Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
7 Feb 2020, 2:00 pmClosed
EXECUTIVE ENGINEER
33/11 KV SUB STATION ST. LUCKS, MEERUT
RUNNING CONTRACT FOR CONSTRUCTION OF 11 KV and LT LINE UNDER DEPOSIT SCHEME WORKS IN THE AREA OF SDO XIII MES MEERUT
2020_PVVNL_429339_1
48/EUDD-VI/W/2019-20
Open Tender
Electrical Works
Lump-sum
90 days
SDO XIII MES MEERUT
PLEASE REFER TENDER DOCUMENT PART-1ST
2 documents required · 2 mandatory
₹590
EE.EUDD-IV, MEERUT
₹2,000
26 Feb 2020
31 Jan 2020
7 Feb 2020
1 Feb 2020
7 Feb 2020
1 Feb 2020
Amount
CONTRACT FOR CONSTRUCTION OF 11 KV & LT LINE UNDER DEPOSIT SCHEME WORKS IN THE AREA OF SDO.EUDSD-XIII, MES, MEERUT UNDER EE. EUDD-IV. MEERUT
Cartage of following material from Store Centre Meerut to JE’s Store including loading & Unloading at both ends. PCC Pole (8.5 Meter long)/ ST Pole (11 Meter long)
Cartage of line material from Central Store to JE’s Store, such as 11 KV Cross Arms, 11 KV Pin with insulator, 11 KV Disc. Stay Road Complete, Stay Wire, ACSR Weasel Conductor, GI Wire, MS Angle & MS Channel etc.
Cartage of Transformer 10 to 100 KVA Capacity from Central Store complete related material required for installation of Transformer, including loading & Unloading at both ends.
Cartage of following material from JE’s Store to site of work, including loading & Unloading at both ends. PCC Pole (8.5 Meter long)/ST Pole (11 Meter long)
Cartage of line material from JE’s Store to Site of work, such as 11 KV Cross Arms, 11 KV Pin with insulator, 11 KV Disc. Stay Road Complete, Stay Wire, ACSR Weasel Conductor, GI Wire, MS Angle & MS Channel. etc.
Erection of PCC Pole (8.5 Meter long) /STP Pole (11 Meter long)after digging of pit of required size in all type of Soil including back filling of the pole with proper ramming after completion of work.
Erection of Double Pole on PCC/STP Pole after digging of pit of required size in all type of Soil for each pole, including back filling of the pole with proper ramming after completion of work.
Fabrication and fixing of MS Angle and MS Channel, fixing of all 11 KV Accessories & Base Channel.
Mounting of Transformer 10 KVA To 100 KVA with proper jumpering of HT side and fixing of cable on LT side of T/Fs.
Erection of Stay Rod complete after digging of pit of required size and grouting the same in block of size 0.60 x0.60x 0.30 Mtr. and nuzzling at the both ends and filling the pit with excavated Earth soil with proper ramming.
Laying, Lifting, Stringing of proper sagging of ACSR Weasel Conductor for 3 Phase 3 wire 11 KV Line including binding & Jumpering complete.
Fabrication & Fixing of Guarding Angle.
Guarding of line with GI Wire having 2 No. Horizontal wire & 3 Mtr. distance of laces of ten SWG, GI Wire after fabrication of guard cross arms of & fixing the same in support.
Laying, Lifting & Sagging of LT AB Conductor of size 3x120, 3x95 & 3x50 mm.
Fixing of LT Distribution Box on support and making the proper connection.
Earthing of each 11 KV Line Pole & T/Fs properly after drive of electrodes of size 20mmx250mm and connection the earthing point with GI Wire.
Providing & Fixing of Stay Clamps.
Providing & Fixing of LT Clamps off size.
Providing & Fixing of LT Insulator Clamps.
Providing & Fixing of Stay Insulator.
Providing & Fixing of Bolts & Nuts.
M/s Mahi Contractor
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .