Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹3.8 L
EMD Value
₹7,680
Closing Date
21 Oct 2026, 4:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
xenrew kathua
xenrewkathua
Constt. Of segregation shed at chaloge Tarnaali
2026_RDPR_327881_2
e-NIT No.271/REW/K of 2026-27 Dated 12/10/2026
Open Tender
Civil Works
Percentage
90 days
duggan
sbd
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹7,680
12 Oct 2026
12 Oct 2026
22 Oct 2026
12 Oct 2026
21 Oct 2026
12 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | - | - | - | - |
| 2 | ALL kind of soil | 6.54 | cum | 576.45 | ₹3,769.98 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 3.02 | cum | 4,826.5 | ₹14,576.03 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 20 % Boulder. | 7.9 | cum | 4,774.46 | ₹37,718.23 |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 7.9 | cum | 7,571.55 | ₹59,815.25 |
| 6 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 7.9 | cum | 1,455.65 | ₹11,499.64 |
| 7 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.Welded | 715.5 | kg | 138.2 | ₹98,882.1 |
| 8 | Providing and fixing fencing/mesh width in mesh size 25x25 mm made of G.I. wire of dia 2 mm | 42.94 | sqm | 515 | ₹22,114.1 |
| 9 | Providing corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.50 mm thick with zinc coating not less than 275 gram/m2 | 18.59 | sqm | 852.5 | ₹15,847.98 |
| 10 | Providing ridges or hips of width 60cm overall width plain G.S. sheets fixed with polymer coated J. or L hooks, bolts and nuts 8mm dia G.I. limpet and bitumen washers complete.0.50 mm thick with zinc coating not less than 275 gram/m2 | 7.62 | rmt | 690.85 | ₹5,264.28 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.99 MB
BOQ_1109734.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .