| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC | L1 | Accepted-AOC Lowest amount Quoted tenderer | |
| 2 | L2₹2.5 L+₹5,927.44 (2.44%)Rejected-AOC | L2 | Rejected-AOC Highest amount Quoted tenderer |
| Sl No | Description | Qty | Unit | SEKAR B L1 | V K S PRABHAKARAN L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 37.41 | Cum | 263 ₹9,838.83 Lowest | 280 ₹10,474.8 |
| 2.00 | Cement concrete 1 : 4: 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 10cm thick., compacting etc., complete complying with standard specifications and as directed. | 4.01 | Cum | 5,344 ₹21,429.44 Lowest | 5,350 ₹21,453.5 |
| 3.00 | Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement with standard specifications and as directed by departmental Officers etc.Complete. Abutment | 39.84 | Sqm | 547 ₹21,792.48 Lowest | 600 ₹23,904 |
| 4.00 | Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement with standard specifications and as directed by departmental Officers etc.Complete. Slab | 16.58 | Sqm | 1,095 ₹18,155.1 Lowest | 1,150 ₹19,067 |
| 5.00 | Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including Cost conveance and labour charges ect, completd. | 11.26 | Cum | 6,095 ₹68,629.7 Lowest | 6,200 ₹69,812 |
| 6.00 | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, including Cost conveance and labour charges ect, completd. | 3.39 | Cum | 9,066 ₹30,733.74 Lowest | 9,100 ₹30,849 |
| 7.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete | 0.34 | MT | 91,858 ₹31,231.72 Lowest | 91,858 ₹31,231.72 Lowest |
| 8.00 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., including Cost conveance and labour charges ect, completed | 0.65 | Cum | 6,635 ₹4,312.75 Lowest | 6,700 ₹4,355 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works.
{ GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 37,102.28 ₹37,102.28 Lowest | 38,006.46 ₹38,006.46 |
Tender Value
₹2.5 L
EMD Value
₹2,500
Closing Date
10 Feb 2026, 3:00 pmClosed
Block Development officer(VP),Tkm Block
Block Development office Thirukkazhukundram Block
Providing of CC Slab Culvert in Padasalai Street at Mullikolathur Panchayat under 75 Percentage Mines Fund (Seigniorage Fee) between October 2023 to March 2024 and April 2024 to September 2024
2026_RDTN_650322_1
Rc.No.3988/2025/A2 Ad (Pt) Dated. 08.01.2026
Open Tender
Civil Works - Others
Item Rate
90 days
Padasalai Street
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,500
Yes
19 Feb 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Cement concrete 1 : 4: 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 10cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement with standard specifications and as directed by departmental Officers etc.Complete. Abutment
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement with standard specifications and as directed by departmental Officers etc.Complete. Slab
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including Cost conveance and labour charges ect, completd.
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, including Cost conveance and labour charges ect, completd.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., including Cost conveance and labour charges ect, completed
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_779724.xls
BOQ • 0.31 MB
Technical.pdf
Tender Documents • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .