| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.6 LAccepted-AOC NO 9 CHAIRMAN JANAGARAJ STREET SRI RAGAVENDHRA GARDEN ALAMELUPURAM VILLUPURAM 605 602 | VILLUPURAM | VILLUPURAM | TAMIL NADU | 605602 | L1 | Accepted-AOC L1 | |
| 2 | L2₹32.9 L+₹2.2 L (7.28%)Rejected-AOC 11 B EAST VEERAPANDIYAN STREET VIRUDHACHALAM 606001 | VIRUDHACHALAM | CUDDALORE | TAMIL NADU | 606001 | L2 | Rejected-AOC L2 | |
| 3 | L3₹36.8 L+₹6.2 L (20.2%)Rejected-AOC 7 B CHOKALINGAM STREET SHANMUGAPURAM COLONY VILLUPURAM 605 602 | VILLUPURAM | VILLUPURAM | TAMIL NADU | 605602 | L3 | Rejected-AOC L3 | |
| 4 | L4₹37.3 L+₹6.7 L (21.8%)Rejected-AOC NO 137 TRICHY MAIN ROAD PIDAGAM POST VILLUPURAM TK 605 401 | VILLUPURAM | VILLUPURAM | TAMIL NADU | 605401 | L4 | Rejected-AOC L4 | |
| 5 | L5₹42.2 L+₹11.6 L (37.8%)Rejected-AOC D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹49,800
Closing Date
9 Jan 2025, 2:00 pmClosed
AEE GL GCC TRICHY
SUPERINTENDING ENGINEER GCC TRICHY
Replacement of the damaged 230 KV A Bus RCC structure by Lattice structure at Echangadu 230 110 KV Sub station Civil portion
2024_EB_514077_1
GCC 051 GL 015 2024 2025
Open Tender
Civil Works
Works
90 days
Eachangadu
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹49,800
Yes
1 Mar 2025
26 Dec 2024
10 Jan 2025
26 Dec 2024
9 Jan 2025
26 Dec 2024
Amount
Labour portion ( SCHEDULE- A)
Earthwork excavation in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders and hard gravelly soil for foundation
Supplying and filling of M. sand in foundation with well water and consolidation as per specn.including cost of all materials labour, lead, lift,curing, etc., complete.
Providing shoring and shuttering in foundation using wooden planks and scantling including all cost of materials, labour, lead, lift etc complete.
PCC 1:3:6, using 40mm HBG metal foundation without form work including cost of cement, all materials,water charges, labour, lead, lift, etc. complete.
RCC 1:1.5:3, mix, with 12 to 20mm HBG m/c metal with out form work including cost of all materials, cement, all labour, lead, lift, etc. complete.
RCC 1:1.5:3 mix using 20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Column concrete
Providing MS/RTS reinforcement rod for RCC works including cutting, bending, tying and fixing in position as per drawing and specification including cost of all materials, all labour charges, lead, lift, etc. complete.
Plastering with cm 1:3, 12mm thick for walls including cost of cement, all materials,curing, labour, lead and lift etc., complete.
Colour washing two coats with Ultima paint over one coat of white cement primer for outside wall including cost of all materials, labour, lead, lift, etc., complete. .
Fabrication and supplying of 20mm dia Bolt and nut of length 2.10 m, threading for a length of 15 cm at top and hot dip galvanising of bolt including supply of 2 nos of GI nuts and washers and fixing in the position as directed by the engineer at site including assembling of template etc., cost of template, all material, labour, lead, lift etc., complete
Supplying and fixing of various size of template for fixing fondation bolts including cost and transport of template, all labour, lead lift etc. complete.
Transport and erection of structure parts including bolt & nut , cutting , drilling holes , galvanizing as per IS 2629-1985 and IS 4759 -1966 with hot dip process as per Technical specification and bending as directed by the engineer in charge of the work including cost of all materials , galvanizing charges ,all labour ,lead and lift etc. complete.
Refilling with excavated earth other than sand and clay soil in foundation and sides of masonry, consolidation as per std.specn.with water including all, labour, lead , lift, etc., complete.
Dismantling of existing damaged RCC concrete by using grane as per instruction of field engineer at site and disposed the same away including labour,lead,lift etc., complete.
Hire charges for Earthmoving equipment (Grane,JCB) for clearing RCC structure levelling at site including cost of hire charges,fuel charges including labour,lead,lift etc., complete.
Providing pvc pipe using 110mm dia 4 KSC, PVC pipe and pvc clamp line supreme etc, including fixing PVC washer in correct position and connecting including cost of all materials, labour, lead, lift, etc., complete, including cost of PVC accessories and washers.
Supply of Materials (SCHEDULE - B )
Supply of Tower Parts, Bolts & Nuts as Per IS and technical specification including transport Charge etc complete.Fabrication, galvanising and supply of various type of tower parts and tower body/leg extensions & (complete excluding bolts, nuts and stubs) and including transport charges, hangers, D-shackles, and all taxes etc.
Supply of Hot dipped GI bolts & nuts including step bolts and electro-galvanised spring Washers as per relevant latest IS for towers, extensions, stubs including transport charges and all Taxes etc complete
Applicable GST 18%
Samsudeen (BID ID -1227823)
Thulasingam (BID ID -1229318)
K Rajkumar (BID ID -1229486)
MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED (BID ID -1228569)
K DHINAKARAN (BID ID -1228591)
JERALIN JERISH (BID ID -1229361)
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .