| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
4 May 2022, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (BP) VADIPATTI
PANCHAYAT UNION OFFICE VADIPATTI
MADURAI DISTRICT CONSTRUCTION OF STEEL BRIDGE ACROSS THE RIVER AT T.PUDUR IN THENKARAI PANCHAYAT IN VADIPATTI BLOCK UNDER MLACDS 2021-22
2022_RDTN_230345_1
MLACDS 2021-22/VAD/RTENDER/P01
Open Tender
Civil Works
Item Rate
120 days
VADIPATTI
Refer Tender document
3 documents required · 3 mandatory
₹0
₹30,000
4 May 2022
26 Apr 2022
4 May 2022
26 Apr 2022
4 May 2022
27 Apr 2022
Amount
Earth work excavation using piling in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
R.Cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Providing tubular and Angle section of size 80mmx40x2.90mm hollow pipe of 4''spacing with proper welding and neceeary veritical postsof standrad size with cost and conveyance including all charges
Supllying and filling with US Gravel in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete
Retaining wall
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and errecting shuttering including necessary support for plane surface using steel shuttering for sides of CC pavement including all cost and conveyance of material and labour charges etc complete.
Above G.L
C.C. 1:3:6-using 40mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
R.Cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
U MURUGAN
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].