Interception & Diversion ( I&D) of drains and sewage Treatment Plant (STP) scheme in Arrah town, Bihar State, including Operation & Maintenance period of 15 years through Hybrid Annuity Based PPP Mode under Namami Gange Programme".
121541
Buidco/Yo-3272/25-119
Open Tender
GENERAL
Gaya
• Name
• Company Name
• Address
• Email ID and Mobile No.
• PAN No. and GST No.
GENERAL
ITEM RATE
L1
1
13 documents required · 13 mandatory
₹2.8 Cr
CGM, Buidco office- West Boring Canal Road, Rajapur Pul, Patna- 800001.
31 Aug 2026
29 Dec 2025
1 Sept 2026
29 Dec 2025
31 Aug 2026
29 Dec 2025
8 Jan 2026
A - BIND POKHAR BID PROJECT COST
A.1 - BIND POKHAR - 47 MLD STP at Bind Pokhar
A.1.1 - Bid Project Cost for 47 MLD STP at Bind Pokhar (Capex Part)
A.1.2 - O&M charges (Non-Power) 47 MLD STP at Bind Pokhar for first month after COD [The bidder need to ensure that quoted value is not less than 0.16% of A.1.1]
A.1.3 - Guaranteed Energy Consumption (GEC) for 47 MLD STP at Bind Pokhar for first month after COD (Value should be entered in all cell from A.1.3.1 to A.1.3.6 (The permissible value of maximum to minimum GEC quoted in cell A.1.3.1 to A.1.3.6 should be less than or equal to 1.5 ) [in case of power sourcing from other power plant of third party, adjusted GEC to be quoted as per RFP clause 20.1(q)(iii)]
A.1.3.1 - Flow ≤ 30 MLD and BOD < 100 mg/L (5% Weightage)
A.1.3.2 - Flow <30 MLD and BOD between 100 mg/l and 200 mg/l (40% Weightage)
A.1.3.3 - Flow <30 MLD and BOD >200 mg/l (5% Weightage)
A.1.3.4 - Flow >30 MLD and BOD <100 mg/l (5% Weightage)
A.1.3.5 - Flow >30 MLD and BOD between 100 mg/l and 200 mg/l (40% Weightage)
A.1.3.6 - Flow >30 MLD and BOD > 200 mg/L (5% Weightage)
A.1.3.7 - STP Weighted Average GEC
A.1.3.8 - Power Charges for 47 MLD STP at Bind Pokhar (= 47 MLD X Units Consumed/MLD X 5475 X 9.08 X 1.25) (Not to be filled by the Bidder)
A.1.4 - Land requirement at STP Site (sqm) - 47 MLD STP at Bind Pokhar (Rate is Rs 6178 per sq.m.) (Bidder is required to quote the land requirement under column 5 of this row subject to maximum available land i.e.20,000 sqm)
A.2 - BIND POKHAR - 47 MLD STP at Bind Pokhar Associated Infrastructure
A.2.2 - O&M charges (Non-Power) for 47 MLD STP at Bind Pokhar Associated Infrastructure for first month after COD [The bidder need to ensure that quoted value is not less than 0.16% of A.2.1 ]
A.2.3 - Associated Infra Guaranteed Energy Consumption for 47 MLD MPS and 3.5 MLD SPS-1, 7.5 MLD SPS -3, 16 MLD SPS-4 for first month after COD (GEC Cost = (32 MLD MPS + 3.5 MLD SPS +7.5 MLD SPS +16 MLD SPS) x GEC quoted/ MLD x 5475 x9.08 x 1.25)) [in case of power sourcing from other power plant of third party, adjusted GEC to be quoted as per RFP clause 20.1(q)(iii)]
A.3 - Gross & Captive Power Generation at BIND POKHAR Facilities - For information Purpose
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
RFP Arrah.pdf
NIT • 1.53 MB
NIT 119.pdf
NIT • 0.44 MB
Arrah Concession Agreement.pdf
NIT • 2.31 MB
Arrah Schedule 1 Scope of work.pdf
NIT • 1.00 MB
Arrah Schedule 2 Substitution Agreement.pdf
NIT • 0.61 MB
Arrah Schedule 3 Escrow Agreement.pdf
NIT • 0.73 MB
Arrah Schedule 4 Mobilization Advance Guarantee.pdf
NIT • 0.53 MB
Arrah Schedule 5 Discharge Point.pdf
NIT • 3.57 MB
Arrah Schedule 6 Project Engineer.pdf
NIT • 0.34 MB
Arrah Schedule 7 Liquidated Damages.pdf
NIT • 0.35 MB
Arrah Schedule 8 Applicable Permits.pdf
NIT • 0.22 MB
Arrah Schedule 9 EHS.pdf
NIT • 1.00 MB
Arrah Schedule 10 KPI.pdf
NIT • 0.47 MB
Arrah Schedule 11 Project Information Momerandum.pdf
NIT • 1.65 MB
Arrah Schedule 12 Technical Requirement.pdf
NIT • 8.57 MB
Arrah Schedule 13 Termination Compensation.pdf
NIT • 0.25 MB
Arrah Schedule 14 Site Layout.pdf
NIT • 0.36 MB
Arrah Schedule 15 DRAWINGS.pdf
NIT • 2.63 MB
Pre Bid Query Reply.pdf
NIT • 14.58 MB
Addendum 1.pdf
NIT • 1.61 MB
Revised Schedule 11.pdf
NIT • 3.53 MB
Revised_BOQ.xls
NIT • 0.28 MB
C11 Corrigendum 9 Ara STP.pdf
Corrigendum • 0.31 MB
C10 Addendum 1.pdf
Corrigendum • 1.61 MB
C9 Corrigendum 08.pdf
Corrigendum • 0.03 MB
C8 Corrigendum 07.pdf
Corrigendum • 0.27 MB
C7 Corrigendum 06 arah.pdf
Corrigendum • 0.33 MB
C6 Corrigendum 05 for Arrah I&D.pdf
Corrigendum • 0.31 MB
C5 Corrigendum 04.pdf
Corrigendum • 0.33 MB
C4 Arrah I&D STP.pdf
Corrigendum • 0.64 MB
C3 Corrigendum 02.pdf
Corrigendum • 0.31 MB
C2 Corrigendum 01 Arrah I & D.pdf
Corrigendum • 0.30 MB
C1 NIT 119.pdf
Corrigendum • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .