Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st lowest₹33.8 LAccepted-AOC | ₹33.8 L | 1st lowest | Accepted-AOC 1st Lowest |
| 2 | 2nd lowest₹35.5 L+₹1.6 L (4.87%)Rejected-Finance L 411 HOUSING BOARD COLONY DAVORLIM NAVELIM SALCETE GOA | SOUTH GOA | GOA | 403103 | ₹35.5 L+₹1.6 L (4.87%) | 2nd lowest | Rejected-Finance 2nd Lowest |
Tender Value
₹32.8 L
EMD Value
₹65,667
Closing Date
23 May 2022, 3:00 pmClosed
Executive Engineer
Paryatan Bhavan, Patto, Panaji- Goa
AMCofTransformerRAMC of Transformer RMU HTand LT panels installed at Paryatan Bhavan Patto Panaj iGoa
2022_GTDCL_3936_1
GTDC/PC/EE(N)/2022-23/e-02
Open Tender
Electrical Works
Item Rate
1825 days
Panaji
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,000
₹65,667
23 Aug 2022
11 May 2022
25 May 2022
11 May 2022
23 May 2022
17 May 2022
12 May 2022 - 16 May 2022
Amount
HT side:- Servicing of 200 KVA 11 Kv/ 440 V copper wound transformer of Kirloskar make. During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire transformer mechanism and body, checking transformer body and radiators for any leakages , measurements of insulation resistance, ratios and tightness of cables at bushings , etc . Servicing will be carried out as per manufacturer recommended checklist and all necessary routine tests will be carried out at site. At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will be charged extra at actual market rates. The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
Servicing of 500 KVA 11 Kv/ 440 V copper wound transformer of Kirloskar make.Servicing of OLTC , AVR and RTCC panel.During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire transformer mechanism and body, checking transformer body and radiators for any leakages , measurements of insulation resistance, ratios and tightness of cables at bushings , etc .Checking and servicing of OLTC and Rtcc panel. Servicing will be carried out as per manufacturer recommended checklist and all necessary routine tests will be carried out at site. At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will be charged extra at actual market rates. The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
Servicing of 11 Kv 630 Amps SF6 gas RMU, RMU having 2 incoming 630 Amps isolators encapsulated in SF6 gas and 1 outgoing 630amps VCB having a self powered relay with short circuit and over current protection encapsulated in SF6 gas.Make : CG-Lucy. During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist. At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will be charged extra at actual market rates. The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
Filtration of transformer insulating oil of 500 KVA 11 Kv/440V transformer . After filtration the BDV test of the upper level and bottom level will be carried out. This activity will be carried out once in a year.Job also includes change of silica gel in the breather.
Filtration of transformer insulating oil of 200 KVA 11 Kv/440V transformer . After filtration the BDV test of the upper level and bottom level will be carried out. This activity will be carried out once in a year.Job also includes change of silica gel in the breather.
Supply and top up of transformer insulation oil required for top up in the conservator level .
Supply and topping up of silica gel in the breather.
Servicing of 11 KV Vacuum Circuit breaker panels having a draw out type VCB trolley and Control panel having various relays and indication annuciator.Make: Megawin. During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist. At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will be charged extra at actual market rates. The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
LT Side :- Servicing Of Main Incomer ACB panel housing 1 Nos of 1000 Amps ACB.During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist. At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
Servicing of ACB sub main panel Housing 2 nos of 1000 Amps ACB and 1 Nos of 400 Amps MCCB.During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist. At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
Servicng of PCC-1 panel housing 3 Nos of 1000 Amps and other feeder switchgear MCCB's , MCB,s ,Contactors, control circuits, etc.During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist. At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
Servicing of 130 KVAR APFCR panel .During AMC our service engineers will visit your site four times in a year. The servicing will include necessary inspection of all circuit breaker, measurements current distribution on capacitors and checking of contactors . Servicing will be carried out as per manufacturer recommended checklist. At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
Servicng of 200 KVA DG panel .During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist. At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
Servicing of Common service area panel.During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist. At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
Servicing of 400 Amps MCCB and 400 Amps changeover panel.During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist. At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
Servicing of 400 Amps MCCB Standalone panel.During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist. At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
Servicing of Ist floor panel.During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist. At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
Servicing of Second floor panel .During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist. At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
Servicing of UPS distribution panel.During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist. At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
Servicing of AC outdoor panel.During AMC our service engineers will visit your site four times in a year. The servicing will include necessary lubrication of moving parts and checking of the entire breaker mechanism, checking of the closing and tripping time in milli seconds using high precision time scope timer for all circuit breaker, measurements of contact resistance and insulation values . Servicing will be carried out as per manufacturer recommended checklist. At the time of servicing if any spare is found to be faulty then the same will be reported to you and upon you placing the order, the same will be replaced. The cost of the spare parts will becharged extra at actual market rates.The spare part will be replaced free of cost during AMC. Apart from the Scheduled four servicings in a year any number of emergency complaints will be attended for free of cost and within a period of 24 hours from the time of registering complaint.
RELIANCE ELECTRICALS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .