| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.3 LAdmitted-Fee/PreQual/Technical/Finance | -55.26% | ₹14.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹14.4 LAdmitted-Fee/PreQual/Technical/Finance | -55.08% | ₹14.4 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹14.5 LAdmitted-Fee/PreQual/Technical/Finance | -54.71% | ₹14.5 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹17.6 LAdmitted-Fee/PreQual/Technical/Finance | -45.00% | ₹17.6 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹21.1 LAdmitted-Fee/PreQual/Technical/Finance | -34.11% | ₹21.1 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹32.0 L
EMD Value
₹64,041
Closing Date
24 Aug 2026, 6:00 pmClosed
EE WR Division Sirohi
EE WR Division Sirohi
Sub surface Barrier at River Kameri near Village Padeev Teh and Distt Sirohi Under MJSA 2.2
2026_WRDAS_590776_1
NIT 04/2026-27
Open Tender
Civil Works
Percentage
90 days
Village Padeev Teh and Distt Sirohi
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
EE WR DIVISION
₹64,041
Yes
25 Aug 2026
20 Aug 2026
25 Aug 2026
20 Aug 2026
24 Aug 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil work | |||||
| 1.01 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Julicflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.Ordinary | 4,916.1 | Sqm | 1.45 | ₹7,128.35 |
| 1.02 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil lift upto 1.5 m | 5,663.64 | Cum | 92 | ₹5,21,054.88 |
| 1.03 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Soft/Loose soil Add extra over ietm 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and unloading wherever required lift upto 1.5 to 3.0 m | 4,345.48 | Cum | 100.5 | ₹4,36,720.74 |
| 1.04 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil lift Add extra over ietm 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and unloading wherever required from 3.0 m to 4.5 m | 3,028.67 | Cum | 112 | ₹3,39,211.04 |
| 1.05 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil Add extra over ietm 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and unloading wherever required lift from 4.5 m to 5.5 m | 1,711.86 | Cum | 120.5 | ₹2,06,279.13 |
| 1.06 | Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required. | 14,748.3 | Cum | 91 | ₹13,42,095.3 |
| 1.07 | Supplying, laying & spreading of LDPE film of 250 micron on bed and sides including jointing etc. complete as per specifications including cost of LDPE film, overlapping, adhesive tape etc. with transportation charges upto work site complete. | 5,716.72 | Sqm | 59 | ₹3,37,286.48 |
| 1.08 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; 40 mm agg. | 0.34 | Cum | 4,770 | ₹1,621.8 |
| 1.09 | Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. In cement Sand Mortar 1:6 | 1.46 | Cum | 3,910 | ₹5,708.6 |
stage.html
html • 0.03 MB
finance_1049376.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.04 MB
BOQ_1049376.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].