Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAdmitted-Finance | ₹2.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.7 Cr+₹9,885.69 (0.04%)Admitted-Finance | ₹2.7 Cr+₹9,885.69 (0.04%) | L2 | Admitted-Finance |
| 3 | L3₹2.8 Cr+₹9.2 L (3.42%)Admitted-Finance LADY LADY DISTY SUNAM SUB MINAR | SANGRUR | PUNJAB | 148001 | ₹2.8 Cr+₹9.2 L (3.42%) | L3 | Admitted-Finance |
| 4 | L4₹3.0 Cr+₹31.6 L (11.8%)Admitted-Finance | ₹3.0 Cr+₹31.6 L (11.8%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HARNAM DASS AND CO L4 | M/S AMARJIT SINGH L2 | RAGHU PAL SINGH L1 | Kewal Krishan Govt Contractor L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth , 1.5 m in width as well as 10 sqm onplan) including disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge All kinds of soil. | 16,286.4 | Cum | 120 ₹19,54,368 | 100 ₹16,28,640 | 49 ₹7,98,033.6 Lowest | 80 ₹13,02,912 |
| 2.00 | Filling avaliable excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.5m. | 4,120.32 | Cum | 90 ₹3,70,828.8 | 100 ₹4,12,032 | 49 ₹2,01,895.68 | 30 ₹1,23,609.6 Lowest |
| 3.00 | Handpacking of stones in wire crates (Gabion) excld. Cost of crates and stones, | 14,790 | Cum | 200 ₹29,58,000 Lowest | 200 ₹29,58,000 Lowest | 280 ₹41,41,200 | 270 ₹39,93,300 |
| 4.00 | Dry stone pitching excl. cost of stones ( hortizontal) | 417.6 | Cum | 380 ₹1,58,688 | 400 ₹1,67,040 | 299 ₹1,24,862.4 Lowest | 380 ₹1,58,688 |
| 5.00 | Grouting of stones pitching using M10 nominal size of aggs. 20mm @ 6.0 Cum/hundred sqm horizontal/slopes | 2,784 | Sqm | 300 ₹8,35,200 | 200 ₹5,56,800 Lowest | 260 ₹7,23,840 | 220 ₹6,12,480 |
| 6.00 | `Supply of nallah soling stones | 12,926.46 | Cum | 880 ₹1,13,75,284.8 | 300 ₹38,77,938 Lowest | 333 ₹43,04,511.18 | 390 ₹50,41,319.4 |
| 7.00 | Carriage of stones avg 25Km by MT | 12,926.46 | Cum | 10 ₹1,29,264.6 Lowest | 300 ₹38,77,938 | 380 ₹49,12,054.8 | 471 ₹60,88,362.66 |
| 8.00 | Carriage of sand avg lead 10km by M.T. | 77.95 | Cum | 10 ₹779.5 | 1 ₹77.95 Lowest | 10 ₹779.5 | 100 ₹7,795 |
| 9.00 | Carriage of Bajri avg lead 10km by M.T. | 155.9 | Cum | 10 ₹1,559 | 1 ₹155.9 Lowest | 10 ₹1,559 | 100 ₹15,590 |
| 10.00 | Add cost of Gabbion Knitted crates 6x1.5x1.5 (Gabion) | 580 | No | 8,000 ₹46,40,000 | 10,000 ₹58,00,000 | 7,000 ₹40,60,000 Lowest | 7,500 ₹43,50,000 |
Tender Value
₹3.6 Cr
Closing Date
17 Nov 2021, 4:00 pmClosed
Executive Engineer Flood Control Division
Samba
Construction of flood protection work on Downstream National Highway Bridge on Right Side of River Devak for protection of AIIMS site RD 660-1356M
2021_IFC_145552_1
e-NIT No. 24 of 10/2021
Open Tender
Civil Works
Item Rate
120 days
Samba
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
Executive Engineer Flood Control Division
Exempted
Superintending Engineer Hydraulic Circle
10 Dec 2021
29 Oct 2021
18 Nov 2021
29 Oct 2021
17 Nov 2021
29 Oct 2021
3 Nov 2021
Amount
Earthwork in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth , 1.5 m in width as well as 10 sqm onplan) including disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge All kinds of soil.
Filling avaliable excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.5m.
Handpacking of stones in wire crates (Gabion) excld. Cost of crates and stones,
Dry stone pitching excl. cost of stones ( hortizontal)
Grouting of stones pitching using M10 nominal size of aggs. 20mm @ 6.0 Cum/hundred sqm horizontal/slopes
`Supply of nallah soling stones
Carriage of stones avg 25Km by MT
Carriage of sand avg lead 10km by M.T.
Carriage of Bajri avg lead 10km by M.T.
Add cost of Gabbion Knitted crates 6x1.5x1.5 (Gabion)
Add cost of Gabbion knitted crates 6x1.0x1.0 (Gabion)
M/S AMARJIT SINGH
Kewal Krishan Govt Contractor
HARNAM DASS AND CO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_312448.xls
BOQ • 0.23 MB
SBD.pdf
Additional Documents • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .