| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance PLOT NO 13 II ND CROSS STREET RAMESH NAGAR VALASARAVAKKAM CHENNAI 600 087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 Cr+₹11.5 L (5.89%)Admitted-Finance | ₹2.1 Cr+₹11.5 L (5.89%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K S CONSTRUCTION L1 | H.Venkateswaran L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing Jungles including cost of all labour, lead,lift,and away from the site etc., complete as directed by Engineer at site. | 1,800 | sqm | 10 ₹18,000 | 6 ₹10,800 Lowest |
| 2.00 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand , silt or other loose soil, wet sand or silt not under water,light black cotton soil, sandy loom and ordinary soil including excavated earth | 971 | cum | 300 ₹2,91,300 | 200 ₹1,94,200 Lowest |
| 3.00 | Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 96 | cum | 1,500 ₹1,44,000 | 800 ₹76,800 Lowest |
| 4.00 | Supplying and filling with well gravel in basements in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 1,056 | cum | 700 ₹7,39,200 Lowest | 800 ₹8,44,800 |
| 5.00 | Providing and laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation concrete including cost of all labour, materials, lead, lift, curing etc., complete | 96 | cum | 6,500 ₹6,24,000 Lowest | 6,500 ₹6,24,000 Lowest |
| 6.00 | R.C.C 1:1.5:3 using 12 to 20 mm HBG metal including cost of all materials, labour, lead lift and curing etc., complete but excluding cost of steel reinforcement. (Without form work) | 175 | cum | 8,000 ₹14,00,000 Lowest | 10,000 ₹17,50,000 |
| 7.00 | R.C.C 1:1.5:3 using 12 to 20 mm HBG metal including cost of all materials, form work, labour, lead lift and curing etc., complete but excluding cost of steel reinforcement. (With form work) | 174 | cum | 15,000 ₹26,10,000 Lowest | 20,000 ₹34,80,000 |
| 8.00 | R.C.C 1:1.5:3 using 12 to 20 mm HBG metal for Cover slab including cost of all materials, form work, labour, lead lift and curing etc., complete but excluding cost of steel reinforcement. | 12.5 | cum | 15,000 ₹1,87,500 Lowest | 20,000 ₹2,50,000 |
| 9.00 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting , bending , tying and fixing in position as per specification including cost of all materials ,lead ,lift ,labour ,cost of binding wire etc.complete | 28 | MT | 95,000 ₹26,60,000 | 75,000 ₹21,00,000 Lowest |
| 10.00 | PCC 1:2:4 using 12 to 20mm HBG machine crushed metal including cost of all materials, cement, all labour, lead, lift, etc. complete. With out form work | 14 | cum | 10,000 ₹1,40,000 | 7,000 ₹98,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
2 Aug 2022, 2:30 pmClosed
CE/TP-I/CHN
O/o the Chief Engineer/Transmission Projects I / Chennai, 3rd Floor , 110 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32.
Providing 230KV side equipment plinths, supply and fabrication and erection of 230KV lattice equipment structures for the extension of 230KV Supply to M/s.First Solar ( demand of 52 MVA) at SIPCOT Industrial park, from Sriperumbudur 400KV SS
2022_EB_243308_1
TP1-075/2022-23
Open Tender
Civil Works
Works
120 days
Sriperumbudur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.2 L
Yes
12 Aug 2022
22 Jul 2022
3 Aug 2022
22 Jul 2022
2 Aug 2022
22 Jul 2022
Amount
Clearing Jungles including cost of all labour, lead,lift,and away from the site etc., complete as directed by Engineer at site.
Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand , silt or other loose soil, wet sand or silt not under water,light black cotton soil, sandy loom and ordinary soil including excavated earth
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification
Supplying and filling with well gravel in basements in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification
Providing and laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation concrete including cost of all labour, materials, lead, lift, curing etc., complete
R.C.C 1:1.5:3 using 12 to 20 mm HBG metal including cost of all materials, labour, lead lift and curing etc., complete but excluding cost of steel reinforcement. (Without form work)
R.C.C 1:1.5:3 using 12 to 20 mm HBG metal including cost of all materials, form work, labour, lead lift and curing etc., complete but excluding cost of steel reinforcement. (With form work)
R.C.C 1:1.5:3 using 12 to 20 mm HBG metal for Cover slab including cost of all materials, form work, labour, lead lift and curing etc., complete but excluding cost of steel reinforcement.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting , bending , tying and fixing in position as per specification including cost of all materials ,lead ,lift ,labour ,cost of binding wire etc.complete
PCC 1:2:4 using 12 to 20mm HBG machine crushed metal including cost of all materials, cement, all labour, lead, lift, etc. complete. With out form work
PCC 1:2:4 using 12 to 20mm HBG machine crushed metal with form work including cost of all materials, cement, all labour, lead, lift, etc. complete. With form work
Plastering with cm 1:5 mix using 12mm thick for inside and outside walls, plinth protection including cost of all materials,labour,lead, lift etc complete
Fabrication and supplying of Foundation bolt threading for a length of 15 cm at top and hot dip galvanising of bolt including supply of 3 nos of GI nuts and washers and fixing in the position as directed by the engineer at site including all material, labour, lead, lift etc., complete (20 mm dia 1750 mm length)
Fabrication and supplying of Foundation bolt threading for a length of 15 cm at top and hot dip galvanising of bolt including supply of 3 nos of GI nuts and washers and fixing in the position as directed by the engineer at site including all material, labour, lead, lift etc., complete (20 mm dia 1200 mm length)
Assembling of template for all Structures including cost of template, transport charges all labour lead, lift, etc, complete.
Labour charges for transporting and erection of towers with bolt nut including sorting out of tower parts tightening, punching of bolts and nuts and rectification of defects if any during erection, cost of lead lift labour etc complete.
Painting 2 coats Exterior Emulsion Painting two coats with approved quantity White cement over a waterbase primer as priming coat, including cost of all materials, labour, lead, lift, T&P, etc. complete.
Supplying and layling of PVC 110mm dia pipe with required PVC bend T&L bend, union including cutting, jointing where ever necessary earth work excavation refilling necessary fittings, all materials etc., complete.
Supplying and layling of PVC 32mm dia pipe with required PVC bend T&L bend, union including cutting, jointing where ever necessary earth work excavation refilling necessary fittings, all materials etc., complete.
Supplying and layling of PVC 25mm dia pipe with required PVC bend T&L bend, union including cutting, jointing where ever necessary earth work excavation refilling necessary fittings, all materials etc., complete.
Supplying and fixing of 32mm dia gunmental value including cost of material, labour, lead, lift etc., complete.
Supplying and fixing of 25 mm dia gunmental value including cost of materisl, labour, lead, lift etc., complete.
Filling with stone dust including cost of metal ,labour all lead and lift etc., Complete.
Filling with 20 mm B.G metal including cost of metal ,labour all lead and lift etc., Complete.
Supplying, fabrication and transporting of various equipments lattice structure including cost of all materials for G.I angles, hot tip galvanising, all labour, lead, lift, etc. complete.
Supplying, fabrication and transporting of various size of ISI GI Bolt&Nut with washer as per IS standards and approved by competent authority before erection as per the requirement to site including cost of material lead lift labour etc complete.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
H.Venkateswaran
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .