Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAccepted-Finance | ₹11.4 L | L1 | Accepted-Finance L1 |
| Sl No | Description | Qty | Unit | M/s. SHUBHAM CONSTRUCTIONS H1 |
|---|---|---|---|---|
| 1.00 | Preparation and distribution of bi monthly water bills as per detailed scope of work as under The scope of work includes the work of taking monthly water meter reading every month preparation and distribution of bi monthly water consumption bills with Water Billing Module of RIICO ERP Software in prescribed format updation and preparation of monthly ledger posting of issued bills and recovery of deposited bills preparation of outstanding dues list Defective Stopped meter list and preparation of duplicate water bills on ERP WBM Module and Manually The work of updation of all types of permission applications received for Reconnections Replacement of Water Meter and Change of Consumers Name Connection Size etc and other allied works related to WBM Manually preparation of New Binders and Ledgers for each financial year preparation of water dues balance sheet and reconciliation of water dues recovery with financial ledger Only new binders ledgers for each financial year shall be provided by the Corporation The scope also includes providing services with requisite manpower and all leviable Central State taxes transportation etc complete as per the directions of Engineer In Charge | 9,300 | Per Bill | 84 ₹7.8 L |
| 2.00 | Labour charges of releasing new water connections from distribution system of different sizes 1 2 and above including digging for pipeline, making hole in pipeline fixing clamp on pipeline and fixing of ferrule with G I Pipe for release of a new water connection and making good the surface after back filling of earth in trench including all T and P transportation lead and lift etc complete as per the directions of engineer in charge | 200 | Each | 410 ₹82,000 |
| 3.00 | Labour charges of making water connection D C or RC from distribution system of different sizes half inch and onwards including digging for pipeline making hole plugging hole in pipeline removal or fixing of ferrule with GI Pipe for RC or DC water connection and making good the surface after back filling of earth in trench including all T and P transportation lead and lift etc complete as per the directions of engineer in charge | 150 | Each | 410 ₹61,500 |
| 4.00 | Labour charges for Removing Refixing Replacement of water meter for repairing, including all T and P transportation lead and lift etc complete as per the directions of engineer in charge | 200 | Each | 250 ₹50,000 |
| 5.00 | Labour charges for crossing the water connection pipe under the road crust by manual mechanical means, including all T and P transportation lead and lift etc complete as per the directions of engineer in charge | 100 | Each | 180 ₹18,000 |
| 6.00 | Labour charges for dismantling of cement concrete RCC Platform for making new connection DC RC at site including all T and P transportation lead and lift etc complete as per the directions of engineer in charge | 80 | Each | 410 ₹32,800 |
| 7.00 | Labour charges of checking water connections at connection point from distribution system of different sizes half inch and above including digging at connection point for pipeline checking ferrule point, checking clamp on pipeline and aligning of ferrule with GI Pipe for proper flow of water to pipe line and making good the surface after back filling of earth in trench including all T and P transportation lead and lift etc complete as per the directions of engineer in charge | 75 | Each | 410 ₹30,750 |
| 8.00 | Labour charges of checking disconnected water connections at connection point and nearby from distribution system of different sizes half inch and above including digging at connection point for pipeline checking ferrule point checking clamp on pipeline and alignment of ferrule with GI Pipe if any found at site and making good the surface after back filling of earth in trench including all T and P transportation lead and lift etc complete as per the directions of engineer in charge | 200 | Each | 410 ₹82,000 |
Tender Value
₹12.4 L
EMD Value
₹24,860
Closing Date
27 Mar 2026, 6:00 pmClosed
ADDL GEN MANAGER RIICO JAIPUR
OFFICE OF THE ADDL GENERAL MANAGER RIICO JAIPUR NORTH VKIA JAIPUR
Preparation and distribution of Water Bills of Industrial Areas under Jurisdiction of Unit Jaipur North VKIA Jaipur Rs. 12.43 lakhs
2026_RIICO_546007_1
46/2025-26(7)
Open Tender
Civil Works
365 days
Different Industrial Areas Unit Jaipur North
The tenderer should be registered in appropriate class according to this tender
4 documents required · 4 mandatory
₹1,180
RIICO
₹24,860
1 Apr 2026
16 Mar 2026
30 Mar 2026
16 Mar 2026
27 Mar 2026
16 Mar 2026
Preparation and distribution of bi monthly water bills as per detailed scope of work as under The scope of work includes the work of taking monthly water meter reading every month preparation and distribution of bi monthly water consumption bills with Water Billing Module of RIICO ERP Software in prescribed format updation and preparation of monthly ledger posting of issued bills and recovery of deposited bills preparation of outstanding dues list Defective Stopped meter list and preparation of duplicate water bills on ERP WBM Module and Manually The work of updation of all types of permission applications received for Reconnections Replacement of Water Meter and Change of Consumers Name Connection Size etc and other allied works related to WBM Manually preparation of New Binders and Ledgers for each financial year preparation of water dues balance sheet and reconciliation of water dues recovery with financial ledger Only new binders ledgers for each financial year shall be provided by the Corporation The scope also includes providing services with requisite manpower and all leviable Central State taxes transportation etc complete as per the directions of Engineer In Charge
Labour charges of releasing new water connections from distribution system of different sizes 1 2 and above including digging for pipeline, making hole in pipeline fixing clamp on pipeline and fixing of ferrule with G I Pipe for release of a new water connection and making good the surface after back filling of earth in trench including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
Labour charges of making water connection D C or RC from distribution system of different sizes half inch and onwards including digging for pipeline making hole plugging hole in pipeline removal or fixing of ferrule with GI Pipe for RC or DC water connection and making good the surface after back filling of earth in trench including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
Labour charges for Removing Refixing Replacement of water meter for repairing, including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
Labour charges for crossing the water connection pipe under the road crust by manual mechanical means, including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
Labour charges for dismantling of cement concrete RCC Platform for making new connection DC RC at site including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
Labour charges of checking water connections at connection point from distribution system of different sizes half inch and above including digging at connection point for pipeline checking ferrule point, checking clamp on pipeline and aligning of ferrule with GI Pipe for proper flow of water to pipe line and making good the surface after back filling of earth in trench including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
Labour charges of checking disconnected water connections at connection point and nearby from distribution system of different sizes half inch and above including digging at connection point for pipeline checking ferrule point checking clamp on pipeline and alignment of ferrule with GI Pipe if any found at site and making good the surface after back filling of earth in trench including all T and P transportation lead and lift etc complete as per the directions of engineer in charge
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
spltermsandconditionsofwork.pdf
Additional Documents • 0.12 MB
td7.pdf
Tender Documents • 0.18 MB
BOQ_973630.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid