Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3 LAccepted-AOC 223 4TH STREET SIVANANDHAPURAM SARAVANAMPATTI PO COIMBATORE 641 035 | COIMBATORE | TAMIL NADU | 641035 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹3.0 L+₹66,968.54 (29.2%)Rejected-Finance | L2 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
2 Mar 2025, 2:00 pmClosed
EE / O M /UDT
EXECUTIVE ENGINEER/ O M UDUMALPET ELECTRICITY DISTRIBUTION CIRCLE, TIRUPPUR ROAD, UDUAMALPET
Running works contract for the Erection works for HT Overhead feeder, LT Overhead feeder, Structure Erection works and Dismantling works for Komaralingam section of Madathukulam Sub division in Udumalpet Division.
2025_EB_525272_1
08/2024-25 Dt.13.02.2025
Open Tender
Electrical Works
Works
Udumalpet
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,000
Yes
28 Mar 2025
15 Feb 2025
3 Mar 2025
15 Feb 2025
2 Mar 2025
15 Feb 2025
15 Feb 2025 - 2 Mar 2025
EXCAVATION and BACKFILLING OF POLE PITS / Stay Set:
For pole upto 8.00m length by using JCB/Manually
For pole above 8.00m length by using JCB/Manually
In Hard Soil (common to all size of poles)
In Medium rock Soil
In rocky area (common to all size of poles) by blasting / Manually
Excavation & backfilling of structure pole pit 3 x 3 x 6 feet by using JCB or Manual for single pole DT structure
Excavation and back filling of Stay pit of 4.5 ' to 5 ' depth using JCB / Manually
Excavation and back filling of Stay pit in Hard rock soil requires blasting
Excavation and back filling of Stay pit in Hard rock soil with out blasting
Excavation and back fillingof Stay pit inmedium rock and dense medium rock requires blasting
ERECTION OF POLES AND STRUCTURE
Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manually
Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manually
Erection of metal supports above 9m / RSJ / Rail Pole/Tubular Poles
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.
Erection of additional Stay in the same stay rod, excluding excavation of stay pit and burial of stay rod.
Erection of 11 / 22 KV AB switch (Horizontal)
Erection of 11 / 22 KV AB switch (Vertical)
Erection of HG Fuse Set, 3 Nos. (in Double Pole or Single Pole Structure)
Erection of top channel for double pole DT structure
Erection of bed channel 2 Nos. for double pole DT structure
Erection of cross with stud for bed channel
Erection of belting angle 2 Nos. for double pole DT structure
Erection of cross bracing set for double pole DT structure
Structure earthing complete with 3 pits and earth loops for double pole DT structure
Feeding arrangements with open type fuse unit for double pole DT structure
HT jumpering complete for double pole DT structure
Painting of all clamps and other iron materials and painting of structure pole for double pole DT structure
LT bus arrangement for double pole DT structure
DT yard cleaning and making uniform surface for double pole DT structure
Erection of double pole DT structure complete as per TNEB standard including painting, feeders arrangement, colour washing of poles etc., fixing of HT / LT LAS and jumpering, 3 Nos. earth pits with earth trough except erection of DT-Annexure-I
Erection of tapping channel for single pole DT structure
Erection of transformer bed structure for single pole DT structure
Structure earthing complete with 3 pits and earth loops for single pole DT structure
Feeding arrangements with open type fuse unit for single pole DT structure
HT jumpering complete for single pole DT structure
Painting of all clamps, other materials and painting of structure pole for single pole DT structure
LT cable arrangement for single pole DT structure
Erection of central supporting arrangement for single pole DT structure
Erection of 22 KV single pole structure complete with centre support without erection of DT-Annexure-II
Fixing of danger board
Erection of distribution transformer at structure - Upto 25 KVA
Erection of distribution transformer at structure - Above 25 KVA to 100 KVA
Erection of distribution transformer at structure - Above 100 KVA to 250 KVA
Erection of distribution transformer at structure - 500 KVA and above
Erection of Integrated DT Metering Arrangements
Erection of Integrated DT Metering Arrangements Whole Current Meter
Erection of metering set 11 KV / 22 KV
Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc. - With 22 / 33 KV AB switch using all types of poles of size 9 m and above length
Erection of single pole DP complete and with single earth
Fixing /Dismandling of Line Materials
Fixing V cross arm 4.5 feet and 5 feet
Fixing of LT S phase cross arm
Fixing of LT 3 phase cross arm
Fixing of HT / LT Ti fitting
Fixing of HT PIN insulator with Pin 22 kv
Fixing of HT PIN insulator with Pin 33 kv
Fixing of LT PIN insulator
Fixing of HT strain disc 11 KV
Fixing of HT strain disc 22 KV
Fixing of HT strain disc 33 KV
Fixing of shackle
Fixing of Aluminium knob
Fixing of HT LAS (3 Nos.)
Fixing of lT LAS (3 Nos.)
Fixing of Tapping channal X arm
Fixing of Guarding channal X arm
Fixing of Double channal X arm
LT open type fuse unit
Replacement of stay rod only (including stay pit excavation, refilling & erection)
Replacement of guy shackle only in existing stay
Fixing of one set of street light fixture with clamp and fitting of all sizes including cable jumpering and including transportation
Provision of street light switching arrangement including fixing of meter, wiring & service board etc.
Dismandling V cross arm 4.5 feet 5 feet
Dismandling of LT S phase cross arm
Dismandling of LT 3 phase cross arm
Dismandling of HT / LT Ti fitting
Dismandling of HT PIN insulator with Pin 22 kv
Dismandling of HT PIN insulator with Pin 33 kv
Dismandling of LT PIN insulator
Dismandling of HT strain disc 11 KV
Dismandling of HT strain disc 22 KV
Dismandling of HT strain disc 33 KV
Dismandling of shackle
Dismandling of Aluminium knob
Dismandling of Tapping channal X arm
Dismandling of Guarding channal X arm
Dismandling of DOUBLE channal X arm
Dismantling of HT LAS (3 Nos.)
Dismantling of LT LAS (3 Nos.)
Dismantling of 11 / 22 KV AB switch (Horizontal)
Dismantling of 11 / 22 KV AB switch (Vertical)
Dismantling of HG Fuse Set (3 Nos.)
Dismantling of top channel from double pole DT structure
Dismantling of bed channel 2 Nos. from double pole DT structure
Dismantling of cross with stud for bed channel
Dismantling of belting angle 2 Nos. from double pole DT structure
Dismantling of structure earthing complete of double pole DT structure
Dismantling of feeding arrangements with open type fuse unit for double pole DT structure
Dismantling of HT & LT LAS and jumpering complete for double pole DT structure
Dismantling of support insulator angle and 3 Nos. pin insulator from double pole DT structure
Dismantling of HT jumpering complete of double pole DT structure
Dismantling of LT bus arrangement from double pole DT structure
Dismantling of structure earthing complete from single pole DT structure
Dismantling of feeding arrangements with open type fuse unit for single pole DT structure
Dismantling of HT jumpering complete of single pole DT structure
Releasing of DT below 200 KVA from structure
Releasing of DT 200 KVA & above but below 500 KVA from structure
Releasing of DT 500 KVA from strcuture
Dismantling of Integrated DT Metering Arrangements / Whole Current Meter
Dismantling of Modem including accessories
Releasing of metering set 11 KV / 22 KV from strcuture
Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit
Destruction of pole concreting at site
Retrieving grill from deteriorated RCC pole
Dismantling of stay set complete including stay rod
Dismantling of stay set complete without stay rod
Dismantling of guarding arrangement - Flat guarding
Dismantling of guarding arrangement - Split neutral guarding
Dismantling of guarding arrangement - P&T and railway cradle guarding
Dismantling of street light switch box with pipe
Dismantling of one set of street light fixture with clamp and fitting of all types
Releasing and re-erection of single phase SC wire [during conductor or support change]
Releasing and re-erection of 3 phase SC wire [during conductor or support change]
Dismantling and fixing of Single Phase Meter
Dismantling ad fixing of Three Phase Meter
Providing of line spacers in LT line 1 phase
Providing of line spacers in LT line 3 phase
Fixing of LT shunt capacitor
Setting right the leaning pole in HT / LT at pin point location
Setting right the leaning pole in HT / LT at cut point location
Stringing of Conductor / Dismandling
Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor
Paving and stringing of conductors of above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR or other equivalent conductor
Paving and stringing of conductors of above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR or other equivalent conductor
Dismantling of conductor of upto 7/2.59 including transporting the conductors to the nearest road side and stocking in coils
Dismantling of conductor of upto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils
Dismantling of conductor of above 7/3.35 including transporting the conductors to the nearest road side and stocking in coils
CONCRETING WORKS:
Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour)
(i) Mass concreting of poles
(ii) Sleeve concreting
(iii) Stay concreting
LOADING AND UNLOADING CHARGES:
Loading or unloading of Distribution Transformer
(i) Upto 100 KVA
(ii) Above 100 KVA and upto 500 KVA
(iii) 500 KVA
Loading of various sizes of poles
(i) REC, RCC, PSC pole upto 8.00 m length
(ii) All REC, RCC pole above 8.00 m length
(iii) Metal poles all sizes
Unloading of various sizes of poles
(i) REC, RCC, PSC pole upto 8.00 m length
(ii) All REC, RCC pole above 8.00 m length
(iii) Metal poles all sizes
Loading of line materials
Unloading of line materials
Guarding Arrangement and Earthing
Provision of guarding with two numbers earth pits excluding stay set erection
(i) Flat guarding with earth pit
(ii) Split neutral
(iii) Provision of guarding arrangement - P&T and railway cradle guarding
Earthing of pole with GI wires 6 or 8SWG by coil earthing
Provision of spike including earthing arrangement
Pipe earthing including excavation of earth pit and fixing earth pipe 3 m length
Replacement of earthpipe per location
Replacing the corroded earth pipes of transformer structure and replacing the earth wire completely with aluminium lugs for termination
Re-earthing of structure completely
TRANSPORTATION CHARGES:
Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM
Transporting of distribution transformer / metering set from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry)
Transporting of distribution transformer / metering set from stores to office / site above 10 KM distance by engaging 1 Ton capacity Minidor (Lorry)
(i) Transporting of Distribution Transformer / Line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry)
(ii) Above 10 KM
Transporting of conductors of all sizes from road side to pit locations upto one KM of conductor
PAINTING:
Numbering of poles including base painting and with cost of paint
Painting of distribution transformer of all capacities (paint to be supplied by the TANGEDCO) including cleaning of DT
Painting of RSJ / tubular pole including cross arms, TI fittings, single coating
Painting of Cement poles by Distember coating including cost of distember
Painting of structure materials distribution transformers with aluminium paint of structure poles and writing of transformer details (Items 1 to 6 brush to be owned by the contractor)(Paint to be supplied by Department)
Painting of pole at ground
Painting of transformer structure poles with two coats for each structure
Service connection details painting
WORKSHOP CHARGES:
Manufacturing of special type clamps for rail poles, RS joists, tubular pole, distribution transformer strucutre with material
Alteration of back / stay clamp to suit works
Drilling of holes in the structure materials clamps etc.,
AB switch or open type side arm stud, cutting and drilling holes
Cutting of RS joist pole
Welding in RS joist pole
GENERAL:
Jungle clearance such as kattu karuvai in the various area without uprooting
Jungle clearance such as kattu karuvai in the various area with uprooting
Clearing of tree braches of coconut trees
Clearing of tree braches of Neem, Tamarin, Country etc
Leveling of Ground using Bul Dozer
Clearing of Branches / Trees with JCB
SUB - STATION WORK :
DT yard cleaning
Cleaning of RMU
Cleaning of Ring Fencing
Engaging crane per hour (for handling of poles, metering set, DT, etc.)
Engaging JCB per hour (for extension works & maintenance works etc.)
Removing weed in substation yard / office premises
Bush clearance out side substation yard / office premises (light)
Distribution Transformer Maintenance - Silica Gel Replacement
Distribution Transformer Maintenance - Clamps Tightness
Distribution Transformer Maintenance - Busbar Maintenance
Distribution Transformer Maintenance - HG Fuse Maintenance
Distribution Transformer Maintenance - AB Switch Maintenance
Distribution Transformer Maintenance - LT Open Type Maintenance
Distribution Transformer Maintenance - Inspection of Earthing & Tightness
Distribution Transformer Maintenance - Cleaning & Checking of DT Metering Box
Distribution Transformer Maintenance - Cleaning of DT
Distribution Transformer Maintenance - Oil Top Up
Fencing of distribution transformer structure at road side, fabrication and erection (including all materials)
Ground patrolling of HT lines during breakdown
Rectification of snapped HT line during breakdown - Weasel ACSR 7/2.59 or AAAC 7/2.50 sq. mm
Rectification of snapped HT line during breakdown - Rabbit ACSR 7/3.35 or AAAC 7/3.15 sq. mm
Rectification of snapped HT line during breakdown - Raccoon ACSR 7/4.09 sq. mm
Rectification of snapped LT line during breakdown
Replacement of flashed over HT pin insulator, LAS, strain disc including jumpering, binding and transporting of required materials
ssk builders (BID ID -1261477)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .