Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹26.0 LAdmitted-Finance | -32.17% | ₹26.0 L | L1 | Admitted-Finance |
| 2 | L2₹26.1 LAdmitted-Finance | -31.79% | ₹26.1 L | L2 | Admitted-Finance |
| 3 | L3₹26.4 LAdmitted-Finance | -31.11% | ₹26.4 L | L3 | Admitted-Finance |
| 4 | L4₹28.3 LAdmitted-Finance | -26.22% | ₹28.3 L | L4 | Admitted-Finance |
| 5 | L5₹29.7 LAdmitted-Finance | -22.60% | ₹29.7 L | L5 | Admitted-Finance |
Tender Value
₹38.3 L
EMD Value
₹76,660
Closing Date
4 May 2026, 4:00 pmClosed
Er. Layaqit Ali (Executive Engineer)
OFFICE OF THE EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
Please Refer to BOQ.
2026_PWDJK_308258_1
e-NIT No.06 of 2026-27 Dated 20-04-2026
Open Tender
Civil Works
150 days
SURANKOTE
Please Refer to Technical Bid as per Conditions of e-NIT.
2 documents required · 2 mandatory
₹1,100
EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
₹76,660
19 May 2026
20 Apr 2026
5 May 2026
20 Apr 2026
4 May 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in- harge.
All kinds of soil : | 150.65 | Cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.All works upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size). | 11.19 | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.All works upto plinth level in 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) . | - | Cum | 5,733.6 | - |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand). | - | Cum | 7,571.55 | - |
| 5 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level. | - | Cum | 1,455.65 | - |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | - | Cum | 9,821.85 | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Mild steel and medium tensile steel bars. | - | kg | 115.35 | - |
| 8.1 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | - | sqm | 628.95 | - |
| 8.2 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns. | - | sqm | 286.35 | - |
| 8.3 | Centering and shuttering including strutting, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access platforms. | - | Cum | 718.2 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.37 MB
BOQ_999170.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid