Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹3.1 L
Closing Date
27 Oct 2026, 2:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CE
Nagar Nigam Ayodhya
Savarkar Nagar ward ke mohalla savarkar nagar mein divendra singh ke makaan se ajay pratap singh ke makaan tak cc sadak va naali nirman karya as per Nit 04
2026_DOLBU_1194608_4
870/Punrod/2026-27
Open Tender
Civil Works
Percentage
45 days
AYodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,350
MC
₹3.1 L
12 Oct 2026
12 Oct 2026
27 Oct 2026
12 Oct 2026
27 Oct 2026
12 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/w in excavation in ordinary soil etc all complete St. No. 251 | 86.4 | Cum | 125 | ₹10,800 |
| 2 | P/LP.C.C. work in 1:6:12 all complete Work SI No 273b | 17.28 | Cum | 3,950 | ₹68,256 |
| 3 | Class 150 brick work in 1.4 Csand all complete. SI No 305b | 62 | Cum | 5,390 | ₹3,34,180 |
| 4 | P/L of C.C. in 1:2:4 with cement, c/sand and stone grit etc all complete. SI No 279b | 0.05 | Cum | 7,850 | ₹392.5 |
| 5 | 12 mm thick plaster in 1:3 with cement and c/sand etc all complete | 151.2 | Sqm | 190 | ₹28,728 |
| 6 | Supply & Laying of G.S.B. etc all complete work. | 178.2 | Cum | 3,866.86 | ₹6,89,074.45 |
| 7 | Providing and laying C.C. pavement of mix M-20 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator, vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-incharge. | 178.2 | Cum | 9,070 | ₹16,16,274 |
| 8 | P/mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect NON METALLIC CC HARDNER (@5kg HARDNER per sqm of surface area SAME AS IN dsr 26.31.1
C.C | 1,188 | Sqm | 96.25 | ₹1,14,345 |
| 9 | RCC work in 1:15:3 with cement c/sand and 20mm stone grit etc | 15.32 | Sqm | 8,400 | ₹1,28,688 |
| 10 | M.S. iron work for RCC slab ete all complete S.I.No 504 | 10.82 | Cum | 7,500 | ₹81,150 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_2255472.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .