Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹13.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹13.2 LAdmitted-Fee/PreQual/Technical/Finance 2313 SF 262 7 PETROL BUNK BACKSIDE P N ROAD TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | ₹13.2 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹13.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹13.2 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹13.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹13.4 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹14.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹14.3 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Shree Jayabharatham infra private Limited L4 | Arumugam L2 | RAVICHANDRAN B L6 | VASANTHA CONSTRUCTIONS L7 | Muthumari Sundram L5 | R.THIRUPATHIRAJ L1 | Yasothai L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction of Drainage with Horizontal Soak Pit at Chinnachettikurichi Village in Chettikurichi Panchayat | ||||||||||
| 1.01 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B | 80.28 | m3 | 259 ₹20,792.52 | 180.64 ₹14,501.78 | 125.3 ₹10,059.08 Lowest | 130.57 ₹10,482.16 | 250 ₹20,070 | 260 ₹20,872.8 | 185.64 ₹14,903.18 |
| 1.02 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete | 27.36 | m3 | 5,396 ₹1,47,634.56 | 5,012.3 ₹1,37,136.53 | 5,259.26 ₹1,43,893.35 | 5,480.7 ₹1,49,951.95 | 5,150 ₹1,40,904 | 5,300 ₹1,45,008 | 4,914.24 ₹1,34,453.61 Lowest |
| 1.03 | Supplying and erecting centering shuttering including necessary supports includign all charges etc., complete. | 569.05 | m3 | 358.6 ₹2,04,061.33 | 425.61 ₹2,42,193.37 | 520.13 ₹2,95,979.98 | 542.03 ₹3,08,442.17 | 525 ₹2,98,751.25 | 320 ₹1,82,096 Lowest | 401.56 ₹2,28,507.72 |
| 1.04 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 67.58 | m3 | 6,136 ₹4,14,670.88 | 6,321.28 ₹4,27,192.1 | 5,975.4 ₹4,03,817.53 | 6,226.99 ₹4,20,819.98 | 5,870 ₹3,96,694.6 Lowest | 6,000 ₹4,05,480 | 6,124.05 ₹4,13,863.3 |
| 1.05 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 1.38 | m3 | 8,957.3 ₹12,361.07 | 6,957.28 ₹9,601.05 | 8,702.4 ₹12,009.31 | 9,069.13 ₹12,515.4 | 8,630 ₹11,909.4 | 8,000 ₹11,040 | 6,483.08 ₹8,946.65 Lowest |
| 1.06 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing | 362.16 | kg | 90.38 ₹32,732.02 | 65.3 ₹23,649.05 Lowest | 87.31 ₹31,620.19 | 90.99 ₹32,952.94 | 88 ₹31,870.08 | 79 ₹28,610.64 | 82.6 ₹29,914.42 |
| 1.07 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc | 91.2 | m3 | 279.3 ₹25,472.16 | 218.35 ₹19,913.52 | 270.31 ₹24,652.27 | 281.69 ₹25,690.13 | 270 ₹24,624 | 280 ₹25,536 | 216.1 ₹19,708.32 Lowest |
| 2.00Horizontal Filter | ||||||||||
| 2.01 | Earth work excavation in Hard Soil - Earth work excavating and Deposting with in initial Lead 0f 10m and lift of 2m (For roads,Supply Channels,Desting of MI Tanks,Pond & Kulam) - upto 0.30m depth | 70.61 | m3 | 259.43 ₹18,318.35 | 248.74 ₹17,563.53 | 250.59 ₹17,694.16 | 261.14 ₹18,439.1 | 250 ₹17,652.5 | 270 ₹19,064.7 | 212.48 ₹15,003.21 Lowest |
Tender Value
₹15.6 L
EMD Value
₹15,550
Closing Date
20 Aug 2026, 4:00 pmClosed
The Block Development Officer (V.P)
The Block Development Officer (V.P),Aruppukottai
Construction of Drainage with Horizontal Soak Pit at Chinnachettikurichi Village in Chettikurichi Panchayat
2026_RDTN_690599_1
ROC/DP-1/265/2026 dated 25.07.2026
Open Tender
Civil Works
Item Wise
Chettikurichi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,550
The Block Development Officer (V.P),Aruppukottai
20 Aug 2026
4 Aug 2026
20 Aug 2026
4 Aug 2026
20 Aug 2026
4 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Drainage with Horizontal Soak Pit at Chinnachettikurichi Village in Chettikurichi Panchayat | |||||
| 1.01 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B | 80.28 | m3 | - | - |
| 1.02 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete | 27.36 | m3 | - | - |
| 1.03 | Supplying and erecting centering shuttering including necessary supports includign all charges etc., complete. | 569.05 | m3 | - | - |
| 1.04 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 67.58 | m3 | - | - |
| 1.05 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 1.38 | m3 | - | - |
| 1.06 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing | 362.16 | kg | - | - |
| 1.07 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc | 91.2 | m3 | - | - |
| 2Horizontal Filter | |||||
| 2.01 | Earth work excavation in Hard Soil - Earth work excavating and Deposting with in initial Lead 0f 10m and lift of 2m (For roads,Supply Channels,Desting of MI Tanks,Pond & Kulam) - upto 0.30m depth | 70.61 | m3 | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_830279.xls
BOQ • 0.26 MB
document.pdf
Tender Documents • 1.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].