Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.0 LAccepted-AOC 1 NEAR AKBARIYA MASJID WIMBERLYGUNJ SOUTH ANDAMAN ANDAMAN NICOBAR 744206 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744206 | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹23.1 L+₹5.0 L (27.7%)Rejected-Finance | L2 | Rejected-Finance Not being lowest |
Tender Value
₹18 L
EMD Value
₹36,000
Closing Date
14 May 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Garrison Engineer (CME) Kirkee
Garrison Engineer (CME) Kirkee, Phugewadi, Dapodi, Kendriya vidyalay Gate , beside Unlimited (Mega Mart) Mall, Pune - 411 012
Provn of smart prepaid meter for commercial/regimental shops, central institute and offr mess at CME, Pune
2022_MES_518807_1
8295/E8
Open Tender
Electrical and Maintenance Works
Item Rate
2005 days
Garrison Engineer (CME) Kirkee
Class E b(i)
9 documents required · 9 mandatory
₹500
Yes
Garrison Engineer (CME) Kirkee
₹36,000
Yes
14 Jul 2022
19 Apr 2022
16 May 2022
19 Apr 2022
14 May 2022
1 May 2022
20 Apr 2022 - 30 Apr 2022
60 days
Amount
Phase - I & Phase II (from Sl item No. 1 to 12) Removing old pattern single/three phase electric meter and deposited to AGE E/M store complete all as specified and directed. Note : Last meter reading shall be noted by the contractor and submitted to BSO & AGE E/M CME.
Supply and Installation of Smart Single Phase Meter with the following specifications: (a) AC Single Phase Two Wire, Tamper Proof, Static Meter of Class 1.0, 240 V, 50 Hz, 10 A-60 A conforming to IS-16444 and relevant IEC standards with inbuilt 865-867 MHz Radio Frequency communication facility with self healing Mesh network with default and on demand display, billing data generation facility, anti-tamper features, Microprocessor and LED/LCD based circuitry. (b) Meter Should support the following data : 30 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, 30 load survey data for energy, monthly billing survey for Cumulative Energy and Max Demand (c) Meter should have connect / disconnect functionality operable from billing software (d) The meter should support open communication protocol DLMS with the software Make :- L&T Cat no. WM101BC7DLPR6INN or Equivalent in Secure meters/ Schneider
…..Ditto…. All as per sl item No.2 above, but as repeater
Supply and Installation of Three Phase Meter with the following specifications: (a) AC Three Phase Four Wire, Tamper Proof, Static Meter of Class 1.0, 415 V, 50 Hz, 10 A-60 A conforming to IS-16444 and relevant IEC standards with inbuilt 865-867 MHz Radio Frequency communication facility with self healing Mesh network with default and on demand display, billing data generation facility, anti-tamper features, Microprocessor and LED/LCD based circuitry. (b) Meter Should support the following data : 30 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, 30 load survey data for energy, monthly billing survey for Cumulative Energy and Max Demand (c) Meter should have connect / disconnect functionality operable from billing software (d) The meter should support open communication protocol DLMS with the software Make : L&T Cat no. WR300BC73LPR6 or equivalent of Secure meters/ Schneider
Supply and Installation of IP-67 protection Data Concentrator Units (DCU) compatible for remote Automatic Metering Infrastructure (AMI) solution and capable of communicating with the smart energy Meter in the corresponding frequency band and with the data server through GPRS/Ethernet. It would have internal memory to store data of at least 200 modules. It would have inbuilt battery back-up. It would have IP-67 protection. It would support auto discovery of the meters and self healing mechanism for the breaks in the RF network. Make: L&T, Secure meters, Schneider, CyanConnnode
Supply and Installation of Smart Single Phase Meter with the following specifications: (a) AC Single Phase Two Wire, Tamper Proof, Static Meter of Class 1.0, 240 V, 50 Hz, 10 A-60 A conforming to IS-16444 and relevant IEC standards with inbuilt 4G Modem with default and on demand display, billing data generation facility, anti-tamper features, Microprocessor and LED/LCD based circuitry. (b) Meter Should support the following data : 30 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, 30 load survey data for energy, monthly billing survey for Cumulative Energy and Max Demand (c) Meter should have connect / disconnect functionality operable from billing software (d) The meter should support open communication protocol DLMS with the software Make: Cat No.WM101BC7DSM4GINN of L&T or Equivalent of Secure meters/ Schneider
Supply and Installation of three phase meter with the following specifications: (a) AC three phase four wire, tamper proof, static meter of class 1.0, 415 V, 50 Hz, 10 A-60 A conforming to IS-16444 and relevant IEC standards with inbuilt 4G Modem with default and on demand display, billing data generation facility, anti-tamper features, Microprocessor and LED/LCD based circuitry. (b) Meter Should support the following data : 30 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, 30 load survey data for energy, monthly billing survey for cumulative energy and max demand (c) Meter should have connect / disconnect functionality operable from billing software (d) The meter should support open communication protocol DLMS with the software Make : Cat No.WR300BC83SM4GINN of L&T or Equivalent of Secure meters/ Schneider
Supply and Configuration of the Web based Software per meter with following modules: (i) Meter Data Management Module The meter data management module would be responsible for collecting the data from the concentrator and make the data available to the billing system. The meter data management system would capture and provide the following data: (a) 30 min instantaneous data from all the meters for seven parameters – Cumulative Energy, Cumulative Apparent Energy (as applicable), Power, Current, Voltage, Power Factor and Frequency
(b) Monthly billing survey data for cumulative energy and max demand (ii) Billing Module The billing module would collect the data from the meter data management module, calculate the energy consumption, calculate billing determinant and make energy data / billing data available to admin and end users. The billing module would include functionalities for tariff setup, bill format setup, bill adjustment, occupation billing and vacation billing. The system would be setup as postpaid billing system. It would allow postpaid and prepaid functionality as required.
(iii) Occupation and Vacation Module The system would support occupation / vacation and billing reports. The software would be collecting data from DCU. The software would provide access to staff as well as the occupant for the data. (iv) Web site: There would be a dedicated website for the AGE and BSO team to view of all the data and information. The designated users in MES would have the admin access to the application. The MES staff would also have the access of the key information on an android mobiles app (for admin use). (v) Customer Portal The system would include a customer portal for the resident /occupant to log in and view their own energy / billing data. There would be android and iOS mobile apps for the user to monitor its own data and balance on regular basis.
(vi) Energy Accounting Module The system would include features of energy accounting. The system would be able to account for total energy block wise, facility wise and would also allow calculations of unaccounted energy in case total energy meter is also available. (vii) Communication Module The system would provide communication of energy data and bills via print, email and sms methods.
(viii) Meter Master Data The system would support meter master data repository. The system would support meter replacement process. (ix) Excel Export The system would support export of metering and billing data in excel format.
(x) Customer Care Module - The software would include a customer care module where the user would be log in any complaints. The service provider would monitor the complaints and carry out the necessary activities for the complaints resolution. (xi) Meter Installation Module - The software would include an app based meter installation module where the meter installation or changes can be captured on the app itself and the readings may be demonstrated to the user if required on the app itself. (xii) Activities Communication - The software support communication of the various activities such as occupation, vacation, meter change. personal detail change etc. with the user as well as the department on email. Make: Innologix, SAP, Oracle
Note:- (a) The software would be hosted on MEITY (Ministry of Information Technology) approved GCC (Government Community Cloud) (b) The software would contain two year defect liability including all operating expenses such as GPRS charges, hosting charges etc. (c) The software used shall be open source based i.e any other company can maintain/upgrade the software
M&L for sub main wiring with two run of 4 sqmm single core multi stranded PVC insulated and unsheathed copper conductor (red for phase and black for neutral) of grade 1100 volt FRLSH cable in and including 1100 volt electrical grade PVC casing caping of desired colour not less than1.2 mm thick and 25 mm wide & FRLSH 4 sqmm copper conductor cable PVC unsheathed green coloured for earthing with complete accessories duly connected with earth dolly complete all as specified and as directed. Note :- Two runs of cable, one run of PVC casing capping and one run of earthing cable together measured as one unit length.
M&L for sub main wiring with two run of 6 sqmm single core multi stranded PVC insulated and unsheathed copper conductor (red for phase and black for neutral) of grade 1100 volt FRLSH cable in and including 1100 volt electrical grade PVC casing caping of desired colour not less than1.2 mm thick and 25 mm wide & FRLSH 6 sqmm copper conductor cable PVC unsheathed green coloured for earthing with complete accessories duly connected with earth dolly complete all as specified and as directed. Note :- Two runs of cable, one run of PVC casing capping and one run of earthing cable together measured as one unit length.
M&L for sub main wiring with four run of 6 sqmm single core multi stranded PVC insulated and unsheathed copper conductor (red for phase and black for neutral) of grade 1100 volt FRLSH cable in and including 1100 volt electrical grade PVC casing caping of desired colour not less than1.2 mm thick and 25 mm wide & FRLSH 6 sqmm copper conductor cable PVC unsheathed green coloured for earthing with complete accessories duly connected with earth dolly complete all as specified and as directed. Note :- Four runs of cable, one run of PVC casing capping and one run of earthing cable together measured as one unit length.
Phase - III M&L for three year comprehensive maintenance including operating costs after two years of defect liability period. the service would include the following items: (96x3=288) (a) Monthly sim charges for the DCU. The contractor would ensure supply of appropriate SIMs to ensure necessary signal availability. The contractor would change the sim or sim provider as required. In case of network issues, the contractor would liaison with the telecom service providers for necessary resolution. (b) Recurring SMS charges. The SMS would be issued for the payments alerts, low balance alerts and disconnection / connection alerts.
(c) Software AMC. This would include necessary upgradations in the software such as support to the chrome browser changes, android version changes , iOS version changes. These changes happen on frequent basis and the software would support all the changes. (d) Changes in the government tariff structure. The government tariff structure changes may require software upgrade. The same would be included in the AMC scope of work.
(e) Remote server admin support - Ensuring adequate database back up, upgradations in the operating system, anti virus updates, database upgrade etc. (f) Reports Development - The additional reports as needed for the success of the project would be developed (g) Software installation on any alternate / backup server if required
(h) The communication network monitoring and support (i) Configuration of the repaired / replaced hardware in the system (j) Trouble shooting and necessary actions to run the system as required. (k) Software bug fixing as and when required Note : The rate quoted by the contractor against this item shall be for one year per each meter and quantity for one year will be 96 meters for the purpose of payment
Techmat trading solution
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .