Loading…
Loading…
Tender Value
₹3 L
EMD Value
₹6,000
Closing Date
30 Jul 2026, 9:00 am4d left
Executive Engineer
UMBDGC KHURJA
construction of boundry pillar
2026_UPIDC_1168064_11
04/EE/2026-27
Open Tender
Civil Works
Item Rate
UMBDGC KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹6,000
25 Jul 2026
25 Jul 2026
30 Jul 2026
25 Jul 2026
30 Jul 2026
25 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20 cm. layers including ramming, compaction and dressing the surface to the required levels and slopes and also including 1.50m. lift and 200m. lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank with in 200m. distance as directed by Engineer-in-Charge. | 25 | Cum. | - | - |
| 2 | Providing and laying Cement Concrete 1:4:8 with Cement, coarse sand and crushed stone aggregate including cost of all material, labour, T&P etc. required for proper completion of work all as specified and directed by Engineer-in-charge. | 5 | Cum. | - | - |
| 3 | Providing and laying R.C.C. 1:1.5:3 with Cement, coarse sand and crushed stone aggregate including cost of all material, labour, T&P etc. required for proper completion of work all as specified and directed by Engineer-in-charge. | 12 | Cum. | - | - |
| 4 | Centering & Shuttering for C.C. work including cost of all material, labour, T&P etc. required for proper completion of work all as specified and directed by Engineer-in-charge. | 31 | Sqm | - | - |
| 5 | Centering & Shuttering for R.C.C. work including cost of all material, labour, T&P etc. required for proper completion of work all as specified and directed by Engineer-in-charge. | 169 | Sqm | - | - |
| 6 | Providing and laying Steel Reinforcement for R.C.C. work including cutting, binding, and placing in position including cost of all material, such as steel, binding wire etc. labour T&P etc. required for proper completion of work all as specified and directed by Engineer-in-charge. | 1.23 | MT | - | - |
| 7 | Finishing walls with Acrylic Smooth exterior paint(Apex) of required shade: New work (Two or More coat applied @1.67ltr/10 Sqm over and including priming coat of exterior primer applied @2.20Kg/10 Sqm including cost of all materials required for proper completion of work all as specified and directed by Engineer-in-charge. | 116 | Sqm | - | - |
| 8 | Letter Writting & Number Writting contractor shall sumbit a drawing of pillers in triplicate indicating Nos. of each Piller Completed all as specified and as directed by Engineer-in-Charge. | 1,200 | Each | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
Tendernotice_2.pdf
PDF • 0.74 MB
BOQ_2201331.xls
BOQ • 0.23 MB
C04.pdf
Additional Documents • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].