Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical KHARGONE | MADHYA PRADESH | 450551 | Accepted-Technical AS PER ATTACH DOC. |
| 2 | Accepted-Technical 12 480441 | CHHINDWARA | MADHYA PRADESH | 480441 | Accepted-Technical AS PER ATTACH DOC. |
| 3 | Accepted-Technical 185 VILLAGE AND POST BADUD DISTRICT KHARGONE 451111 | KHARGONE | MADHYA PRADESH | 451111 | Accepted-Technical AS PER ATTACH DOC. |
| 4 | Not Admitted-PreQual/Technical | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.9 Cr
EMD Value
₹2.4 L
Closing Date
4 Sept 2026, 5:30 pmClosed
CMO
NAGAR PARISHAD CHHANERA NEW HARSUD DISTT KHANDWA
INTERCEPTION AND DIVERSION WORK FOR TAPPING NALLAH AND SETUP SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR CHHANERA TOWN
2026_UAD_526763_1
1428 Dated 03-08-2026
Open Tender
Civil Works - Others
Lump-sum
540 days
CHHANERA NEW HARSUD
YES
3 documents required · 3 mandatory
₹15,000
₹2.4 L
6 Oct 2026
4 Aug 2026
7 Sept 2026
4 Aug 2026
4 Sept 2026
15 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.Construction of 3 Nos of Screen Chambers
2.Construction of 3 Nos of Grit Chambers.
3.Construction of 3 Nos of Interception Diversion and weirs respectively.
4.Excavation & Laying of Sewer line (1937 m) & Manholes (73 Nos.), Filling for Bedding, NP-3 Pipes Sewer Pipe, Filling Over Pipe, Manholes & Miscellaneous Items.
5.Providing and laying of HT Feeder Line & Power supply from nearest overhead tapping point and 63 KV transformer.
6.Online Continuous Emission Monitoring System for proposed STP.
7.Design and build sewage treatment plant of installed capacity 2.5 MLD Sewage Treatment Plant (STP) and all appurtenant structures and allied works;
8.Plantation all around STP premises – 100 Nos
9.Disposal of water downstream of River and Reuse of treated water. | 1 | Lump-Sum | - | - |
| 2 | Operation and Maintenance Cost For 1st Years | 1 | Lump-Sum | 23,19,000 | ₹23,19,000 |
| 3 | Operation and Maintenance Cost For 2nd Years | 1 | Lump-Sum | - | - |
| 4 | Operation and Maintenance Cost For 3rd Years | 1 | Lump-Sum | - | - |
| 5 | Operation and Maintenance Cost For 4th Years | 1 | Lump-Sum | - | - |
| 6 | Operation and Maintenance Cost For 5th Years | 1 | Lump-Sum | - | - |
| 7 | Operation and Maintenance Cost For 6th Years | 1 | Lump-Sum | - | - |
| 8 | Operation and Maintenance Cost For 7th Years | 1 | Lump-Sum | - | - |
| 9 | Operation and Maintenance Cost For 8th Years | 1 | Lump-Sum | - | - |
| 10 | Operation and Maintenance Cost For 9th Years | 1 | Lump-Sum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
tenderdoc.pdf
Tender Documents • 1.35 MB
Annexuree.pdf
Other Document • 1.59 MB
BOQ_633965.xls
BOQ • 0.33 MB
Corrigendumnitno2.PDF
PDF • 0.55 MB
Corrigendumnitno1428.pdf
PDF • 2.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .