Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-Finance | ₹11.6 L | L1 | Accepted-Finance BEING L1 |
| 2 | L2₹11.8 L+₹17,642.51 (1.52%)Rejected-Finance | ₹11.8 L+₹17,642.51 (1.52%) | L2 | Rejected-Finance BEING L2 |
| 3 | L3₹12.1 L+₹48,810.95 (4.21%)Rejected-Finance 4A KALICHARAN GHOSH ROAD KOL 50 | KOLKATA | WEST BENGAL | ₹12.1 L+₹48,810.95 (4.21%) | L3 | Rejected-Finance BEING L3 |
Tender Value
₹11.8 L
EMD Value
₹23,523
Closing Date
29 May 2026, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer Metropolitan Drainage Mechanical Division Jalasampad Bhawan (4th floor) Salt Lake City, Kolkata-700091
The strengthening of Base plate for supporting motor stool for preventing motor vibration of 9 nos of pump including painting at fore bay bridge at 3rd additional Chowbhaga pumping station and Chowbhaga pumping station OLD within KMC area PS Chowbha
2026_IWD_1024293_1
WBIW/EE/MDMD/e-NIT-02/2026-27
Open Tender
MECHANICAL
Percentage
Chowbhaga
Please refer Tender documents.
5 documents required · 5 mandatory
₹23,523
10 Jun 2026
15 May 2026
29 May 2026
15 May 2026
29 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Strengthning of Motor stool Base plate & frame Supply, installation, testing and commisioning of following items for hoisting system and gear box as mentioned below as per direction including cost of Materials, Machinaries , Manpower, Cutting, Machining, Aligning, Anchoring, Welding, Finishing, Consumables, Carriage and all overheads with all leads and lifts complete as per specification (without painting) | |||||
| 1.01 | i)Base frame (MS) | 4,849 | kg | 179.96 | ₹8,72,626.04 |
| 2Maintenance and overhauling of V.T. / inclined pumps as per manufacturers instruction manual with all tools, tackles etc. This job includes labour charges, consumables like O - ring, sundry cleaning material etc. This job includes dismantling of all sub assemblies such as gear box, cooling pipes, bearing housing, stuffing box, discharge tee, muff couplings, shafts, column pipes, bowl assembly, bell mouth, strainer, line shaft enclosing tube etc. Reconditioning of all parts, inspection of all parts & replace these parts as per instructions (spares cost excluded) straighthening of shafts & refitting of all parts & sub assemblies with proper alignment including motor removing & refixing, test & trial for 24 hrs etc complete. | |||||
| 2.01 | For 50 cusec pump | 1 | per job | 81,875.47 | ₹81,875.47 |
| 3 | Surface cleaning of metal surfaces by chemical cleaners and then by hand with emary paper, wire brush and power tool cleaners and removing dust and preparation of surface including cost of all materials, labour, machinery, scaffolding, etc., complete with initial lead for sand upto 1 km and all lifts. | 798.25 | sqm | 76.28 | ₹60,890.51 |
| 4 | Painting of Gates of Distributory/Branch/Minor canal/ Pump Coloum pipe/Pump Discharge Pipe & other similar components prepared surfaces with one coats of zinc phosphate primer (airless spray preferred) 50 microns/coat and one coat coaltar epoxy, 150 microns/coat including cost of all materials, labour, scaffolding etc., complete with all leads and all lifts. | 798.25 | sqm | 201.41 | ₹1,60,775.53 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
2911i.pdf
Tender Documents • 0.93 MB
BOQ_2517320.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .