| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹26.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹26.1 L+₹14,703.71 (0.57%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹26.4 L+₹40,615.36 (1.56%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹28.3 L+₹2.3 L (8.77%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹29.7 L+₹3.7 L (14.1%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹38.3 L
EMD Value
₹76,660
Closing Date
4 May 2026, 4:00 pmClosed
Er. Layaqit Ali (Executive Engineer)
OFFICE OF THE EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
Please Refer to BOQ.
2026_PWDJK_308258_1
e-NIT No.06 of 2026-27 Dated 20-04-2026
Open Tender
Civil Works
Percentage
150 days
SURANKOTE
Please Refer to Technical Bid as per Conditions of e-NIT.
2 documents required · 2 mandatory
₹1,100
EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
₹76,660
19 May 2026
20 Apr 2026
5 May 2026
20 Apr 2026
4 May 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in- harge.
All kinds of soil : | 150.65 | Cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.All works upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size). | 11.19 | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.All works upto plinth level in 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) . | - | Cum | 5,733.6 | - |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand). | - | Cum | 7,571.55 | - |
| 5 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level. | - | Cum | 1,455.65 | - |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | - | Cum | 9,821.85 | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Mild steel and medium tensile steel bars. | - | kg | 115.35 | - |
| 8.1 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | - | sqm | 628.95 | - |
| 8.2 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns. | - | sqm | 286.35 | - |
| 8.3 | Centering and shuttering including strutting, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access platforms. | - | Cum | 718.2 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.37 MB
BOQ_999170.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .