Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.4 Cr
EMD Value
₹2.7 L
Closing Date
8 Dec 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TECH SIG
17 conditions · 2 needing a document upload
: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less, where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderer shall submit requisite information as per Annexure-VIII given in tender document, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. As per Clause No. 10.2 of Tender Form (second Sheet) of Annex. I of Part-I of GCC-2022, with up to date correction slip.
If the tenderer submits/ upload Audited Balance sheet duly certified by a chartered accountant to fulfill the Standard Financial Criteria, the tenderer may also submit/ upload Form No. 26AS /16A along with the tender offer to certify the amount of contractual receipt.
(a) The tenderer must have successfully completed or substantially completed any of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work each costing not less than the amount equal to 60% ofadvertised value of the tender. (b) (1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender.
Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b) (2) In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Signal & Telecom Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Signal & Telecom Engineer in writing.
Note: A work experience certificate from a private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate. As per Clause No. 10.1 of Tender Form (second Sheet) of Annex.I of Part-I of GCC-2022, with up to date correction slip
Defination of Similar Work :- Any RRI/PI/EI/MACLS Supply, Installation Testing, Commissioning Signalling work OR Any RRI/PI/EI/MACLS Alterations Signalling work OR Any CTC/TMS Work
15 conditions · 5 needing a document upload
The tenderer must opt for payment by letter of credit (LC) as per the Railway Board's letter no. 2018/CE-I/CT/9 dated 04.06.18.
Tenderers are required to quote their Permanent Account Number in the tender document.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
No garbage, dry leaves, paper, grass, bushes, or any other items shall be burnt. They shall only be disposed of at the nominated disposal point by prescribed methods, duly observing the Municipal Solid Wastes (Management and Handling) Rules, 2000 indicates under Schedule II- Management of Municipal Solid Wastes: Para I.I vii that Waste(garbage, dry leaves) shall not be burnt. Any violation of the provisions of the MSW rules,2000, attracts the penal provisions of the Environment(Protection) ACT,1986.CPCB and SPCBs have also issued various guidelines/orders against the practice of such open burning. If the contractor or anybody deployed by him for this work is found guilty of unregulated open burning of plastic, rubber, waste, and similar substances, a fine of Rs. 5000/- on each occasion shall be imposed in addition to the other rights and remedies available in the contract. The decision of the Engineerin-Charge shall be final and binding in this regard.
The EI alteration work is to be done at the Parsneu & Bikaner East station of the BKN-RTGH section of the Bikaner Division. The EI alteration work is related to the provision of Track Machine Siding. The Mini-Plan of the PSV & BKNE station is attached to the document. EI OEM of BGD station - M/s HITACHI RAIL STS INDIA PRIVATE LIMITED - BANGALORE.
S&T associated indoor and outdoor work in c/w provision of track machine siding at BGD station under the Jurisdiction of SSE/Sig/BTI over Bikaner Division.
SnT-BKN-2026-27-24R~NWR
SnT-BKN-2026-27-24R
Open
Works - General
12 Months
Bikaner, Rajasthan
₹0
₹2.7 L
13 Nov 2026
13 Nov 2026
24 Nov 2026
192 items across 15 schedules · ₹1,03,28,747.94 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| manufacture and supply of Hot Architecture Electronic (EI) system complete as per specification No. RDSO/SPN/192/2019 Ver. 2 or latest, as technical requirement & tentative Signalling Plans & Diagrams. Interlocking (EI) system mainly i n g of Central Processing Interface Equipment/Relays per requirements, Dual operator Grade VDU panel (42" LED) with (Hot stand-by dual VDU one system online and other standby mode), All Interfacing suitable for EI, interconnecting Jumper wires, Industrial grade Terminals (32'' LED with UPS 1 hr back up), required power converters for EI equipments, for EI equipments and Relay fuses, screw less disconnecting terminals, fixture mounting and accessories necessary the EI system functional as per signaling plan. The tenderer furnish complete details of cards/ sub-modules connectors etc. for station. Supply of 10% Essential the EI equipments subject to one of each type mainly of processor, cards/ module, relay etc. Item wise detailed with unit and quantity to be in separate annexure. (THIS SHALL BE USED ONLY FOR WORK IN EXISTING EI) RDSO Inspection charges: Railways Payment terms:100% | — | — | — | — | |
| 1 | with routes less than 100(Per be read as Per Vital Bit of | Per Unit | 20.00 | 87,987.65 | 17,59,753 |
| 2 | wiring, programming, testing commissioning of EI equipment as per supply item in item no. 1.7 Chapter 1 of this SOR including from Consignee's depot to works and materials for wiring, testing and grouting, cutting of floors, refilling of the same, re-plastering, CC/ masonry works, fixing/ laying of insulated ladders/ cable trays/ RCC/GI pipes termination of cables with lugs/ painting,/ lettering are to be done by the contractor for the supplied vide item no. 7 of 1 of SOR. This also covers the of built in EI Data loggers of all to monitor the system to any places where desired by Engineer- (THIS ITEM SHALL BE USED ALTERTION WORK IN EXISTING Installation shall be comply to Technical Advisory Note No dtd. 28.08.2014. wiring, programming, testing commissioning of Operator VDU in stand-by with Redundancy. Any Equipments/cards/Modules required for with Redundancy shall be & Installed by the Contractor. also includes supply of Two composite computer & printer (Godrej work station table) and one make operator chair model Termination of indoor/ PIJF relay room on relays, tag blocks, as per approved wiring diagram alterations/ modifications as at site. Soldering to be done at termination. Dressing/ lacing shall be done neatly with help of thread / plastic self lock strip of size. The tools/ equipments/ simulation boards required for shall be supplied / fabricated by This includes replacement of cards/ LEDs/ equipments going during testing. Necessary power boards with required capacity sockets, surge & lightning boxes shall be supplied and by the contractor. 230V supply arranged by Railways. In case are required to be extended, room / relay room then same extended by the contractor with materials such as 1X16 sq mm cables, lugs, RCC/GI pipes, ladders etc. After ST/LT testing, Acceptance Tests (FAT) & Square testing system should be fault free submitting to Railways, otherwise necessary action can be taken by Engineer-in-charge. Inspection: Consignee charges: None Payment terms: commissioning. | Job | 1.00 | 5,42,784.93 | 5,42,784.93 |
| 3 | work station note book as per Specifications . It also includes Laser Printer (Only branded). workstation should be capable of the system in case of any in yard interlocking in future. Specifications should be with the tender document by authority. Inspection: Inspection charges: None terms: 100% after supply | Station | 1.00 | 86,892.73 | 86,892.73 |
| 4 | preparation & supply of drawings print copies and original in AUTO CAD FORMAT for Interlocking at each station. completion of the work, the drawings incorporating details are to be supplied as Technical Specifications given in document (upto 6 Line). The specifications are as per 1.13 of SOR. Inspection: Inspection charges: None terms: 100% after execution | Station | 1.00 | 1,75,967.35 | 1,75,967.35 |
| 5 | of SWR literature in english associated mid-section gate with all corrections as SWRD & approved SIP. For technical corrections, editing, correction etc. are to be out and one rough print to be railways for approval before as required for final processing sanction. This also includes of maintenance cards in provided by Rly. Inspection: Inspection charges: None terms:100% after execution. | Station | 1.00 | 3,598.62 | 3,598.62 |
| 6 | of Station Working Rules from hindi and framing out in DIGLOT similar software )as per extant The required SWR in english provided by the contractor and has covered separately in item no. 1.21 1 of this SOR. Inspection: Inspection charges: None terms:100% after execution. | Station | 1.00 | 4,478.18 | 4,478.18 |
| 7 | photocopies & binding of the SWR in English/hindi/Diglot form as Railway practice. Inspection: Inspection charges: None terms:100% after execution. | Set | 6.00 | 178.52 | 1,071.12 |
| 8 | in existing relay room includes supply of PVC insulated Railway signallingcable @40<45@Core/40-Core) of (1/0.6) sqmm RDSO Spec.No.IRS/S-76/89 or latest) for wiring betweenrelay SM's/Panel room & Relay room SM office for block working. This includes supply of PVCinsulated wires of multi strand 16/.2 mm, in all colours as per RDSO Specn.No.IRS-S-76/89(Amnd.2 orlatest). will include bringing all the supplies from power room to bus bars on relay racks 10/6 sqmm copper flexible wire instructions of engineer incharge. include wiring between and relay room if required. will be done as per standard of North Western Railway with & threading. The item supply & wiring of tag block, fuse bases(G-Type and ND Type) and all related material required for indoor wiring in relay ConsigneeInspection NonePayment terms:100% after | Per Relay | 50.00 | 524.1 | 26,205 |
| Schedule total | ₹26,00,750.93 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
EITAN300702.11.2012.pdf
ATTACHMENT
EITAN301210.08.2016.pdf
ATTACHMENT
EITANoncybersecurity.pdf
ATTACHMENT
Mini-PlanBGD.pdf
ATTACHMENT
24R.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .