Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.6 LAdmitted-Finance | -0.04% | ₹16.6 L | L1 | Admitted-Finance |
| 2 | L2₹16.6 LAdmitted-Finance | -0.01% | ₹16.6 L | L2 | Admitted-Finance |
Tender Value
₹16.6 L
EMD Value
₹33,240
Closing Date
11 May 2026, 12:00 pmClosed
EE RED Barabanki Vikas Bhawan Barabanki
EE RED Barabanki Vikas Bhawan Barabanki
Under District Barabanki, Construction of Advocate Chamber Shed in Haidergarh Tehsil Premises, Lot No 30
2026_REDUP_1143063_30
08/EE RED Barabanki/2026-27 Dt 01/04/2026
Open Tender
Civil Works
90 days
Barabanki
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹33,240
EE RED Barabanki Vikas Bhawan Barabanki
29 May 2026
28 Apr 2026
11 May 2026
28 Apr 2026
11 May 2026
28 Apr 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil, DSR 2023,
2.6.1 | 1 | Cum. | 127.65 | ₹127.52 | |
Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift., DSR 2023, 2.25a | - | Cum. | 503.76 | - | |
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete., DSR 2023,
2.27 | - | Cum. | 1,527.29 | - | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources),S.O.R. NO. 4.1.8 | 1 | CUM | 4,898.85 | ₹4,893.95 | |
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand), DSR2023, 6.1.2 | 1 | CUM | 5,129.16 | ₹5,124.03 | |
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources), DSR 2023, 5.2.2 | 1 | Cum. | 7,804.9 | ₹7,797.1 | |
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more., DSR 2023,
5.22.6 | - | Qtl. | 7,756.03 | - | |
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete, DSR 2023,
5.9.1 | - | SQM | 282.01 | - | |
Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers, DSR 2023,
5.9.5 | - | SQM | 529.58 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.94 MB
Tendernotice_2.pdf
PDF • 3.48 MB
BOQ_2135146.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid