| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹26.9 LAccepted-AOC | ₹26.9 L | 1 | Accepted-AOC Lowest Amount Quoted by P.MUTHUSAMY for Rs. 26,89,953.00. |
| 2 | Rejected-Technical | - | - | Rejected-Technical Document Not Uploaded So Not Eligible |
| Sl No | Description | Qty | Unit | P.MUTHUSAMY L1 |
|---|---|---|---|---|
| 1.10 | Earth work excavation and depositing on bank with initial lead of 10 meters and initial lift of 2 meters in hard stiff clay, stiff block cotton hard red earth, murrains, gravel stoney earth and earth mixed with small size boulders and hard gravel soil etc., complete as per standard specification
A) Hard stiff clay, stiff black cotton, hard red earth, shales etc. | 99 | M3 | 263 ₹26,037 |
| 1.20 | Earth work excavation and depositing on bank with initial lead of 10 meters and initial lift of 2 meters in hard stiff clay, stiff block cotton hard red earth, murrains, gravel stoney earth and earth mixed with small size boulders and hard gravel soil etc., complete as per standard specification
B) Soft disintegrated rock, laterite, soft rock, kankar not requiring blasting | 95 | M3 | 276 ₹26,220 |
| 1.30 | Earth work excavation and depositing on bank with initial lead of 10 meters and initial lift of 2 meters in hard stiff clay, stiff block cotton hard red earth, murrains, gravel stoney earth and earth mixed with small size boulders and hard gravel soil etc., complete as per standard specification
C) Medium rock and dence medium rock not requiring blasting | 81 | M3 | 276 ₹22,356 |
| 2.00 | Plain Cement Concrete 1:4:8 (one cement,four sand and eight aggregate) mix using 40mm gauge hand broken hard granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm well rammed etc., complete complying with standard specifications. | 15 | M3 | 5,544 ₹83,160 |
| 3.10 | Supplying and erecting centering for sides and soffits including supports and strutting upto 3.00m height for plane surface such as RCC Slab, Rectangular Beams, Tee (or) ELL Beams, Lintel Bed Block, Slabs, Landing Slabs, Beams Canopy, Side Slab (or) Square (or) Round columns etc., as detailed below with all cross branching using M.S. Sheets of size 80cm x 60cm and B.G. 10 stiffended with welded M.S. Angles of size 25 x 25 x 3mm for boarding laid over silver oak or country wood joints of 10cm to 30cm to dia spaced at 75cm c/c etc., complete complying with standard specifications as directed by departmental officers etc., complete.
A) For 0.00 to 3.30 M (Plane Surface) | 9 | M2 | 489 ₹4,401 |
| 3.20 | Supplying and erecting centering for sides and soffits including supports and strutting upto 3.00m height for plane surface such as RCC Slab, Rectangular Beams, Tee (or) ELL Beams, Lintel Bed Block, Slabs, Landing Slabs, Beams Canopy, Side Slab (or) Square (or) Round columns etc., as detailed below with all cross branching using M.S. Sheets of size 80cm x 60cm and B.G. 10 stiffended with welded M.S. Angles of size 25 x 25 x 3mm for boarding laid over silver oak or country wood joints of 10cm to 30cm to dia spaced at 75cm c/c etc., complete complying with standard specifications as directed by departmental officers etc., complete.
B) For 0.00 to 3.30 M (Curved Surface) | 221 | M2 | 1,627 ₹3.6 L |
| 3.30 | Supplying and erecting centering for sides and soffits including supports and strutting upto 3.00m height for plane surface such as RCC Slab, Rectangular Beams, Tee (or) ELL Beams, Lintel Bed Block, Slabs, Landing Slabs, Beams Canopy, Side Slab (or) Square (or) Round columns etc., as detailed below with all cross branching using M.S. Sheets of size 80cm x 60cm and B.G. 10 stiffended with welded M.S. Angles of size 25 x 25 x 3mm for boarding laid over silver oak or country wood joints of 10cm to 30cm to dia spaced at 75cm c/c etc., complete complying with standard specifications as directed by departmental officers etc., complete.
C) For 0.00 to 3.30 M (FOR ROUND COLUMN) | 2 | M2 | 1,302 ₹2,604 |
| 3.40 | Supplying and erecting centering for sides and soffits including supports and strutting upto 3.00m height for plane surface such as RCC Slab, Rectangular Beams, Tee (or) ELL Beams, Lintel Bed Block, Slabs, Landing Slabs, Beams Canopy, Side Slab (or) Square (or) Round columns etc., as detailed below with all cross branching using M.S. Sheets of size 80cm x 60cm and B.G. 10 stiffended with welded M.S. Angles of size 25 x 25 x 3mm for boarding laid over silver oak or country wood joints of 10cm to 30cm to dia spaced at 75cm c/c etc., complete complying with standard specifications as directed by departmental officers etc., complete.
D) For 3.30 M- 4.3 M (Plane Surface) | 66 | M2 | 1,085 ₹71,610 |
| 3.50 | Supplying and erecting centering for sides and soffits including supports and strutting upto 3.00m height for plane surface such as RCC Slab, Rectangular Beams, Tee (or) ELL Beams, Lintel Bed Block, Slabs, Landing Slabs, Beams Canopy, Side Slab (or) Square (or) Round columns etc., as detailed below with all cross branching using M.S. Sheets of size 80cm x 60cm and B.G. 10 stiffended with welded M.S. Angles of size 25 x 25 x 3mm for boarding laid over silver oak or country wood joints of 10cm to 30cm to dia spaced at 75cm c/c etc., complete complying with standard specifications as directed by departmental officers etc., complete.
E) For 3.30 M TO 4.30M (Curved Surface) | 5 | M2 | 1,627 ₹8,135 |
| 4.00 | Supplying fabricating and placing in position of RTS steel rods for reinforcement including the cost of steel and binding wire etc., complete and as directed by departmental Officers. | 6,000 | Kg | 92 ₹5.5 L |
Updated dates
Tender Value
₹33 L
EMD Value
₹33,000
Closing Date
5 Nov 2025, 3:00 pmClosed
Executive Officer Thondamuthur Town Panchayat
Thondamuthur Town Panchayat, Thondamuthur Post, Perur Taluk, Coimbatore District.
Construction of 2.00 Lakh Litters Capacity of Sump at Ward No.09, Barber Colony in Thondamuthur Town Panchayat
2025_DTP_618392_1
307-1/2025
Open Tender
Civil Works - Water Works
365 days
Thondamuthur Town Panchayat
Class III and Above
3 documents required · 3 mandatory
₹0
₹33,000
Yes
20 Jan 2026
29 Oct 2025
5 Nov 2025
29 Oct 2025
5 Nov 2025
29 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
Tendernotice_2.pdf
PDF • 0.29 MB
BOQ_739135.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid