Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance | -28.10% | ₹2.0 L | L1 | Admitted-Finance |
| 2 | L2₹2.2 L+₹21,873.60 (11.0%)Admitted-Finance | -20.20% | ₹2.2 L+₹21,873.60 (11.0%) | L2 | Admitted-Finance |
| 3 | L3₹2.7 L+₹67,420.54 (33.9%)Admitted-Finance R O VILLAGE KOTLA TEHSIL KATRA DISTRICT REASI | -3.75% | ₹2.7 L+₹67,420.54 (33.9%) | L3 | Admitted-Finance |
Tender Value
₹2.8 L
EMD Value
₹50,000
Closing Date
8 May 2026, 3:00 pmClosed
Dy. CEO (P)
SMVDSB, Katra
As above
2026_SMVSB_308500_1
eNIT No. CO/DEV/702/453 DATED 23.04.2026
Open Tender
Civil Works
Percentage
365 days
SMVDSB, Katra
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
FA/CAO, SMVDSB
₹50,000
SMVDSB, Katra
28 May 2026
23 Apr 2026
9 May 2026
23 Apr 2026
8 May 2026
30 Apr 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Stage Contract for the day to day maintenance works of the buildings of Katra Sector | |||||
| 1.01 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | - | - |
| 2Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge | |||||
| 3Extra for cutting reinforcement bars manually/by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional areas of R.C.C. or R.B. work) as per direction of Engineer-in-charge | |||||
| 4Extra for scraping, cleaning and straightening reinforcement from R.C.C or R.B work. | |||||
| 5Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | |||||
| 6Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m. (stacks of cleaned bricks shall be measured) : From brick work in cement mortar | |||||
| 7Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 meters lead | |||||
| 7.01 | of area of 3 Sqm. and below | - | each | - | - |
| 7.02 | of area beyond 3 Sqm | - | each | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_999676.xls
BOQ • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .