Loading…
Loading…
Tender Value
₹7.0 L
EMD Value
₹7,000
Closing Date
6 Jul 2026, 5:00 pm
Similar tender results from the same govt authority in the past 3 years.
EXECUTIVE OFFICER JAGATSINGHPUR MUNICIPALITY
OFFICE OF THE JAGATSINGHGPUR MUNICIPALITY
Construction of Community center near Musalman Sahi at Ward No.07
2026_ORULB_132780_11
JSPURM-EO-Tender-05/2026-27
Open Tender
Civil Works - Others
120 days
Construction of Community center near Musalman Sah
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
₹7,000
Yes
25 Jun 2026
25 Jun 2026
7 Jul 2026
25 Jun 2026
6 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in all kinds of soil including rough dressing and levelling the bed. | 14.84 | cum | 306.01 | ₹4,541.19 | BI01010001010000000000000515BI0100001114 |
| 2 | Transporting the excavated materials by mechanical means with all cost, carriage etc, complete. (As per SOR 2022 Page No.163) | 14.84 | cum | 185.85 | ₹2,758.01 | BI01010001010000000000000515BI0100001115 |
| 3 | Filling F&P with sand well watered and rammed. | 5.52 | cum | 524.26 | ₹2,893.92 | BI01010001010000000000000515BI0100001116 |
| 4 | C:C: (1:3:6) using 4 cm. size H.G. C.B metal including the cost of all materials, labour carriage, royalty etc complete. | 5.15 | cum | 6,851.38 | ₹35,284.61 | BI01010001010000000000000515BI0100001117 |
| 5 | R.C.C. work of M20 grade with 20 mm down grade chips (C.B.) including Hoisting & laying (Data for 15 cum) | 16.89 | cum | 6,938.45 | ₹1,17,190.42 | BI01010001010000000000000515BI0100001118 |
| 6 | Rigid smooth centering and shuttering for R.C.C. works including false works and dismantlling them after casting including cost of materials complete in G.F. (ROOF SLAB) | 45.94 | sqm | 769.2 | ₹35,337.05 | BI01010001010000000000000515BI0100001119 |
| 7 | Rigid smooth centering and shuttering for R.C.C. works including false works and dismantlling them after casting including cost of materials complete in G.F. (Foundation & Plinth) | 35.4 | sqm | 249.73 | ₹8,840.44 | BI01010001010000000000000515BI0100001120 |
| 8 | Providing and fixing Centering and shuttering including strutting, propping etc. and removal of form the site after completion of respective work as the direction of engineer in charge. (Beam & Column) | 53.7 | sqm | 1,219.7 | ₹65,497.89 | BI01010001010000000000000515BI0100001121 |
| 9 | Providing and fixing Centering and shuttering including strutting, propping etc. and removal of form the site after completion of respective work as the direction of engineer in charge. (Lintels) | 10.8 | sqm | 577.75 | ₹6,239.7 | BI01010001010000000000000515BI0100001122 |
| 10 | Labour charges for cutting, bending, binding and tying the grill including the cost of M.S. rod. | 14.75 | qntl | 8,901.27 | ₹1,31,293.73 | BI01010001010000000000000515BI0100001123 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.47 MB
BOQ_597697.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid