Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹39.8 LAdmitted-Finance | -55.51% | ₹39.8 L | L1 | Admitted-Finance |
| 2 | L2₹45.2 L+₹5.4 L (13.5%)Admitted-Finance | -49.52% | ₹45.2 L+₹5.4 L (13.5%) | L2 | Admitted-Finance |
| 3 | L3₹51.8 L+₹11.9 L (29.9%)Admitted-Finance | -42.20% | ₹51.8 L+₹11.9 L (29.9%) | L3 | Admitted-Finance |
| 4 | L4₹54.7 L+₹14.9 L (37.4%)Admitted-Finance | -38.87% | ₹54.7 L+₹14.9 L (37.4%) | L4 | Admitted-Finance |
| 5 | L5₹70.9 L+₹31.0 L (77.9%)Admitted-Finance | -20.86% | ₹70.9 L+₹31.0 L (77.9%) | L5 | Admitted-Finance |
Tender Value
₹89.5 L
EMD Value
₹1.8 L
Closing Date
24 Aug 2026, 4:00 pmClosed
Executive Engineer FCD Jammu
Executive Engineer FCD Jammu
Construction of out-let drain of Surinsar Lake for the protection of agriculture land and houses and protection to houses at Surinsar in Nagrota Block
2026_IFC_320290_1
e-NIT No. 11 of 2026-27
Open Tender
Civil Works
Percentage
90 days
Jammu
as per nit
2 documents required · 2 mandatory
₹3,000
Chief Engineer I and FC Department account
₹1.8 L
2 Sept 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
24 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil : | |||||
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil: | - | Cum | 1 | - |
| 3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | |||||
| 4Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | |||||
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 1 | - |
| 6Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level : Cold twisted bars | |||||
| 7Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 7.01 | Foundations, footings, bases of columns etc. for mass concrete. | - | Sqm | - | - |
| 7.02 | Suspended floors, roofs, landings, balconies and access platforms. | - | Sqm | - | - |
| 7.03 | Edges of slabs and breaks in floors and walls above 20cm wide | - | Sqm | 1 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_1064256.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .