Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
5 Aug 2021, 12:00 pmClosed
SE, EUDC, MATHURA
SE, EUDC OFFICE, NEAR TANK CHAURAHA, MATHURA
Carrying out maintenance in switch yard and replacement of damaged 33 KV Bus Isolator and 33 KV CT and other various works at 33 11 KV Sub Station Rajeev Bhawan under the area of EE, EUDD I, Mathura in the jurisdiction of SE, EUDC, Mathura.
2021_DVVNL_605767_1
60/EUDC(M)/2020-21
Open Tender
Electrical Works
Item Rate
90 days
EE, EUDD I
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
dvvnl.org
₹2,000
17 Aug 2021
23 Jul 2021
5 Aug 2021
23 Jul 2021
5 Aug 2021
23 Jul 2021
Amount
Carefully carriage of the line isolator-01 Nos., Bus Isolator-02 Nos., 33 KV CT 200/100-03Nos., Fuse Set-02 Nos, ACSR Dog conductor-200 mtrs., post insulator etc. from store center, Mathura to work site including loading & unloading at both ends.
Replacement of damaged 33 KV CT 200/100/1A by cutting of rusted bolt with the help of gas cutter including fabrication for proper fixing, if required and connection complete.
Replacement of damaged 33 KV line/bus isolator erected on the isolator structure, adjusting of operating machanism in proper alignment, so as to ensure smooth operation of the same in case of line isolator operation of earth links shall be ensured. The work includes fabrication of proper fixing, nut & bolts etc. required for proper work completion.
Replacement of damaged 33 KV fuse set, opening of old damage post insulator, melted bolts opening or cutting and fitting of copper flat 50x6 for completion of fuse set.
Replacement of damage post insulator by cutting of melted nut & bolts including fabrication for proper fixing of insulator.
Overhauling of existing 33 KV VCB installed in switch yard & tesing of VCB on load properly.
Opening of existing way ACSR dog conductor from 33 KV bus bar to main 33 KV isolator to post insulator, post insulator to fuse set, fuse set to 05 MVA power T/F. at 33/11 KV S/S. Rajeev Bhawan and replacement of new ACSR dog conductor as above proper work completion. The work carried out after shut-down given to execute the work only 4 hrs. maximum in a day.
Connecting of 33 KV isolator, post insulator, fuse set, T/F. by the fitting of connecting clamps.
Painting of the terminal gantry/Bus bar gantry by using alumunium paint 2 coat & Red-oxide single coat including rubbing of structure.
Painting of the fuse set structure, isolator structure by using alumunium paint 2 coat & Red-oxide single coat including rubbing of structure.
Painint of the post insulator structure, LA structure, PT structure by using alumunium paint 2 coat & Red-oxide single coat including rubbing of structure.
Painting of 4 Pole on ST pole by using alumunium paint 2 coat & Red-oxide single coat including rubbing of structure.
M/s S. S. Construction
M/s Rana Traders
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .