| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 CrAccepted-AOC RH1 2 PLOT NO 5 SECT 3 SHREE NITHYANAND CHS NEW PANVEL E NAVI MUMBAI 410206 MAHARASHTRA INDIA | NAVI MUMBAI | RAIGAD | MAHARASHTRA | 410206 | ₹8.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹9.6 Cr+₹1.5 Cr (18.4%)Rejected-AOC | ₹9.6 Cr+₹1.5 Cr (18.4%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical NON MEETING OF FINANCIAL BEC TURN OVER IS LESS THAN BEC REQUIREMENT |
| Sl No | Description | Qty | Unit | ENERINFRA PRIVATE LIMITED L2 | MAS CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00SECTION-A (MAIN LINE WORKS) | |||||
| 2.00PIPELINE LAYING / INSTALLATION | |||||
| 3.00Laying/ installation of coated line pipe, associated fittings and accessories, etc. as per specifications, drawings, other provisions of Contract and instructions of Engineer-in-Charge of the sizes mentioned herein, including but not limited to carrying out the following : | |||||
| 4.00"Receiving and taking-over", handling, loading (except bare/coated line pipe from Owner's designated dumpyard for this project), transportation and unloading of Owner supplied externally corrosion coated, bare line pipes and other Owner supplied materials from Owner designated place(s) of issue/ dump site(s) to Contractor's own stock-yard(s)/ workshop(s)/ work-site(s) including stringing of the pipeline along NH corridor/ Right-of-Use (ROU)/ Right of way (ROW); Arrangement of all additional land required for Contractor's storage, fabrication, access for construction (other than Owner provided NH Corridor/ROU/ROW); supply of all materials (except Owner supplied materials), consumables, equipment, labour, etc. and other incidental works;carrying out all temporary, ancillary, auxiliary works required to make the pipeline ready for pre-commissioning as per drawings, specifications, scope of work indicated in SCC and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works : | |||||
| 5.00Staking and installation of temporary construction markers, clearing, grubbing & grading (as required) of Corridor/Right of Use/ Right of Way; | |||||
| 6.00Shifting of all obstruction within the Corridor/ pipeline route alignment viz. electrical line / pole, telephone line (poles), foreign pipeline; coordination with concerned authorities. | |||||
| 7.00Trenching to all depths and to a width to accommodate the pipeline and/or optical fiber cable/cable duct/ conduit during lowering & backfilling as specified in scope document and as per the relevant standards, specifications, etc. by excavation in all types of soils (including soft/hard rock), including chiseling or otherwise cutting etc.; providing depth of padding in trench bed & above and around the pipeline, HDPE duct and OFC as required with sand / graded earth approved by Engineer-in Charge; | |||||
| 8.00Survey of the detours, if required at the time of construction including marking the same in topographical sheet, preparation of AFC drawings showing survey detail and submitting same to Owner to review. | |||||
| 9.00Carrying out repairs of pipe defects/ replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects/ damages occurring during transportation/ handling after taking over from Owner by Contractor including management of their own dump site, if required. | |||||
| 10.00Thorough internal cleaning of all pipes by suitable methods to remove debris, shots, grits etc. to the satisfaction of Engineer-in- Charge; | |||||
Tender Value
Refer Docs
EMD Value
₹15 L
Closing Date
22 Dec 2025, 2:00 pmClosed
BISHAR BIN ALI
BIshar Bin ALi GAIL India Ltd Bangalore
RE ROUTING AND ASSOCIATED WORK FOR 24 INCH X 1.4 KM SINGASANDRA KRISHNAGIRI PIPELINE AND REPLACEMENT OF PIPE SPOOL AT CH 14.2 KM FOR M/S. GAIL (INDIA) LIMITED
2025_GAIL_257491_1
GAIL/BLR25-66/CNP/PL/20134414
Open Tender
Pipe Laying Works
Works
180 days
BANGALORE
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹15 L
Yes
ONLINE THORUGH TEAMS MEETING
29 Apr 2026
4 Dec 2025
23 Dec 2025
5 Dec 2025
22 Dec 2025
11 Dec 2025
11 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SECTION-A (MAIN LINE WORKS) | - | - | - | - |
| 2 | PIPELINE LAYING / INSTALLATION | - | - | - | - |
| 3 | Laying/ installation of coated line pipe, associated fittings and accessories, etc. as per specifications, drawings, other provisions of Contract and instructions of Engineer-in-Charge of the sizes mentioned herein, including but not limited to carrying out the following : | - | - | - | - |
| 4 | "Receiving and taking-over", handling, loading (except bare/coated line pipe from Owner's designated dumpyard for this project), transportation and unloading of Owner supplied externally corrosion coated, bare line pipes and other Owner supplied materials from Owner designated place(s) of issue/ dump site(s) to Contractor's own stock-yard(s)/ workshop(s)/ work-site(s) including stringing of the pipeline along NH corridor/ Right-of-Use (ROU)/ Right of way (ROW); Arrangement of all additional land required for Contractor's storage, fabrication, access for construction (other than Owner provided NH Corridor/ROU/ROW); supply of all materials (except Owner supplied materials), consumables, equipment, labour, etc. and other incidental works;carrying out all temporary, ancillary, auxiliary works required to make the pipeline ready for pre-commissioning as per drawings, specifications, scope of work indicated in SCC and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works : | - | - | - | - |
| 5 | Staking and installation of temporary construction markers, clearing, grubbing & grading (as required) of Corridor/Right of Use/ Right of Way; | - | - | - | - |
| 6 | Shifting of all obstruction within the Corridor/ pipeline route alignment viz. electrical line / pole, telephone line (poles), foreign pipeline; coordination with concerned authorities. | - | - | - | - |
| 7 | Trenching to all depths and to a width to accommodate the pipeline and/or optical fiber cable/cable duct/ conduit during lowering & backfilling as specified in scope document and as per the relevant standards, specifications, etc. by excavation in all types of soils (including soft/hard rock), including chiseling or otherwise cutting etc.; providing depth of padding in trench bed & above and around the pipeline, HDPE duct and OFC as required with sand / graded earth approved by Engineer-in Charge; | - | - | - | - |
| 8 | Survey of the detours, if required at the time of construction including marking the same in topographical sheet, preparation of AFC drawings showing survey detail and submitting same to Owner to review. | - | - | - | - |
| 9 | Carrying out repairs of pipe defects/ replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects/ damages occurring during transportation/ handling after taking over from Owner by Contractor including management of their own dump site, if required. | - | - | - | - |
| 10 | Thorough internal cleaning of all pipes by suitable methods to remove debris, shots, grits etc. to the satisfaction of Engineer-in- Charge; | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.35 MB
Tender.pdf
Tender Documents • 2.78 MB
2.pdf
Other Document • 1.47 MB
CBA.xls
Other Document • 0.06 MB
IP.pdf
Other Document • 1.15 MB
BOQ_297646.xls
BOQ • 0.39 MB
7.pdf
Additional Documents • 31.70 MB
6.pdf
Additional Documents • 6.19 MB
1.pdf
Additional Documents • 1.27 MB
5.pdf
Additional Documents • 0.14 MB
4.pdf
Additional Documents • 0.42 MB
3.pdf
Additional Documents • 5.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .