| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹88.2 LAdmitted-Finance | ₹88.2 L | L1 | Admitted-Finance |
| 2 | L2₹95.2 L+₹7.1 L (8.01%)Admitted-Finance | ₹95.2 L+₹7.1 L (8.01%) | L2 | Admitted-Finance |
| 3 | L3₹95.2 L+₹7.1 L (8.01%)Admitted-Finance | ₹95.2 L+₹7.1 L (8.01%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified |
| Sl No | Description | Qty | Unit | Parveen Kumar Contractor L1 | D.P. ENTERPRISES L2 | M/s Global Engineers L3 |
|---|---|---|---|---|---|---|
| 1.01Sub Head and Item of Work | ||||||
| 1.10 | Dismantling the cement concrete steps of key monastery and Mane Lakhang Floor area, Parikrama, Front area by mechanically/manually means including disposal of material within 50 meters as per directed by site in-charge (including GST) | 77.21 | Cum | 2,400 ₹1,85,304 | 2,100 ₹1,62,141 Lowest | 2,500 ₹1,93,025 |
| 2.10 | Dismantling of R.R. Stone Masonry of wall, parapet wall by mechanically/manually means including disposal of material within 50 meters as per directed by site in-charge (including GST) | 34.4 | Cum | 2,400 ₹82,560 | 1,700 ₹58,480 Lowest | 2,500 ₹86,000 |
| 3.10 | Taking out the old pulverized old mud plaster and un even mud filling up to the depth of 20 cm from the roof , in-front , gallery , Parikrama area and Mane-Lakhang very carefully to avoid any damage to the underneath including placing the same within the complex for re use.(including GST) | 292.72 | Sqm | 300 ₹87,816 | 710 ₹2,07,831.2 | 280 ₹81,961.6 Lowest |
| 4.10 | Providing and laying cement concrete 1:3:6 (1cement:3c.Sand: 6 Stone aggregate 20mm size) of the Mane lakhang floor area. In front area, steps etc complete. (including GST) | 16.6 | Cum | 20,000 ₹3,32,000 | 9,100 ₹1,51,060 Lowest | 20,000 ₹3,32,000 |
| 5.10 | Construction of C.R stone masonry of main entrance steps and wall with lime mortar 1:1:1(1 Lime:1 Brick Surkhi: 1 C. Sand) and fine dressed C.R Stone by cutting and chiselling in required etc complete. (including GST) | 52.32 | Cum | 49,000 ₹25,63,680 | 14,500 ₹7,58,640 Lowest | 55,000 ₹28,77,600 |
| 6.10 | Procurement of readymade wooden pillar of railing of sal (hard) wood of size 1x0.115x0.115 as per the design and pattern of the already fixed wooden railing in main steps of the Key Moanstery complex etc complete (including GST) | 54 | Nos. | 7,600 ₹4,10,400 Lowest | 56,000 ₹30,24,000 | 8,500 ₹4,59,000 |
| 7.10 | Fixing in position the wooden pillar including providing wooden angular carved support in bottom of pillar with proper nails and screw. The pillar wil be fixed with 16 mm x 0.20 long bolt in concrete block of 0.15x0.15x0.15 and nut in pillar to provide adequate support and strength to the pillar (including GST) | 54 | Nos. | 2,000 ₹1,08,000 Lowest | 11,500 ₹6,21,000 | 2,200 ₹1,18,800 |
| 8.10 | Providing and fixing in position the horizontal and vertical member of the rail 0.08x0.05 thick in between the pillar including making necessary grooves in pillars and bar for proper fixing using adhesive nails etc. (including GST) | 0.75 | Cum | 5,00,000 ₹3,75,000 | 14,500 ₹10,875 Lowest | 4,70,000 ₹3,52,500 |
| 9.10 | Provisions for mud brick parapet wall of Mane Lakhang with sun brunt mud brick with mud mortar, Bhusa fine earth cow dung and lime putty etc... as original pattern. (including GST) | 7.9 | Cum | 17,000 ₹1,34,300 | 12,500 ₹98,750 Lowest | 18,500 ₹1,46,150 |
Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
6 Jul 2026, 3:00 pmClosed
Superintending Archaeologist
O/o SA ASI CGO Complex Longwood, Shimla
Conservation and restoration of Key Monastery Kaza
2026_ASI_913516_1
9-22/CONS/WORK PROP/2025-26
Open Tender
Civil Works
Works
120 days
Key Monastary Kaza
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Yes
Superintending Archaeologist
₹2.3 L
Yes
O/o SA ASI CGO Complex Longwood Shimla
10 Jul 2026
17 Jun 2026
7 Jul 2026
17 Jun 2026
6 Jul 2026
17 Jun 2026
23 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Sub Head and Item of Work | - | - | - | - |
| 1.1 | Dismantling the cement concrete steps of key monastery and Mane Lakhang Floor area, Parikrama, Front area by mechanically/manually means including disposal of material within 50 meters as per directed by site in-charge (including GST) | 77.21 | Cum | - | - |
| 2.1 | Dismantling of R.R. Stone Masonry of wall, parapet wall by mechanically/manually means including disposal of material within 50 meters as per directed by site in-charge (including GST) | 34.4 | Cum | - | - |
| 3.1 | Taking out the old pulverized old mud plaster and un even mud filling up to the depth of 20 cm from the roof , in-front , gallery , Parikrama area and Mane-Lakhang very carefully to avoid any damage to the underneath including placing the same within the complex for re use.(including GST) | 292.72 | Sqm | - | - |
| 4.1 | Providing and laying cement concrete 1:3:6 (1cement:3c.Sand: 6 Stone aggregate 20mm size) of the Mane lakhang floor area. In front area, steps etc complete. (including GST) | 16.6 | Cum | - | - |
| 5.1 | Construction of C.R stone masonry of main entrance steps and wall with lime mortar 1:1:1(1 Lime:1 Brick Surkhi: 1 C. Sand) and fine dressed C.R Stone by cutting and chiselling in required etc complete. (including GST) | 52.32 | Cum | - | - |
| 6.1 | Procurement of readymade wooden pillar of railing of sal (hard) wood of size 1x0.115x0.115 as per the design and pattern of the already fixed wooden railing in main steps of the Key Moanstery complex etc complete (including GST) | 54 | Nos. | - | - |
| 7.1 | Fixing in position the wooden pillar including providing wooden angular carved support in bottom of pillar with proper nails and screw. The pillar wil be fixed with 16 mm x 0.20 long bolt in concrete block of 0.15x0.15x0.15 and nut in pillar to provide adequate support and strength to the pillar (including GST) | 54 | Nos. | - | - |
| 8.1 | Providing and fixing in position the horizontal and vertical member of the rail 0.08x0.05 thick in between the pillar including making necessary grooves in pillars and bar for proper fixing using adhesive nails etc. (including GST) | 0.75 | Cum | - | - |
| 9.1 | Provisions for mud brick parapet wall of Mane Lakhang with sun brunt mud brick with mud mortar, Bhusa fine earth cow dung and lime putty etc... as original pattern. (including GST) | 7.9 | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.80 MB
Tendernotice_2.pdf
PDF • 3.25 MB
Tendernotice_3.pdf
PDF • 12.29 MB
Tendernotice_4.pdf
PDF • 0.85 MB
Acceptance.pdf
Tender Documents • 2.40 MB
Annexure-VI.pdf
Additional Documents • 0.60 MB
BOQ_960030.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .