Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.7 Cr+₹54.0 L (25.2%)Admitted-Finance | ₹2.7 Cr+₹54.0 L (25.2%) | L2 | Admitted-Finance |
| 3 | L3₹4.2 Cr+₹2.0 Cr (95.4%)Admitted-Finance | ₹4.2 Cr+₹2.0 Cr (95.4%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MECHANO ENGINEERING COMPANY L2 | Mikado Tools & Gauges L1 | Star Wire (India) Engineering Ltd L3 |
|---|---|---|---|---|---|---|
| 1.00For Kopili Unit-2 (the following materials should as per Annexure-A of this LNIT) | ||||||
| 1.10 | Upper Cone. | 1 | Nos. | 30,75,000 ₹36,28,500 | 25,05,800 ₹31,26,844 Lowest | 59,90,000 ₹70,68,200 |
| 1.20 | Lowe Cone | 1 | Nos. | 26,75,000 ₹31,56,500 | 21,80,500 ₹27,32,990 Lowest | 41,75,000 ₹49,26,500 |
| 1.30 | Dismantling ring & Accessories. | 1 | Nos. | 7,00,000 ₹8,26,000 | 2,37,200 ₹3,29,896 Lowest | 6,40,000 ₹7,55,200 |
| 1.40 | Other Accessories. | 1 | Lot | 5,00,000 ₹5,90,000 Lowest | 4,86,200 ₹6,43,716 | 9,40,000 ₹11,09,200 |
| 1.50 | Trial Assembly | 1 | Lot | 1,50,000 ₹7,27,000 | 2,50,000 ₹2,95,000 | 60,000 ₹70,800 Lowest |
| 2.00For Kopili Unit-3 & Unit-4 (the following materials should as per Annexure-B of this LNIT) | ||||||
| 2.10 | Upper Cone. | 2 | Nos. | 30,75,000 ₹72,57,000 | 25,05,800 ₹62,53,688 Lowest | 59,90,000 ₹1,41,36,400 |
| 2.20 | Lowe Cone | 2 | Nos. | 26,75,000 ₹63,13,000 | 21,80,500 ₹54,65,980 Lowest | 41,75,000 ₹98,53,000 |
| 2.30 | Dismantling ring & Accessories. | 2 | Nos. | 7,00,000 ₹16,52,000 | 2,37,200 ₹6,59,792 Lowest | 6,40,000 ₹15,10,400 |
Tender Value
₹2.9 Cr
Closing Date
15 Dec 2021, 5:00 pmClosed
As per NIT
As per NIT
DESIGN ENGINEERING MANUFACTURING, SHOP ASSEMBLY TESTING AT MANUFACTURER WORKS SUPPLY and DELIVERY AT SITE OF THREE SET OF D T CONE ASSEMBLY REQUIRED FOR 4X50 MW KOPILI POWER STATION OF KHEP NEEPCO LIMITED UMRANGSO DIST DIMA HASAO ASSAM
2021_NEEPC_94775_1
KHEP LNIT 15 date 15.11.2021
Limited
Electrical Works
Works
180 days
As per NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
15 Jan 2022
15 Nov 2021
17 Dec 2021
16 Nov 2021
15 Dec 2021
17 Nov 2021
Amount
For Kopili Unit-2 (the following materials should as per Annexure-A of this LNIT)
Upper Cone.
Lowe Cone
Dismantling ring & Accessories.
Other Accessories.
Trial Assembly
For Kopili Unit-3 & Unit-4 (the following materials should as per Annexure-B of this LNIT)
Upper Cone.
Lowe Cone
Dismantling ring & Accessories.
Other Accessories.
Trial Assembly
MECHANO ENGINEERING COMPANY
Star Wire (India) Engineering Ltd
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
LNITDocument15.pdf
Tender Documents • 0.69 MB
ANNEXURE_B_FOR_UNIT_3_and_4.pdf
Other Document • 10.34 MB
ANNEXURE_A_FOR_UNIT_2.pdf
Other Document • 9.95 MB
BOQ_103164.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .