| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-Finance 115 BARI CO OPERATIVE COLONY BOKARO JHARKHAND 827012 | BOKARO | JHARKHAND | 827012 | ₹1.2 Cr | L1 | Accepted-Finance Quoted Lowest |
| 2 | L2₹1.2 Cr+₹1.1 L (0.95%)Rejected-Finance | ₹1.2 Cr+₹1.1 L (0.95%) | L2 | Rejected-Finance Quoted Second Lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
10 Oct 2020, 4:00 pmClosed
EE RWD Likabali
O/o EE RWD Likabali
RCC Slab Culvert Pucca Side Drain Earthen Drain R B Wall Sub Grade preparation Shoulder GSB WBM III and PMC Road Furniture etc
2020_CEAR_100723_1
2020_CEAR_95171_1
Open Tender
Civil Works - Roads
Item Rate
365 days
Old Deka
Firm registration Tender fee EMD Bank solvency Balance sheet of last 5 year by CA Bank Guarantee with
credit facility EPF GST number Work experience Machineries with RC Purchased Invoice etc
10 documents required · 10 mandatory
₹8,000
ARRDA RWD Itanagar
₹2.5 L
Likabali, Lower Siang Arunachal Pradesh
3 Nov 2020
3 Oct 2020
12 Oct 2020
4 Oct 2020
10 Oct 2020
5 Oct 2020
5 Oct 2020 - 8 Oct 2020
7 Oct 2020
Amount
SUB-HEAD-EARTHEN SHOULDER Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
GSB Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For Grading I Material
WBM-III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
P.M.C Prime Coat (High porosity) Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.2-1.5 kg/sqm using mechanical means as per Technical Specification Clause 502.
Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per Technical Specification Clause 503.
20mm thick open graded primix carpet using bitumineous binder. Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. Case - I By Manual Means ii) Bitumen (S-65)
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 Case - I By Manual Means ii) Bitumen (S-65)
CROSS DRAINAGE (1.50 m 2 nos) Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Coursed Rubble msonary (first sort) In 1:3 cement mortar
Coursed rubble masonry (2nd sort)In cement mortar 1:3
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 (i)Sandy materials
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 R.C.C grade M 20 For nominal mix 1:2:4
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 R.C.C M 25
Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915
Trapezoidal Shaped Side Drain ( As per IRC SP-48-1998 Hill Road Manual ) Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 i) Nominal mix 1:3:6
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 III) Random rubble masonry i) In cement mortar (1:3)
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
Unlined Trapezoidal Shaped Side Drain Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. A) Manual Means Surface Drains in Soil
Surface Drains in Ordinary Rock
Road Furniture Providing and fixing of typical PMGSY Citizen information sign board as per MORD specifications and drawing of cast-in-situ RCC,(Size of RCC post 25cmx25cmx90cm below G.L. & 15cmx15cmx245cm above G.L.),(Size of board 2x 90cmx80cmx7.5cm, ) incl.earth work, finishing with 15mm pluster 1:4 and neat cement punning, applying priming coat, painting and lettering with appropiate colour with required shade of approved quality ready mix paint.
Safety Devices and Signs in Construction Zones Provision and fixing of traffic signs for limited period at suitable locations in construction zone comprising of warning zone, approach transition zone, working zone and terminal transition zone with a minimum distance of 2-3 m from the edge of the carriageway. The bottom edge of the lowest sign plate to be not less than 2 m above the road level, fixed on 600 mm x 600 mm x 6 mm angle iron post, founded and installed as per approved design and drawings, removed and disposed of after completion of construction work, all as per IRC:SP:55-2001.
Men at work
Road narrow
Un-even road
Slippery road
Diversion
Do not enter
Go Slow
Speed limit
Routine Maintenance
First Year
Second Year
Third Year
Fourth Year
Fifth Year
Add GST @ 12%
M/s Ngarsee Torio Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .