| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.0 CrAccepted-AOC 01 ENTERPRISES | ₹1.0 Cr | L-1 | Accepted-AOC Being lowest and reasonable. |
| 2 | L-2₹1.0 CrRejected-Finance 18969 A 1 SHRI GURU TEG BAHADUR NAGAR BIBIWALA ROAD STREET NO 15 BATHINDA 151001 | BATHINDA | BATHINDA | PUNJAB | 151001 | ₹1.0 Cr | L-2 | Rejected-Finance Not being lowest bidder. |
| 3 | L-3₹1.1 CrRejected-Finance PLOT NO D 25 INDUSTRIAL GROWTH CENTRE MANSA ROAD BATHINDA PB 151001 | BATHINDA | BATHINDA | PUNJAB | 151001 | ₹1.1 Cr | L-3 | Rejected-Finance Not being lowest bidder. |
| 4 | L-4₹1.1 CrRejected-Finance H NO 13149 STREET NO 3 SHIV COLONY BATHINDA PB 151001 | BATHINDA | BATHINDA | PUNJAB | 151001 | ₹1.1 Cr | L-4 | Rejected-Finance Not being lowest bidder. |
| 5 | L-5₹1.1 CrRejected-Finance 64 SHAHEED UDHAM SINGH MARKET NEAR OLD BUS STAND BATHINDA 151001 PB | BATHINDA | BATHINDA | PUNJAB | 151001 | ₹1.1 Cr | L-5 | Rejected-Finance Not being lowest bidder. |
| Sl No | Description | Qty | Unit | M/s MITTAL CONSTRUCTIONS L6 | M/s Verma Construction Company L4 | M/s PANKAJ KUMAR L5 | Singla Enterprises L1 | SHARDA ENTERPRIES L2 | M/S VERMA BUILDERS & DEVELOPERS L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface dressing not exceeding 15 cm deep and getting out in soft / loose soil complete all as specified and as directed by Engineer-in-Charge. | 645 | Sqm | 20 ₹12,900 | 18 ₹11,610 | 30 ₹19,350 | 50 ₹32,250 | 15 ₹9,675 | 5 ₹3,225 |
| 2.00 | Surface excavation n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out and getting out in soft / loose soil complete all as specified & directed. | 650 | Sqm | 30 ₹19,500 | 27 ₹17,550 | 40 ₹26,000 | 50 ₹32,500 | 20 ₹13,000 | 50 ₹32,500 |
| 3.00 | Removing excavated material exc 1.50 Km n exc. 5 Km and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and as directed. | 97.5 | Cum | 200 ₹19,500 | 90 ₹8,775 | 60 ₹5,850 | 100 ₹9,750 | 40 ₹3,900 | 100 ₹9,750 |
| 4.00 | Excavation in trenches not exceeding 1.5 meter wide and not exceeding 1.5 meter depth for foundation etc or for shafts , wells, cesspits, manholes , septic tank, for laying of cables , laying of pipes not exceeding 10 Sqm on plan and not exc 1.5 meter depth and getting out in soft/loose soil etc complete all as specified and as directed by Engineer-in- charge. | 702 | Cum | 120 ₹84,240 | 108 ₹75,816 | 125 ₹87,750 | 150 ₹1.1 L | 80 ₹56,160 | 150 ₹1.1 L |
| 5.00 | Material and labour for Cement Concrete 1:4:8 , Type D-2 using 40 mm graded stone aggregate as in foundation filling and mass concrete complete all as specified and as directed by Engineer-in-charge. | 22.2 | Cum | 3,200 ₹71,040 | 3,600 ₹79,920 | 3,600 ₹79,920 | 2,400 ₹53,280 | 2,000 ₹44,400 | 3,000 ₹66,600 |
| 6.00 | Material and labour for RCC M-25 (Design mix) using 20 mm graded stone aggregates as in foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and as directed by Engineer-in-charge. NOTE : Reinforcement and form work shall be measured and paid for separately under appropriate item of this schedule. | 130 | Cum | 8,000 ₹10.4 L | 6,750 ₹8.8 L | 7,000 ₹9.1 L | 6,500 ₹8.4 L | 7,000 ₹9.1 L | 6,000 ₹7.8 L |
| 7.00 | Material and labour for RCC M-25 (Design mix) using 20 mm graded stone aggregates as in columns, pillars, piers, posts and struts complete all as specified and as directed by Engineer-in-charge. NOTE : Reinforcement and form work shall be measured and paid for separately under appropriate item of this schedule. | 27 | Cum | 8,000 ₹2.2 L | 7,200 ₹1.9 L | 7,000 ₹1.9 L | 7,000 ₹1.9 L | 7,000 ₹1.9 L | 6,000 ₹1.6 L |
| 8.00 | Material and labour for RCC M-25 (Design mix) using 20 mm graded stone aggregates as in beams, cantilevers, bressummers, lintels over 1.5 m span and the like etc complete all as specified and as directed by Engineer-in-charge. NOTE : Reinforcement and form work shall be measured and paid for separately under appropriate item of this schedule. | 27 | Cum | 8,000 ₹2.2 L | 7,560 ₹2.0 L | 7,500 ₹2.0 L | 7,000 ₹1.9 L | 7,000 ₹1.9 L | 6,000 ₹1.6 L |
| 9.00 | Material and labour for RCC M-25 (Design mix) using 20mm graded stone aggregate as in slabs supported on walls, beams and columns in floors,roofs, landings, balconies,canopies, deck slabs and in shelves and the like complete all as specified and as directed by Engineer-in-charge.
NOTE : Reinforcement and form work shall be measured and paid for separately under appropriate item of this schedule. | 51.6 | Cum | 8,000 ₹4.1 L | 8,100 ₹4.2 L | 7,000 ₹3.6 L | 6,000 ₹3.1 L | 7,000 ₹3.6 L | 6,000 ₹3.1 L |
| 10.00 | Material and labour for RCC M-25 (Design mix) using 20mm graded stone aggregate as in Chajjas complete all as specified and as directed by Engineer-in-charge.
NOTE : Reinforcement and form work shall be measured and paid for separately under appropriate item of this schedule. | 6 | Cum | 8,000 ₹48,000 | 7,200 ₹43,200 | 8,000 ₹48,000 | 7,500 ₹45,000 | 7,000 ₹42,000 | 6,000 ₹36,000 |
Updated dates
Tender Value
₹1.2 Cr
EMD Value
₹1.9 L
Closing Date
15 Nov 2025, 6:00 pmClosed
CWE Bathinda
HQ CWE Bathinda Bathinda Mil Stn
PROVN OF CONSTRUCTION OF THREE GUARD ROOMS ALONG WITH TOILETS CUM BATHROOMS COVERED UNDER VARIOUS LBW WORKS UNDER GE ( SOUTH) BATHINDA AT BATHINDA MIL. STN
2025_MES_734633_1
CWE BTD/TOKEN-67/2024-25
Open Tender
Civil Works
300 days
Bathinda Mil Stn
As per NIT
7 documents required · 7 mandatory
₹1,000
GE (S) Bathinda
₹1.9 L
HQ CWE Bathinda
23 May 2026
10 Oct 2025
17 Nov 2025
10 Oct 2025
15 Nov 2025
1 Nov 2025
21 Oct 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.43 MB
8167_TenderDocu.pdf
Tender Documents • 2.23 MB
BOQ_822617.xls
BOQ • 0.41 MB
8167Drgs.pdf
Additional Documents • 20.18 MB
8167NIT.pdf
Additional Documents • 4.41 MB
Download all tender documents and submit your bid