Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance | -28.10% | ₹2.0 L | L1 | Admitted-Finance |
| 2 | L2₹2.2 LAdmitted-Finance | -20.20% | ₹2.2 L | L2 | Admitted-Finance |
| 3 | L3₹2.7 LAdmitted-Finance R O VILLAGE KOTLA TEHSIL KATRA DISTRICT REASI | -3.75% | ₹2.7 L | L3 | Admitted-Finance |
Tender Value
₹2.8 L
EMD Value
₹50,000
Closing Date
8 May 2026, 3:00 pmClosed
Dy. CEO (P)
SMVDSB, Katra
As above
2026_SMVSB_308500_1
eNIT No. CO/DEV/702/453 DATED 23.04.2026
Open Tender
Civil Works
365 days
SMVDSB, Katra
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
FA/CAO, SMVDSB
₹50,000
SMVDSB, Katra
28 May 2026
23 Apr 2026
9 May 2026
23 Apr 2026
8 May 2026
30 Apr 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Stage Contract for the day to day maintenance works of the buildings of Katra Sector | ||||||
| 1.01 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge | ||||||
| 3Extra for cutting reinforcement bars manually/by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional areas of R.C.C. or R.B. work) as per direction of Engineer-in-charge | ||||||
| 4Extra for scraping, cleaning and straightening reinforcement from R.C.C or R.B work. | ||||||
| 5Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | ||||||
| 6Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m. (stacks of cleaned bricks shall be measured) : From brick work in cement mortar | ||||||
| 7Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 meters lead | ||||||
| 7.01 | of area of 3 Sqm. and below | - | each | - | - | BI01010001010000000000000515BI0100001120 |
| 7.02 | of area beyond 3 Sqm | - | each | - | - | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_999676.xls
BOQ • 0.63 MB
Download all tender documents and submit your bid