Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-Finance PLOT NO 30 KRISHNA COTTAGE SUNDARAM NAGAR MUTHAIPURAM TUTICORIN 628 005 | TUTICORIN | TUTICORIN | TAMIL NADU | 628005 | ₹6.9 L | L1 | Accepted-Finance BOQ Rate accepted |
| 2 | L2₹6.6 LAccepted-Finance | ₹6.6 L | L2 | Accepted-Finance BOQ Rate accepted |
| Sl No | Description | Qty | Unit | Ramakrishna Enterprises | sriram |
|---|---|---|---|---|---|
| 1.00 | Providing two legged scaffolding at different elevations using 10-13 cm dia casuarina props, distance between two rows being 1.25m and spacing of posts being 2m in both rows, with two horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to step up and providing a platform with C.W Planks of 40mm thick and 1m width etc., complete using coir and nails. | 5 | Rm | 18,075 ₹21,328.50 | 17,750 ₹20,945 |
| 2.00 | Dismantling the existing RCC for the required width & depth as per the instructions of Engineer in charge and disposing the debris 1 Km. away from the site including cost of all materials, labours, lead, lift, curing, etc. complete. | 1.6 | M3 | 7,992 ₹9,430.56 | 7,680 ₹9,062.40 |
| 3.00 | Dismantling the existing doors and windows including removal of frames, hinges and fastenings including cost of all materials, lead, lift, devolution to stores, etc., complete | 4 | M2 | 700 ₹826 | 680 ₹802.40 |
| 4.00 | Chipping the existing concrete and roughening the surface for future bonding and thorough cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete. | 22.8 | M2 | 1,071.6 ₹1,264.49 | 1,048.8 ₹1,237.58 |
| 5.00 | Providing HILTI joint arrangements to the rods by drilling holes into the old concrete and new concrete to a required depth and injecting motor HIT-RE 500 @ 0.50ml./mm chemicals, rate including the cost of chemical, drilling arrangements, labour charges, lead, lift, etc., complete | 6,400 | mm | 64,000 ₹75,520 | 57,600 ₹67,968 |
| 6.00 | Providing centering and shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, etc., complete. | 32.6 | M2 | 36,512 ₹43,084.16 | 35,860 ₹42,314.80 |
| 7.00 | Providing RCC 1:1.5:3 using OP cement with 12 to 20mm HBG metal including cost of all materials, labours, lead, lift, tools, curing etc. complete. excluding cost of formwork and reinforcement. | 8.8 | M3 | 93,808 ₹1.1 L | 90,640 ₹1.1 L |
| 8.00 | Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift, tools etc., complete. | 704 | Kg | 70,400 ₹83,072 | 68,992 ₹81,410.56 |
| 9.00 | Brick work in CM 1:5 using fly ash bricks including cost of all materials, labours, lead, lift, curing, etc. complete. | 9.4 | M3 | 68,150 ₹80,417 | 65,800 ₹77,644 |
| 10.00 | Plastering with C.M 1:3, 12 mm thick including cost of all materials, labours, lead, lift, curing, etc. complete. | 76.9 | M2 | 25,377 ₹29,944.86 | 24,608 ₹29,037.44 |
Tender Value
Refer Docs
EMD Value
₹7,000
Closing Date
7 Jan 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS Tuticorin
Improvement Works by Providing New Boiler Operator Room at 18m level Feeder Floor in Unit 4 and 5 Power House area
2025_EB_632975_1
CE SE C TTPS Spec.No. 348 25 26
Open Tender
Civil Works - Others
90 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,000
Yes
9 Jan 2026
16 Dec 2025
8 Jan 2026
16 Dec 2025
7 Jan 2026
16 Dec 2025
Providing two legged scaffolding at different elevations using 10-13 cm dia casuarina props, distance between two rows being 1.25m and spacing of posts being 2m in both rows, with two horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to step up and providing a platform with C.W Planks of 40mm thick and 1m width etc., complete using coir and nails.
Dismantling the existing RCC for the required width & depth as per the instructions of Engineer in charge and disposing the debris 1 Km. away from the site including cost of all materials, labours, lead, lift, curing, etc. complete.
Dismantling the existing doors and windows including removal of frames, hinges and fastenings including cost of all materials, lead, lift, devolution to stores, etc., complete
Chipping the existing concrete and roughening the surface for future bonding and thorough cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing HILTI joint arrangements to the rods by drilling holes into the old concrete and new concrete to a required depth and injecting motor HIT-RE 500 @ 0.50ml./mm chemicals, rate including the cost of chemical, drilling arrangements, labour charges, lead, lift, etc., complete
Providing centering and shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, etc., complete.
Providing RCC 1:1.5:3 using OP cement with 12 to 20mm HBG metal including cost of all materials, labours, lead, lift, tools, curing etc. complete. excluding cost of formwork and reinforcement.
Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift, tools etc., complete.
Brick work in CM 1:5 using fly ash bricks including cost of all materials, labours, lead, lift, curing, etc. complete.
Plastering with C.M 1:3, 12 mm thick including cost of all materials, labours, lead, lift, curing, etc. complete.
Plastering with CM 1:5, 12mm thick including cost of all materials, labour, lead, lift etc., complete.
Terrace flooring (weathering course) with one course of pressed tiles 200 x 200 x 20mm over CM 1:3, 20mm thk mixed with crude oil 10% by weight of cement and pointing with the same oiled mortar with required slope over RCC roof slab including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing and fixing of aluminium framed and panelled door with 12mm thick prelaminated Medium density fiber (MDF) at bottom and 5.5mm thick plain glass at Top using aluminium door frame of size 100mm x 45mm x 2mm and shutter frame of size 45mm x 45mm for sides, top& middle and 100mm x 45mm at bottom and confirming to relevant IS including all fittings and furniture's, floor spring, handle, cost of all materials, labour charges, fixing, finishing etc., complete.
Providing and fixing in position of new anodised aluminium windows of approved manufacture with aluminium 65 x 38 x 2.50 mm as main outer frame and inner frame with section 62 x 30 x 1.50 mm for top sides and bottom and shutter frame with section 39 x 19 x 1.50 mm for vertical plain inter lock and bottom etc including all fittings/ fixture confirming to relevent IS to ensure smooth operation and glazzed with 4 mm plain glass panels as sliding type as per instruction's of site Engineer, rubber lining with standard hardwares such as special wheel maruthi lock 'U' Rubber beading screws, join cleats etc., including cost of all material, lead lift, transporting including the dismantling existing broken glasses and damaged aluminium shutter from the window and devoluting the same to the stores etc., complete.
Providing two coats with ready mixed plastic emulsion interior walls) of first class quality paint & approved colour over a priming coat including cost of all materials, labours, lead, lift, etc. complete.
Providing two coats with ready mixed plastic emulsion (exterior walls) of first class quality paint & approved colour over a priming coat including cost of all materials, labours, lead, lift, etc. complete.
Providing false ceiling with Thermocoal 25mm thick over the Aluminium section 25 x 25 x 1mm (T & L angle) with 50cm c/c in one direction 100cm c/c in another direction with 6mm dia M.S. rod as stiffner at a distance of 1.25m c/c including cost of all materials, labour, lead, lift, scaffolding charges etc., complete.
Providing and fixing floor tiles of 305 x 305 x 6mm first quality design ceramic tiles of approved colours in CM 1:3, 20mm thick and pointing with white cement 0.4 Kg/Sqm including cost of tiles labour, lead, lift, etc., complete.
Supplying laying and jointing in position of 15mm dia GI pipes ('B' Class) including GI specials as instructed by the site Engineer rate including cost of all materials, labour, lead, lift etc., complete.
Supplying laying and jointing in position of 25mm dia GI pipes ('B' Class) including GI specials as instructed by the site Engineer rate including cost of all materials, labour, lead, lift etc., complete.
Supplying and fixing various size 15mm & 25 mm) GM valve / wheel valve of various sizes including cost of valve, labour, lead, lift, etc., complete. A) 15MM GM valve
b) 25mm GM valve
Supplying and fixing White wash basin 550 x 400mm with all accessories such as iron brackets,32mm waste coupling, rubber plug & chain, 32mm dia B class G.I water pipe, 15mm dia G.M wheel valve,15mm dia neylon connection 15mm dia. brass nipples, 15mm C.P piller tap, etc. including cost of all material, labours, lead, lift, curing, etc. complete.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_757280.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid