| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-Finance 6S FIRST FLOOR POONGA NAGAR RAJAGOPALAPURAM PUDUKKOTTAI | PUDUKKOTTAI | PUDUKKOTTAI | TAMIL NADU | ₹2.4 Cr | L1 | Accepted-Finance accept |
| 2 | Rejected-Technical SEEMANOOR THIRUMAYAM TALUK PUDUKKOTTAI DISTRICT | THIRUMAYAM | PUDUKKOTTAI | TAMIL NADU | - | - | Rejected-Technical HIGHER VALUE |
Tender Value
₹2.4 Cr
EMD Value
₹1.3 L
Closing Date
25 Jul 2025, 3:00 pmClosed
Fit Person/Executive Officer
Arulmigu Anantheeswarar Temple at pazhlya Arkad Village, Budalur Taluk, Thanjavur District
Re Construction of swamy Amman Mahamandapam, vinayagar, Murugan,Chandikeshwarar,Navagraha Mandapam, Bhairavar, Suriyan,Chandran,Thirumadhil wall and Providing Cut Stone Prahara Flooring of Arulmigu Anantheeswarar Temple at pazhlya Arkad Village,
2025_HRCE_561106_1
25/2025-Re Construction of the Temple
Open Tender
Civil Works - Others
Item Rate
540 days
Anantheeswarar Temple at Pazhlya Arkad
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.3 L
25 Jul 2025
23 May 2025
25 Jul 2025
23 May 2025
25 Jul 2025
23 May 2025
Amount
Dismantling, clearing away and carefully stacking materials useful for reuse for any thickness of walls brick or stone In Lime mortar wall under 3 M ht. etc as per instruction of departmental officers etc.,complete.
Earth work excavation for foundation with all leads and lifts in all soils and sub-soils and to the required depth as may be directed except hard rock requiring blasting inclusive of shoring, strutting and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layers of 150mm thick well consolidated, depositing the surplus earth in places shown and levelling the site with all leads and lifts etc. complete in all respects..
Supplying and filling in foundation in basement with filling sand in layars of 150mm thickness well watered rammed and consolidated complyiny with relevant std specification including cost of supplying filling sand.
Cement concrete 1:5:10 (One of cement, five of sand and ten of HBG Jelly ) using 40mm gauge hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed, watered etc., complete complying with standard specification
Brick masonary LM1:2 using Stock bricks including all varivargams, mould sthambams mokopathrams, koodu, Nasi and all ornamental brick work complete, all pancharams Agarais, Karanakoodu, etc., forming core walls of Rajagopuram / Vimanam complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for Kalkaram.
Kalkaram
Vimanam / gopuram of ht. Up to 15' excluding Kalkaram.
Vimanam / Gopuram of height up to 25' 0" (excluding kalkaram)
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1.5 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime Mortor1:1.5 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram.
Kalkaram
Vimanam / gopuram of ht. Up to 15' excluding Kalkaram.
Vimanam / Gopuram of height up to 25' 0" (excluding kalkaram)
Labour charges for Removing the Old cut stone padma jegath athisdanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Removing the Old cut stone Kumatahagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Removing the Old cut stone Kandam Pattiyal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for cut stone Aswapatham Sthambam vari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Removing the Old cut stone Kalvari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Supply of cut stone for carrying out Garbagraham,Arthamandapam,Mahamandapam and other temple structure up to 10 feet length Side wall, Pavukkal , Uthiram and all hire charegs for all tools and plants and clearing the site after completeion of work etc., complete.
Labour charges for Refixing the Old cut stone padma jegath athisdanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Refixing the Old cut stone Kumatahagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Refixing the Old cut stone Kandam Pattiyal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Refixing the Aswapatham Stambam vari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Refixing the Old cut stone Kalvari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Dressing & Fixing the New cut stone Chithiravanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Dressing & Fixing the New cut stone Padma Jagathi excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Dressing & Fixing the New cut stone Kandam Vari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Dressing & Fixing the New cut stone Kabothagam Vari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for Dressing & Fixing the New cut stone Aswapatham Vari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for fixing the New cut stone Kalvari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for fixing the New cut stone Thoon Kampu Eluthagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for fixing the New cut stone Bothiyal Kampu Eluthagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for fixing the New cut stone Uthiram Kampu Eluthagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for fixing the New cut stone Presthalam Kampu Eluthagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for fixing the New cut stone Kabothagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for fixing the New cut stone Vyalavari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for fixing the New cut stone Pavukkal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.
Labour charges for cut stone Nilaikkal (Nagapantham Kodikarukku and Karukku) excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Painting with multicolour (Panchavarnam) good water based exterior emulson paints complete for the Vinamans/Gopurams, including cost and conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area.
Vimanam / gopuram of ht. Up to 15' (excluding kalkaram)
Vimanam / Gopuram of height up to 25' 0" (excluding kalkaram)
Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With Lime Mortor1:1:5 etc complete. (outer)
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications
Size - 3'6" x 6'0"
Size - 3'0" x 6'0"
Size - 4'0" x 7'0"
Varnishing new and old wood work two coats of approved quality in all floors the rate includes cost of all materials, brushes, Scaffolding charges etc.. Complete with best loc polish
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood pland for working, inpection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work 1 sq,ft.
Vimanam /Gopuram upto 15'-0" Height
Vimanam /Gopuram upto 25'-0" Height
Providing new sudhai vigrahams in the vimanams and Rajagopurams with galvanised iron rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in Lime Mortor 1:3 finishing the same with Lime Mortor 1:3 bringing to the correct shape (Lakshana) in conformift with silpa sastra inclusive of special ornaments, wiapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and G.I. rods.binding wire all labour for working in heights, curing lifiting of materials etc., complete including cement painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is pt\rovided the rate with peetam may be adopted as datailed hereunder)
Sudhai size above 1' 0" upto 2' 6"
Brick work in lime Mortor 1:2 using country brick of size 83/4"x41/4"x23/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification
Weathering course concrete with broken jelly 20mm size and pure slaked lime over RCC roof slab, the proportion being 32:12.5 for required depth of 80mm for giving required slope and thickness of roof on required, well beaten with wooden beater etc, complete with standard specifications.
Finishing the top of roof with one course of machine pressed tiles 23cmx 23cmx20mm of approved quality laid in ;LM 1:3,12mm thick mixed with water proofing compound 2% by weight of cement used etc, complete with standard specifications.
Dome brick work in Lime Mortar 1:2 using country brick of size 83/4"x41/4"x23/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification.
Plastering with Lime mortar 1:1.5,20 mm thick including cost and conveyance of all materials and all labour charges,curing etc,complete complying with standard specifications.
Plastering with Lime mortar 1:1.5,12mm thick including cost and conveyance of all materials and all labour charges,curing etc,complete complying with standard specifications.
Painting two coat with approved water based Exterior Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curing in all floors including brushes etc., complete as per specification. -10 m 2
Wiringwith2x1.5sq.mm.PVCinsulatedSCunsheathedFRLScopperconductorof1100VgradeinsuitablePVCrigidpipeonwallandceilingwithPVCaccessoriesandwithTWswitchboxand5AFTswitchwithpaintingofsuitablecolourfor open PVC light point / fan point (for electronic regulator) (5 points per coil)
Supply and fixing of single box type 4'20 W LED fitting with TW round blocks on wall or ceiling with PVC and unsheathed copper leads from terminals to the fitting (Higher end) (DATA-A1)
Supplyandfixingof1200mm(48")ACceilingfancompletewithsteppedelectronic300Wregulatorwith300mmdownrod on the existing clamp
supply and fixing of 30W LED street light fitting with LED (Lower end) with 25mm dia. GI pipe (class B) with 1 no.25mm GI bend complete on the existing post/ on wall with PVC unsheathed copper leads with MS clamps and with painting .
Supplyandfixingof3Nos.5A(3pinand2pin)combinedflushtypewallsocketwithcontrolswitchesconcealedinsuitable TW box covered with hylem sheet in flush with wall with earth connection (for computer plug socket)
Supply and fixing of 100W Flood light fitting on wall with suitable angle iron support with necessary connection (Data - A2)
Supply and Run of 2 of 2.5 sq.mm. PVC insulated SC unsheathed FRLS copper conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with continuous earth wire connection of 2.5 sq.mm copper wire with painting of suitable colour.
Supply and fixing of 8 way single pole and neutral MCB sheet steel enclosure distribution board with double door (metal) with 1 no. 32A DP MCB switch as incoming and 6 nos. 6A to 32A SP MCB as outgoing on suitable angle iron frame on wall with earth connection only. Lower End
Supply and laying of 2 X 10 sq.mm. PVC armoured LTUG cable in suitable size HDPE pipe in a trench to be excavated at a depth of 0.75 meter and refilling the earth to make good.
Supply and clarnping of 2 x 10 sq.mm. PVC LTUG armoured cable on post or on wall with MS clamps
Supply and fixing of brass cable gland for 2 x 10 sq.mm. PVC armoured LTUG cable with earth connection
EarthingaspertheISIspecificationwithanearthelectrodeof2.10metreClass'B'GIpipeofdianotlessthan40mmwithcopperearthplateofsize125mmx50mmx6mmwithnecessaryfunnelingarrangementswithnecessarymasonry work and with 38mm RCC cover slab for the brick masonry
Supply and Run of 1 of No.8 SWG copper wire in suitable PVC rigid pipe on wall / floor / ground for earth connection
Supplyandrunof2of4sq.mm.PVCinsulatedSCunsheathedFRLScopperconductorof1100Von7/20GIbearerwire for service connection mains
Supplyandrunof2of4sq.mm.PVCinsulatedSCunsheathedFRLScopperconductorof1100Vgradein25mmdiaGIpipe (Class 'B') suitably bent at both ends with necessary angle iron upright and end supports for mains
Supplyandrunof2of4sq.mm.PVCinsulatedSCunsheathedFRLScopperconductorof1100VgradeinsuitablePVCrigidpipeonwallandceilingwithcontinuousearthwireconnectionof4sq.mmcopperwirewithpaintingofsuitable colour
sub total
P. GANESAN (BID ID -1412286)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_670055.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .