | 6,375 ₹3.1 L |
| 7.00 | Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour charges | 72 | Sqm | 585 ₹42,120 | 582 ₹41,904 |
| 8.00 | Supplying and fabrication of steel including cost and conveyance ofsteel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works | 1.35 | MT | 92,000 ₹1.2 L | 91,924 ₹1.2 L |
| 9.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum | 18 | Cum | 9,250 ₹1.7 L | 9,249 ₹1.7 L |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 1,94,603 ₹1.9 L | 1,94,304 ₹1.9 L |
Tender Value
₹13.0 L
EMD Value
₹12,960
Closing Date
12 Jan 2026, 3:30 pmClosed
Block Development Officer (B.P), Tiruchengode
Block Development Office ,Tiruchengode
Construction of drain and CC Pavement from Karthi house to Murugesan house at Panneerkuthipalayam AR Street H/O Pirithi in Tiruchengode Block at Namakkal District under NNT - 2025 - 2026 TGD-1
2026_RDTN_638468_1
1200/2025/A2
Open Tender
Civil Works - Others
90 days
Tiruchengode
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,960
27 Jan 2026
2 Jan 2026
12 Jan 2026
2 Jan 2026
12 Jan 2026
2 Jan 2026
Amount
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of M sand and filling conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete in 1 : 4: 8mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing and conveyance of all materials to site and all labour charges etc complete -10 cum
Cement concrete 1:3:6 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour charges
Supplying and fabrication of steel including cost and conveyance ofsteel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metalincluding cost and conveyance of all materials to site and alllabour charges for mixing, laying, and curing etc complete for 10 cum
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Modern Infrastructure (BID ID -1559888)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
TechBid.pdf
Tender Documents • 0.33 MB
BOQ_764113.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid