Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.6 LAccepted-AOC BAGDIHI JHARSUGUDA | L1 | Accepted-AOC Successful | |
| 2 | L2₹31.3 L+₹1.6 L (5.45%)Rejected-AOC | L2 | Rejected-AOC Unsuccessful | |
| 3 | L3₹32.1 L+₹2.5 L (8.35%)Rejected-AOC | L3 | Rejected-AOC Unsuccessful | |
| 4 | l4₹34.6 L+₹5.0 L (16.8%)Rejected-AOC | l4 | Rejected-AOC Unsuccessful |
Tender Value
₹40.7 L
EMD Value
₹40,725
Closing Date
16 Mar 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, JHARSUGUDA
Repair and Renovation of Tahasil office at Laikera for the year 2025-26
2026_CERWI_127095_1
Online SEJSG 16 of 2025-26
Open Tender
Civil Works - Buildings
Percentage
90 days
Jharsuguda
2 documents required · 2 mandatory
₹6,000
₹40,725
Yes
24 Jul 2026
10 Mar 2026
17 Mar 2026
10 Mar 2026
16 Mar 2026
10 Mar 2026
10 Mar 2026 - 13 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling Brick / Tile work in cement mortar including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | 1.15 | cum | 425.95 | ₹488.99 |
| 2 | Boundary Wall & gate | 5.59 | cum | 425.95 | ₹2,381.49 |
| 3 | Removing old lime or cement plaster from walls including racking out joints 12mm deep and removing the debris with in 50 m lead. | 58.67 | sqm | 57.95 | ₹3,399.93 |
| 4 | First Floor | 55.83 | sqm | 57.95 | ₹3,235.35 |
| 5 | Construction of embankment with approved materials obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5 Kms, spreading, grading to required slope and compacting to meet requirement of specification. | 14.96 | cum | 161.35 | ₹2,413.8 |
| 6 | Earthwork in excavation of foundation in hard soil with all leads and lifts including dressing the sides and levelling the bed of the foundation including cost of all labour required for the work etc. complete with all other machineries required for the work and stacking the excavated materials away from the working area as directed by the Engineer-in-Charge including 1% Cess. | 2.43 | cum | 276.89 | ₹672.84 |
| 7 | Boundary Wall & gate | 64.43 | cum | 276.89 | ₹17,838.64 |
| 8 | Approach Road | 101.22 | cum | 276.89 | ₹28,027.64 |
| 9 | Supplying and filling foundation and plinth with sand well watered & rammed with cost, conveyance, royalty and taxes of all materials labour required for the work as per specification and direction of the Engineer-in-Charge including royalty of materials including 1% Cess. | 0.54 | cum | 699.86 | ₹377.92 |
| 10 | Boundary Wall & gate | 9.05 | cum | 699.86 | ₹6,334.43 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.68 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_584599.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .