Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16,600Admitted-Finance | ₹16,600 | L1 | Admitted-Finance |
| 2 | L2₹17,150+₹550 (3.31%)Admitted-Finance AAKANSHA AGENCY KALI MATA MANDIR JAVAL NAVIN BUS STOP ANSHI WARDHA | WARDHA | MAHARASHTRA | 442001 | ₹17,150+₹550 (3.31%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PRAVIN R. GEDAM L1 | Nitin Mankar L2 |
|---|---|---|---|---|---|
| 1.00Construction of BT Speed Braker at various Location in Wardha City | |||||
| 1.01 | BITUMINOUSCONCRETE:-Providing and
laying bituminous concrete using crushed
aggregates of grading1, premixed with
bituminous binder @5.20 percent by weight
of total mix and filler, transported to site with
VTS, laid over a previously prepared surface,
finished to the required grade, level,
alignment, and rolling to achieve the desired
compaction for 50 mm compacted thickness
with specified grade of Bitumen, Excluding
prime /tack coat. For Bitumen of specified
grade--USING Batch mix type hot mix plant
with SCADA, Sensor Paver, Vibratory roller
with Stone Dustfiller.(VG-30 bulk bitumen
rates are considered to arrive at rates) …etc
( Provide Rate For Per Cubic Meter) | 1 | CUM | 16,000 ₹16,000 Lowest | 16,500 ₹16,500 |
| 2.01 | Providing and Laying hot applied thermoplastic road marking
strip on Bituminous Surface of specified shade / colour of 2.5
mm thick including 1.5 Refractive index reflect orizing glass
beads @250 gm/sqm. Thickness of 2.5 mm is exclusive of
surface applied glass beads as per IRC 35:2015. Initial Dry
reflectivity RL shall be>250 mcd /sqm /lux measured in the
initial 7 days and sustained reflectivity RL of 100 mcd / sqm /
lux and Q d of 100 mcd /sqm /lux measured at the end of
2years by means of a Standard Reflecto meter of Zehntner,
Easy lux, Delta make capable of measuring RL & Q D both
according to IRC 35:2015 clause 15.5. The finished surface
to be level, uniform, and free from streak sand holes
complete as per direction of Engineer-in-charge and in
accordance with applicable specifications. (Refer MORTH
Clause 803 for technical Specification and Performancefor
IRC 35:2015).…etc
( Provide Rate For Per Sq. M) | 1 | Sqm | 600 ₹600 Lowest | 650 ₹650 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
18 May 2026, 5:00 pmClosed
C O M C Wardha
MC Wardha
Construction of BT Speed Braker at various Location in Wardha City (2nd call)
2026_DMA_1301572_1
MCW/PWD/1754/2026
Open Tender
Civil Works
Item Rate
365 days
Wardha
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹5,000
19 Jun 2026
9 May 2026
19 May 2026
9 May 2026
18 May 2026
9 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of BT Speed Braker at various Location in Wardha City | |||||
| 1.01 | BITUMINOUSCONCRETE:-Providing and
laying bituminous concrete using crushed
aggregates of grading1, premixed with
bituminous binder @5.20 percent by weight
of total mix and filler, transported to site with
VTS, laid over a previously prepared surface,
finished to the required grade, level,
alignment, and rolling to achieve the desired
compaction for 50 mm compacted thickness
with specified grade of Bitumen, Excluding
prime /tack coat. For Bitumen of specified
grade--USING Batch mix type hot mix plant
with SCADA, Sensor Paver, Vibratory roller
with Stone Dustfiller.(VG-30 bulk bitumen
rates are considered to arrive at rates) …etc
( Provide Rate For Per Cubic Meter) | - | CUM | 13,467.65 | - |
| 2.01 | Providing and Laying hot applied thermoplastic road marking
strip on Bituminous Surface of specified shade / colour of 2.5
mm thick including 1.5 Refractive index reflect orizing glass
beads @250 gm/sqm. Thickness of 2.5 mm is exclusive of
surface applied glass beads as per IRC 35:2015. Initial Dry
reflectivity RL shall be>250 mcd /sqm /lux measured in the
initial 7 days and sustained reflectivity RL of 100 mcd / sqm /
lux and Q d of 100 mcd /sqm /lux measured at the end of
2years by means of a Standard Reflecto meter of Zehntner,
Easy lux, Delta make capable of measuring RL & Q D both
according to IRC 35:2015 clause 15.5. The finished surface
to be level, uniform, and free from streak sand holes
complete as per direction of Engineer-in-charge and in
accordance with applicable specifications. (Refer MORTH
Clause 803 for technical Specification and Performancefor
IRC 35:2015).…etc
( Provide Rate For Per Sq. M) | - | Sqm | 687.05 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_2234966.xls
BOQ • 0.33 MB
an.pdf
Other Document • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .