| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAdmitted-Finance | ₹8.8 L | L1 | Admitted-Finance |
| 2 | L2₹8.8 LAdmitted-Finance | ₹8.8 L | L2 | Admitted-Finance |
| 3 | L3₹10.7 LAdmitted-Finance | ₹10.7 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Disqualified on account of Not meeting Bidding Capacity as per NIT condition |
| Sl No | Description | Qty | Unit | K R TRADERS L1 | K.MADHUKAR L3 | S KARUNAKARAN L2 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing light jungle area of all kinds of shrubs, bulb weeds, grass, small plants, branches including cutting all unwanted plants, branches, twigs, wild growth, thorny leaves etc. complete, and disposing the same as place specified by Engineer, transporting at contractors own cost complete all as directed by the Engineer-in-Charge. Note: The unwanted cut bulb weeds, wild grass, unwanted vegetation are to be periodically collected and transported to dumping yard. During execution period any damages shall be rectified to the original at contractor cost. The measurement for payment shall be taken prior to cut the jungle and as directed by the Engineer-in-Charge. The rate shall include the cost of labour, transportation, loading, and unloading at dumpyard or place as directed by Engineer-in-Charge. | 60,000 | Sq.m. | 3.7 ₹2.2 L | 5.2 ₹3.1 L | 4 ₹2.4 L |
| 2.00 | Sweeping and Cleaning the concrete surfaces daily around the lab area and pathway area in IGCAR complex including collecting and stacking swept material for disposal upto 4km and as directed by the Engineer-in-Charge. Note: 1. Every time cleaning area shall be measured for payment 2. The contractor shall engage minimum 1 number of workers daily as directed by the Engineer-in-Charge. Failure to deploy the minimum number of labour will attract recovery with the minimum wages for every default of labour as mentioned in specification. 3. The rate should also include sweeping tools etc. 4. The contractor shall supply the necessary PPE to the workers. 5. The rate shall include the cost of hire charges of lorry and labour for transporting of sweeping materials to the dumping yard. | 3,18,000 | Sq.m. | 0.7 ₹2.2 L | 0.6 ₹1.9 L | 0.9 ₹2.9 L |
| 3.00 | Sweeping and Cleaning the road surfaces including water table, road junction & pavement on both sides of roads from new IGCAR gate to Main Gate complex area or IGCAR area or DAE Installations (as required by Engineer-in-Charge) two times in a Month or when and where ever required including collecting upto 200m and stacking swept material for disposal up to 4km Lead complete all as directed by the Engineer-in-Charge. Note: 1. Every time cleaning area shall be measured for payment. 2. The contractor shall engage minimum 2 numbers of workers daily as directed by the Engineer-in-charge. Failure to deploy the minimum numbers of labour will attract recovery with the minimum wages for every default of labour. 3. The contractor shall supply the necessary PPE to the workers. 4. The rate should also include sweeping tools etc. 5. The rate shall include the cost of hire charges of lorry and labour for transporting of sweeping materials to the dumping yard. | 1,50,000 | Sq.m. | 0.65 ₹97,500 | 0.75 ₹1.1 L | 0.95 ₹1.4 L |
| 4.00Cleaning the storm water drain when and wherever required including collection of all unwanted leaves, small plants, silt and other unwanted debris etc. upto initial lead 200m and stacking for disposal upto 5km lead at place specified by Engineer, all complete as directed by the Engineer-in-Charge. | ||||||
| 4.01 | Width above 500mm upto 1000mm wide with cover slab | 1,500 | Metres | 9 ₹13,500 | 8 ₹12,000 | 5 ₹7,500 |
| 4.02 | Width above 500mm upto 1000mm wide with out cover slab | 1,000 | Metres | 6 ₹6,000 | 6 ₹6,000 | 4 ₹4,000 |
| 5.00 | Levelling, bull-dozing the heeped / dumped loosened earth / debris etc., by hiring JCB / Bull-dozer etc., including transporting, operating the vehicle, operating the vehicle by engaging driver/operator with valid driving license, diesel charges, insurance and admissible taxes, labour if any required etc. complete all as directed by Engineer-in-Charge. | 30 | Hours | 1,100 ₹33,000 | 1,100 ₹33,000 | 1,500 ₹45,000 |
| 6.00Conveying the surplus excavated earth & debris, boulders and spoil by mechanical means and depositing at places inside DAE installation identified as Dumping yard as per requirement with a lead specified below including loading, unloading, breaking clods, levelling all complete as per specification and as directed by the Engineer-in-Charge. Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. 2) The earth shall be dumped well inside the Dumping yard and not over approach pathway road. | ||||||
| 6.01 | Lead charges for lead Exceeding 3 kilometre but not exceeding 4 kilometre | 300 | Cu.m. | 280 ₹84,000 | 300 ₹90,000 | 240 ₹72,000 |
| 7.00 | Clearing blockage in storm water drain, mouth outlets, road side berm rain water pipes, cutting and removing of fallen trees etc., during the monsoon period, cyclone time and rainy days, and all other essential miscellaneous works etc., complete as directed by the Engineer-in-Charge. Note: Contractor has to engage a minimum of 1 number of male coolies per unit with all PPE like Raincoat, Gumboot, PVC Hand Gloves etc. and during night time with hand torches complete. | 30 | Jobs | 450 ₹13,500 | 800 ₹24,000 | 800 ₹24,000 |
Tender Value
₹11.7 L
EMD Value
₹23,440
Closing Date
22 Apr 2026, 11:30 amClosed
Chief Engineer, CEG
Room No. 222, CDO Building, Indira Gandhi Centre for Atomic Research, Kalpakkam - 603102.
Jungle clearance and Cleaning the road surfaces around RCL complex in IGCAR, Kalpakkam during the year 2026-2027.
2026_IGCAR_904907_1
CEG/IGC/2177/2026
Open Tender
Civil Works
365 days
Kalpakkam
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹23,440
16 Jun 2026
9 Apr 2026
24 Apr 2026
9 Apr 2026
22 Apr 2026
10 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing light jungle area of all kinds of shrubs, bulb weeds, grass, small plants, branches including cutting all unwanted plants, branches, twigs, wild growth, thorny leaves etc. complete, and disposing the same as place specified by Engineer, transporting at contractors own cost complete all as directed by the Engineer-in-Charge. Note: The unwanted cut bulb weeds, wild grass, unwanted vegetation are to be periodically collected and transported to dumping yard. During execution period any damages shall be rectified to the original at contractor cost. The measurement for payment shall be taken prior to cut the jungle and as directed by the Engineer-in-Charge. The rate shall include the cost of labour, transportation, loading, and unloading at dumpyard or place as directed by Engineer-in-Charge. | 60,000 | Sq.m. | - | - |
| 2 | Sweeping and Cleaning the concrete surfaces daily around the lab area and pathway area in IGCAR complex including collecting and stacking swept material for disposal upto 4km and as directed by the Engineer-in-Charge. Note: 1. Every time cleaning area shall be measured for payment 2. The contractor shall engage minimum 1 number of workers daily as directed by the Engineer-in-Charge. Failure to deploy the minimum number of labour will attract recovery with the minimum wages for every default of labour as mentioned in specification. 3. The rate should also include sweeping tools etc. 4. The contractor shall supply the necessary PPE to the workers. 5. The rate shall include the cost of hire charges of lorry and labour for transporting of sweeping materials to the dumping yard. | 3,18,000 | Sq.m. | - | - |
| 3 | Sweeping and Cleaning the road surfaces including water table, road junction & pavement on both sides of roads from new IGCAR gate to Main Gate complex area or IGCAR area or DAE Installations (as required by Engineer-in-Charge) two times in a Month or when and where ever required including collecting upto 200m and stacking swept material for disposal up to 4km Lead complete all as directed by the Engineer-in-Charge. Note: 1. Every time cleaning area shall be measured for payment. 2. The contractor shall engage minimum 2 numbers of workers daily as directed by the Engineer-in-charge. Failure to deploy the minimum numbers of labour will attract recovery with the minimum wages for every default of labour. 3. The contractor shall supply the necessary PPE to the workers. 4. The rate should also include sweeping tools etc. 5. The rate shall include the cost of hire charges of lorry and labour for transporting of sweeping materials to the dumping yard. | 1,50,000 | Sq.m. | - | - |
| 4Cleaning the storm water drain when and wherever required including collection of all unwanted leaves, small plants, silt and other unwanted debris etc. upto initial lead 200m and stacking for disposal upto 5km lead at place specified by Engineer, all complete as directed by the Engineer-in-Charge. | |||||
| 4.01 | Width above 500mm upto 1000mm wide with cover slab | 1,500 | Metres | - | - |
| 4.02 | Width above 500mm upto 1000mm wide with out cover slab | 1,000 | Metres | - | - |
| 5 | Levelling, bull-dozing the heeped / dumped loosened earth / debris etc., by hiring JCB / Bull-dozer etc., including transporting, operating the vehicle, operating the vehicle by engaging driver/operator with valid driving license, diesel charges, insurance and admissible taxes, labour if any required etc. complete all as directed by Engineer-in-Charge. | 30 | Hours | - | - |
| 6Conveying the surplus excavated earth & debris, boulders and spoil by mechanical means and depositing at places inside DAE installation identified as Dumping yard as per requirement with a lead specified below including loading, unloading, breaking clods, levelling all complete as per specification and as directed by the Engineer-in-Charge. Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. 2) The earth shall be dumped well inside the Dumping yard and not over approach pathway road. | |||||
| 6.01 | Lead charges for lead Exceeding 3 kilometre but not exceeding 4 kilometre | 300 | Cu.m. | - | - |
| 7 | Clearing blockage in storm water drain, mouth outlets, road side berm rain water pipes, cutting and removing of fallen trees etc., during the monsoon period, cyclone time and rainy days, and all other essential miscellaneous works etc., complete as directed by the Engineer-in-Charge. Note: Contractor has to engage a minimum of 1 number of male coolies per unit with all PPE like Raincoat, Gumboot, PVC Hand Gloves etc. and during night time with hand torches complete. | 30 | Jobs | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
2177Undertakingsandformoftender.pdf
Tender Documents • 0.22 MB
2177technicalbid.pdf
Tender Documents • 2.11 MB
BOQ_951136.xls
BOQ • 0.28 MB
2177FormsACDFGHforfillinganduploading.xls
Tender Documents • 0.08 MB
Download all tender documents and submit your bid