Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.7 LAccepted-AOC | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹17.0 L+₹21,735 (1.30%)Rejected-AOC | L2 | Rejected-AOC REJECT | |
| 3 | L3₹17.1 L+₹36,721 (2.19%)Rejected-AOC 3 176 ARULJOTHI NAGAR KARANAMPETTAI SULUR VIA COIMBATORE 641401 | COIMBATORE | TAMIL NADU | 641401 | L3 | Rejected-AOC REJECT |
Tender Value
₹21.9 L
EMD Value
₹21,880
Closing Date
9 Oct 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Restoration of BT surface at Thottipalayam road in Ward No. 7 East Zone.
2023_MAWS_374279_2
E63/2023
Open Tender
Civil Works
Works
120 days
COIMBATORE
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹21,880
15 Mar 2024
30 Sept 2023
10 Oct 2023
30 Sept 2023
9 Oct 2023
30 Sept 2023
Amount
1.Earth Work Excavation in all Soil with Initial Lead and Left etc., Complete a) Ordinary Soil (SS 20 A) Earth work excavating and depositing on bank with intial lead of 10 m & initial lift of 2 m in and, silt or other loose Soil, Wet Sand or silt not under water, light black cotton soil sandy loam and 106.25 cum 116.88 ordinary soil including excavated earth (SS 20 A)
Removal of Excavated Excess Earth away from the site to 2 K.M including loading and transportation charges etc, complete as per standard
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
Providing and laying 50 mm compacted thick dense bituminous macadam using 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2- 2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70 bitumen for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20- 30t C M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,including all other incidental chargesetc.,complete using C M P clause 505 of MORTH Rev-5
Providing and laying Bituminous concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm , 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 45.25 kgs of VG60/ VG70 bitumen,5.03 kg plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to paver site , spreading the mix to uniform thickness of 40mm /30 mm with mechanical paver to the specified grades and cross sections and consolidated by 80-10 tonne vibratory/ pneumatic roller to the required density etc., including labvour for attending to paver site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver finisher /9m paver finisher , vibratory / pneumatic roller and all other tools and plant required , including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
S V Constructions
SRI MURUGAN CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .