Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹14,600
Closing Date
11 Jun 2026, 4:00 pmDue tomorrow
Er. Mohammad Waseem
Office of the Executive Engineer RnB Ang
Construction of Drainage System at Reshi Colony Lane Number 5 Anantnag (Phase 1st)
2026_PWDJK_311632_2
NIT 23 of RnB/Ang/2026-27/2291-99 Dt 05/06/26
Open Tender
Civil Works
30 days
Anantnag
Please refer Tender documents.
4 documents required · 4 mandatory
₹300
Executiver Engineer rnB Division Anantnag
₹14,600
5 Jun 2026
5 Jun 2026
12 Jun 2026
5 Jun 2026
11 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of Labour for site clearence | 6 | no | - | - |
| 2 | Dismentalling/ manually /mechanically incl stacking of servicalbe material and disposal of unservicable material within 50 mtrs lead as per direction of EIC water bound macadam road 150 mm depth | 135.86 | sqm | - | - |
| 3 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, All kinds of soil: | 103.53 | cum | - | - |
| 4 | P/I dry stone soling (inc. backfilling of drain blocks) duly hand packed & consolidated with hand rammers inc. all carriage complete job | 8.8 | cum | - | - |
| 5 | Providing and laying in position cement concrete of (1:4:8) ratio excluding the cost of centring, shuttering and carraige of all work in foundation using coarse sand and 40mm nominial size aggregate include carraige of materials complete job. | 10.35 | cum | - | - |
| 6 | Providing and laying in position cement concrete of (1:2:4) ratio excluding the cost of centring, shuttering and carraige of all work in foundation using coarse sand and 20mm nominial size aggregate include carraige of materials complete job | 67.09 | cum | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for foundations | 352.3 | sqm | - | - |
| 8 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate incl carriage | 45.29 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_1009018.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid