| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.0 LAccepted-Finance NO 126 SRI BRINDAVAN 1ST MAIN ROAD KODAMBAKKAM CHENNAI 600024 | CHENNAI | CHENNAI | TAMIL NADU | 600024 | L1 | Accepted-Finance LOW RATE QUOTED | |
| 2 | L2₹14.9 L+₹91,878.34 (6.58%)Rejected-Finance 16 PERUNAL KOIL STREET VEMBEDU VILLAGE AMBUR POST PIN 635701 THENI TAMIL NADU | TIRUPATHUR | TAMIL NADU | 635701 | L2 | Rejected-Finance HIGH RATE QUOTED | |
| 3 | L3₹14.9 L+₹93,653.06 (6.70%)Rejected-Finance | L3 | Rejected-Finance HIGH RATE QUOTED | |
| 4 | L4₹16.3 L+₹2.3 L (16.7%)Rejected-Finance | L4 | Rejected-Finance HIGH RATE QUOTED | |
| 5 | L5₹16.7 L+₹2.7 L (19.2%)Rejected-Finance 3 24 SOUTH STREET ORAKKADU VILLAGE ORAKKADU POST ORAKKADU TAMIL NADU 607103 | ORAKKADU | CUDDALORE | TAMIL NADU | 607103 | L5 | Rejected-Finance HIGH RATE QUOTED |
| Sl No | Description | Qty | Unit | GMR ENTERPRISES L4 | P. Baskar L9 | M/s.DRR INFRASTRUCTURES L1 | AR Constructions L6 | M/s. PCN CONSTRUCTIONS L5 | AADVIK AND ASSOCIATES L2 | V ANANDHAN L8 | M/S. OM MURUGA CONSTRUCTION L3 | P Hari L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction of New OHT 30000ltr Tank at Vadakanallur village in Vadakanallur Panchayat | ||||||||||||
| 2.00Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers | ||||||||||||
| 3.00 | First depth of 2m From 0 to 2 m below GL | 58.55 | cum | 240 ₹14,052 | 280 ₹16,394 | 260 ₹15,223 | 260 ₹15,223 | 230 ₹13,467 | 205.75 ₹12,047 Lowest | 263.5 ₹15,428 | 240 ₹14,052 | 253 ₹14,813 |
| 4.00 | Second depth of 2m From 2m to 4 m below GL | 13.12 | cum | 240 ₹3,149 | 280 ₹3,674 | 260 ₹3,411 | 260 ₹3,411 | 230 ₹3,018 | 205.75 ₹2,699 Lowest | 263.5 ₹3,457 | 240 ₹3,149 | 253 ₹3,319 |
| 5.00 | Sand filling for foundation with clear river sand including cost of sand, watering ,ramming and consolidation etc complete as directed by TWAD Bord officers | 8.75 | cum | 2,100 ₹18,375 | 2,500 ₹21,875 | 2,200 ₹19,250 | 2,200 ₹19,250 | 1,950 ₹17,063 | 1,746.26 ₹15,280 | 2,238.5 ₹19,587 | 1,500 ₹13,125 Lowest | 1,943 ₹17,001 |
| 6.00 | Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete | 4.37 | cum | 5,800 ₹25,346 | 6,200 ₹27,094 | 6,000 ₹26,220 | 5,900 ₹25,783 | 5,245 ₹22,921 | 4,697.39 ₹20,528 Lowest | 6,022 ₹26,316 | 5,100 ₹22,287 | 5,154 ₹22,523 |
| 7.00Reinforced Cement Concrete Mix M30 grade using 10mm & 20mm Hard blue granite Broken stone (machine crushed) excluding the cost of RTS rods for reinforcement and centering, strutting, shuttering but including cost of all materials mixing, laying, Vibrating the concrete with mechanical vibrators, ramming, consolidating, finishing and curing etc., Complete and as directed by the TWAD Board Officers. | ||||||||||||
| 8.00 | Below 1.5m from GL | 13.52 | cum | 8,500 ₹1,14,920 | 9,800 ₹1,32,496 | 9,744 ₹1,31,739 | 9,600 ₹1,29,792 | 8,487 ₹1,14,744 | 7,600.32 ₹1,02,756 Lowest | 8,120 ₹1,09,782 | 8,000 ₹1,08,160 | 8,281 ₹1,11,959 |
| 9.00 | 0m to 1.50m below GL | 1.75 | cum | 8,500 ₹14,875 | 9,800 ₹17,150 | 9,744 ₹17,052 | 9,000 ₹15,750 | 8,487 ₹14,852 | 7,600.32 ₹13,301 Lowest | 9,744 ₹17,052 | 8,000 ₹14,000 | 8,281 ₹14,492 |
| 10.00 | 0m to 4.50m above GL | 2.83 | cum | 8,500 ₹24,055 | 9,900 ₹28,017 | 9,885 ₹27,975 | 9,000 ₹25,470 | 8,610 ₹24,366 | 7,710.35 ₹21,820 Lowest | 9,885 ₹27,975 | 8,000 ₹22,640 | 8,362 ₹23,664 |
Tender Value
₹19.9 L
EMD Value
₹49,625
Closing Date
18 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block development officer (vp)
Sholavaram block office
Construction of New OHT 30000ltr Tank at Vadakanallur Village in Vadakanallur Panchayat
2026_RDTN_721717_1
615/2025/A6
Open Tender
Civil Works
Item Rate
90 days
Sholavaram block office
As per documents
4 documents required · 4 mandatory
₹0
₹49,625
Yes
24 Nov 2026
4 Nov 2026
18 Nov 2026
4 Nov 2026
18 Nov 2026
4 Nov 2026
60 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of New OHT 30000ltr Tank at Vadakanallur village in Vadakanallur Panchayat | - | - | - | - |
| 2 | Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers | - | - | - | - |
| 3 | First depth of 2m From 0 to 2 m below GL | 58.55 | cum | 263.78 | ₹15,444.32 |
| 4 | Second depth of 2m From 2m to 4 m below GL | 13.12 | cum | 263.78 | ₹3,460.79 |
| 5 | Sand filling for foundation with clear river sand including cost of sand, watering ,ramming and consolidation etc complete as directed by TWAD Bord officers | 8.75 | cum | 2,238.79 | ₹19,589.41 |
| 6 | Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete | 4.37 | cum | 6,022.3 | ₹26,317.45 |
| 7 | Reinforced Cement Concrete Mix M30 grade using 10mm & 20mm Hard blue granite Broken stone (machine crushed) excluding the cost of RTS rods for reinforcement and centering, strutting, shuttering but including cost of all materials mixing, laying, Vibrating the concrete with mechanical vibrators, ramming, consolidating, finishing and curing etc., Complete and as directed by the TWAD Board Officers. | - | - | - | - |
| 8 | Below 1.5m from GL | 13.52 | cum | 9,744 | ₹1,31,738.88 |
| 9 | 0m to 1.50m below GL | 1.75 | cum | 9,744 | ₹17,052 |
| 10 | 0m to 4.50m above GL | 2.83 | cum | 9,885.07 | ₹27,974.75 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.40 MB
TENDERDOCUMENTOHT.pdf
Tender Documents • 0.52 MB
BOQ_866896.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .