| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹3.7 CrAWARDED | ₹3.7 Cr | AWARDED |
Tender Value
₹3.5 Cr
EMD Value
₹5.2 L
Closing Date
17 Mar 2025, 9:30 pmClosed
Public Works Department
Improvements to Road from Hyarane Junction to Holenarasipura state Highway-109 (via Hyarane- Beekanahalli-Channangihally-Ankapura-Karle Hanumanahally-Paduvalahippe) Hyarane Junction to Sankanahally limit in Holenarasipura taluk.
PWD/2024-25/RD/WORK_INDENT18807
PWD/2024-25/RD/WORK_INDENT18807
Open
Roads
Two Tender Document System(Two Cover)
PWD Division Office Hassan
₹5,000
₹5.2 L
3 Mar 2025
3 Mar 2025
18 Mar 2025
15 Mar 2025
14 Mar 2025
Improvements to Road from Hyarane Junction to Holenarasipura state Highway-109 (via Hyarane- Beekanahalli-Channangihally-Ankapura-Karle Hanumanahally-Paduvalahippe) Hyarane Junction to Sankanahally limit in Holenarasipura taluk.
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. Ref to MoRT&H : IRC - 3...
Preparation and Surface Treatment of Formation. - Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, t...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Granular Sub-Base - Plant Mix Method - Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material...
Dry Lean Cement Concrete Sub-base - Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse...
Plain Cement Pavement Quality M30 grade Concrete (RMC) with OPC & GGBS laid without Paver - Construction of un-reinforced plain cement concrete pavement using RMC M-30 grade with OPC @ 270 ...
Supplying, fitting and placing Mild Steel Reinforcement complete as per drawing and technical specification. ---- With all lead and lift including cost and conveyance of all materials,labour, hire cha...
Concrete Works - Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm in concrete slab using concrete cutting machine with diamond studded saw within 4-8 hours of casting of bay...
Concrete Works - Providing to contraction joints polysuphide sealent (Pouring grade) confirming to BS : 5212 - 1989 into sawed groove widened at top for sealent reservoir of specified siz...
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface - Providing and laying of hot applied thermoplastic compound 2.5 mm thick including ref...
Direction and Place Identification Signs upto 0.9 m2 Size Board. - Providing and erecting direction and place identification retro- reflectorised sign as per IRC:67:2022 made of high intensity...
Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI ret...
Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI ret...
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
PIPE CULVERTS - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row - Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Cable Duct Across the Road - Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of sl...
Metal Beam Crash Barrier - Type - A, W : Metal Beam Crash Barrier - Providing and erecting a W metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm...
Part C -For Road Maintainance (THIRD YEAR MAINTAINANCE)
Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. ---- With all lead and lift including cost and conveyance of all materials,l...
Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical speci...
Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with app...
Patching of Potholes - Patching of Shallow Potholes using SDBC Gr II 25 mm thick - Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The ...
Patching of Potholes - Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to ...
Part C -For Road Maintainance (FOURTH YEAR MAINTAINANCE)
Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. ---- With all lead and lift including cost and conveyance of all materials,l...
Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical speci...
Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with app...
Patching of Potholes - Patching of Shallow Potholes using SDBC Gr II 25 mm thick - Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The ...
Patching of Potholes - Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to ...
Part C -For Road Maintainance (FIFTH YEAR MAINTAINANCE)
Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. ---- With all lead and lift including cost and conveyance of all materials,l...
Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical speci...
Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with app...
Patching of Potholes - Patching of Shallow Potholes using SDBC Gr II 25 mm thick - Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The ...
Patching of Potholes - Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25 mm thick: Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to ...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .