| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹79,051.76Admitted-Finance | -41.79% | ₹79,051.76 | L1 | Admitted-Finance |
| 2 | L2₹86,914.84+₹7,863.08 (9.95%)Admitted-Finance | -36.00% | ₹86,914.84+₹7,863.08 (9.95%) | L2 | Admitted-Finance |
| 3 | L3₹92,442.08+₹13,390.32 (16.9%)Admitted-Finance | -31.93% | ₹92,442.08+₹13,390.32 (16.9%) | L3 | Admitted-Finance |
| 4 | L4₹1.1 L+₹30,949.83 (39.2%)Admitted-Finance | -19.00% | ₹1.1 L+₹30,949.83 (39.2%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-BIDDER MUST WRITE TENDER ID NAME OF WORK WITH DULY PEN ON CDR |
Tender Value
₹1.4 L
EMD Value
₹2,700
Closing Date
24 Aug 2026, 4:30 pmClosed
Er. fayaz Ahmed
Executive engineer REW Ramban
AS PER NIT
2026_RDPR_319890_45
e-Nit15.2of REW Ramban( BANHIAL)
Open Tender
Civil Works
Percentage
BANIHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive engineer REW Ramban
₹2,700
12 Sept 2026
8 Aug 2026
25 Aug 2026
8 Aug 2026
24 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 1 | cum | 592.9 | ₹592.31 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | - | cum | 5,733.6 | - |
| 3 | Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete. | 1 | Kg | 127.3 | ₹127.17 |
| 4 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge. 16.25.1 Made of G.I. wire of dia 4 mm | - | sqm | 809.9 | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:foundations ,footings bases of column | - | sqm | 286.35 | - |
| 6 | Carriage of cement from source to site by mechanical transport or animal transport or by head load | - | Ton | 445.72 | - |
| 7 | Carriage of Sand from source to site by mechanical transport or animal transport or by head load | 1 | cum | 1,449.21 | ₹1,447.76 |
| 8 | Carriage of Stone Aggregates below 20mm from source to site by mechanical transport or animal transport or by head load | - | cum | 1,276.84 | - |
| 9 | CIB( citizen information board) size 1'6''x2'6'' made of Granite stone ( complete job) | - | nos | 3,500 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.20 MB
BOQ_1061938.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .