Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Finance | ₹3.1 L | L1 | Admitted-Finance |
| 2 | L2₹3.2 LAdmitted-Finance VILL MARANG LOIYA AT BALUMATH BLOCK COLONY PO BALUMATH PS BALUMATH DIST LATEHAR JHARKHAND 829202 | BALUMATH | LATEHAR | JHARKHAND | 829202 | ₹3.2 L | L2 | Admitted-Finance |
| 3 | L3₹4.1 LAdmitted-Finance | ₹4.1 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S HINDUSTAN ENTERPRISES L2 | M/S MD EKBAL ANSARI L3 | MD ARBAZ ANSARI L1 |
|---|---|---|---|---|---|---|
| 1.00Replacement work failed transmission assembly cleaning and replacement of transmission control valve assembly Embodiment of engine n transmission guard re-building and replacement of engine assembly mounting bolts and attached housing along with damaged Chasis frame rebuilding and replacement of UJ assembly of dozer Sl No 11900 under TTK OCP Rajhara Area | ||||||
| 1.01 | Replacement work failed transmission assembly cleaning and replacement of transmission control valve assembly Embodiment of engine n transmission guard re-building and replacement of engine assembly mounting bolts and attached housing along with damaged Chasis frame rebuilding and replacement of UJ assembly of dozer Sl No 11900 under TTK OCP Rajhara Area | 1 | JOB | 3,19,537 ₹3.2 L | 4,06,957.5 ₹4.1 L | 3,12,000.75 ₹3.1 L |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹3.6 L
EMD Value
₹4,500
Closing Date
13 May 2026, 6:00 pmClosed
SO(X) RA
SO(X), Rajhara Area, Chandwa
Replacement work failed transmission assembly cleaning and replacement of transmission control valve assembly Embodiment of engine n transmission guard re-building and replacement of engine assembly mounting bolts and attached housing along with dam
2026_CCL_358956_1
PE(X)/TTK OCP Excv/Tend/26-27/02
Open Tender
Excavation Department Work
10 days
PE(X) TTK OCP
HEMM
2 documents required · 2 mandatory
₹4,500
27 May 2026
2 May 2026
14 May 2026
2 May 2026
13 May 2026
2 May 2026
2 May 2026 - 12 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Replacement work failed transmission assembly cleaning and replacement of transmission control valve assembly Embodiment of engine n transmission guard re-building and replacement of engine assembly mounting bolts and attached housing along with damaged Chasis frame rebuilding and replacement of UJ assembly of dozer Sl No 11900 under TTK OCP Rajhara Area | ||||||
| 1.01 | Replacement work failed transmission assembly cleaning and replacement of transmission control valve assembly Embodiment of engine n transmission guard re-building and replacement of engine assembly mounting bolts and attached housing along with damaged Chasis frame rebuilding and replacement of UJ assembly of dozer Sl No 11900 under TTK OCP Rajhara Area | - | JOB | 3,01,450 | - | BI01010001010000000000000515BI0100001113 |
| 2Total impact of GST for the purpose of CTC | ||||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.81 MB
BOQ_371827.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid