Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Fee/PreQual/Technical/Finance | -20.00% | ₹3.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.7 L+₹4,610.89 (1.25%)Admitted-Fee/PreQual/Technical/Finance | -19.00% | ₹3.7 L+₹4,610.89 (1.25%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.9 L+₹23,054.44 (6.25%)Admitted-Fee/PreQual/Technical/Finance | -15.00% | ₹3.9 L+₹23,054.44 (6.25%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹3.9 L+₹23,054.44 (6.25%)Admitted-Fee/PreQual/Technical/Finance | -15.00% | ₹3.9 L+₹23,054.44 (6.25%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L4₹4.2 L+₹50,719.76 (13.8%)Admitted-Fee/PreQual/Technical/Finance | -9.00% | ₹4.2 L+₹50,719.76 (13.8%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.6 L
EMD Value
₹9,220
Closing Date
4 Aug 2026, 6:00 pmClosed
EXEN REW SRINAGAR
OFFICE OF THE EXECUTIVE ENGINEER REW SRINAGAR
Construction of Crate bund from h/o Ghulam Mohmmad Mir, Ghulam Nabi Bhat and others Syedpora
2026_RDPR_317855_36
ENIT13/REW SGR 2026-27
Open Tender
Civil Works
Percentage
SRINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Rural Development and Panchayati Raj
₹9,220
7 Aug 2026
27 Jul 2026
5 Aug 2026
27 Jul 2026
4 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 35.69 | Cum | 479.3 | ₹17,106.22 |
| 0_) | Hand packing of stones in wire crates excld. Cost of crates but i/c cost of stones and carriages for an avg lead of 15 Kms | 158.76 | Cum | 1,476.46 | ₹2,34,402.79 |
| 0_) | Extra for every additional lift of 1.5 m or part there of beyond 1.5 m height for hand-packing of stones in wire-crates | 47.62 | Cum | 81.4 | ₹3,876.27 |
| 0_) | Add for cost of Crate wire | 654.28 | Sqm | 250 | ₹1,63,570 |
| 0_) | Head load of Stone avg lead 50 mtrs | 158.76 | Cum | 236.08 | ₹37,480.06 |
| 0_) | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material Beyond 30 cm girth upto and including 60 cm girth. . | 7 | Each | 379.05 | ₹2,653.35 |
| 0_) | Add provision for cost of signboard photographs | 1 | Job | 2,000 | ₹2,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_1044876.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .