Tender Value
₹93.6 L
EMD Value
₹1.9 L
Closing Date
5 Oct 2026, 2:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
ELECTRICAL
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual. turnover of V/N crores or V crores whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB in GCC works April 22, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Certificate in the prescribed format for verification / confirmation of the documents submitted for compliance of eligibility / qualifying criteria For further more details refer clause 10.1 and 10.2 of GCC April 2022 with correction slip issued up to date
(a)The tenderer must have successfully completed any of the following during last 7 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of the tender Similar works defined as "Successful completion of works involving installation of wiring/ lighting with 240v, 1 phase or 415v, 3 phase system with control gear and protection arrangements in residential buildings or service buildings or railway stations/ yards or colony/ highway lightings in Central/State Governments and PSUs."
Defination of Similar Work :- Similar works defined as "Successful completion of works involving installation of wiring/ lighting with 240v, 1 phase or 415v, 3 phase system with control gear and protection arrangements in residential buildings or service buildings or railway stations/ yards or colony/ highway lightings in Central/State Governments and PSUs."
12 conditions · 2 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
I/We have read the various conditions attached/referred to in this tender document and agree to abide by the said conditions.
I/We hereby Confirm that the rates, rebates and/or other financial terms, if any, quoted by us in the relevant fields of the Financial Bid page will only be the ruling terms for deciding the inter-se ranking, and any such condition having financial repercussions, if quoted by us anywhere else including attached documents shall not be considered for deciding inter-se ranking.
The Tenderers are advised to visit the site of work in their own interest and acquaint themselves with the site conditions and expected quantum o f work and assess all the site specific difficulties to be experienced while executing the same and the rate shall be arrived duly considering all the facts above and quoted in the tender. Any representation at a later date specifying the site difficulties shall not be considered.
The tenderer shall go through the entire tender documents thoroughly and strictly adhere the instructions and directions given at different pages.
(i)For all the tenders having advertised cost of Rs. 10 lakh orabove, the contractor shall have the option to take paymentfrom Railways through a letter of credit (LC) arrangement.(ii)This option of taking payment through LC arrangement hasto be exercised in IREPS (Indian Railway ElectronicProcurement System - the e-application on which tenders arecalled by Railways) by the tenderer at the time of bidding itself,and the tenderer shall affirm having read over and agreed tothe terms and conditions of the LC option.(iii)The option soexercised, shall be an integral part of the bidder's offer. (iv)Theabove option of taking payment through LC arrangement,once exercised by tenderer at the time of bidding, shall befinal and no change shall be permitted, thereafter, duringexecution of contract.(v)In case tenderer opts for paymentthrough LC, following shall be the procedure to deal release ofpayment through LC:(a)The LC shall be a sight LC. (b)Thecontractor shall select his Advising/Negotiating bank for LC.The incidental cost towards issue of LC and its operationthereof shall be borne by the contractor.(c)SBI, New Delhi,Main Branch will be the nodal branch for issue of LCs basedon online requests received from Railway Accounts Units fortenders opened in financial year 2018-19. SBI branches wherethe respective Railway Accounts Office has its Account (localSBI branch) will be the issuance/reimbursing branch for LCissued under this arrangement. The Bank shall remain samefor this tender till completion of contract. The incidental cost @0.15 % per annum of LC value, towards issue of LC andoperation thereof shall be borne by the contractor and shall berecovered from his bills.(d)The LC shall be opened initially forduration of 180 to 365 days in consultation with contractor.The LC shall be extended time to time as per the progress ofthe contract, on the request of the contractor. The value of LCto be opened initially as well as extended thereafter shall befinalised by the engineer in consultation with the contractor onthe basis of expected progress of work.(e)The LC terms andconditions shall inter-alia indemnify and save harmless theRailway from and against all losses, claims and demands ofevery nature and description brought or recovered against theRailways by reason of any act or omission of the contractor,his agents or employees, in relation to the Letter of Credit(LC). All sums payable/borne by Railways on this account shallbe considered as reasonable compensation and paid by Contractor.
(f)The LC terms and conditions shall inter-alia provide that Railways will issue a Document of Authorisation after passing the bill for completed work, to enable contractor to claim the authorized amount from their bank.(g)The acceptable, agreed upon document for payments to be released under the LC shall be the Document of Authorisation.(h)The Document of Authorisation shall be issued by Railway Accounts Office against each bill passed by Railways.(i)On issuance of Document of Authorisation, a copy of Document of Authorisation shall be posted on IREPS for download by the contractor. A digitally signed copy of Document of Authorisation shall also be sent by Railway Accounts Office to Railway's bank (Local SBI Branch). (j)The contractor shall take print out of the Document of Authorisation available on IREPS and present his claim to his bank (advising Bank) for necessary payments as per LC terms and conditions. The claim shall comprise of copy of Document of Authorisation, Bill of Exchange and Bill.(k)The payment against LC shall be subject to verification from Railway's Bank (Local SBI Branch). (l)The contractor's bank (advising bank) shall submit the documents to the Railways Bank (Local SBI Branch0.(m)The Railway's bank (issuing bank) shall, after verifying the claim so received w.r.t. the digitally signed Document of Authorisation received from Railway Accounts Office, release the payment to contractor's bank (advising bank) for crediting the same to contractor's account.(n)Any number of bills can be dealt within one LC, provided the sum total of payments to contractor is within the amount for which LC has been opened.(o)The LC shall be closed after the release of final payment including PVC amount, if any, to the contractor.(p)The release of performance guarantee or security deposit shall be dealt directly by Railway with the contractor i.e., not through LC.
MDU Division: Provision of FOB at 4 stations, Construction of new running room at Bodinayakkanur and RPF outpost building at Manamadurai & Vanchimaniyachi station- Power supply arrangements, wiring and installations
U-E-OT-2026-14-02~SR
U-E-OT-2026-14-02
Open
Works - General
6 Months
Madurai, Tamil Nadu
₹0
₹1.9 L
11 Sept 2026
11 Sept 2026
21 Sept 2026
318 items across 9 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 23,89,853.81 | ||
| — | 250.00 | — | — | ||
| Supply of 4 core XLPE insulated LTUG cable with aluminium conductor of 95 Sqmm standard as per enclosed specifications. Preferred make: Havells, Polycab, KEI, RR, Finolex. | — | — | — | 2,13,910 | |
| — | 550.00 | — | — | ||
| Supply of 4 core XLPE insulated LTUG cable with aluminium conductor of 70 Sqmm standard as per enclosed specifications. Preferred make: Havells, Polycab, KEI, RR, Finolex. | — | — | — | 3,02,120.5 | |
| — | 550.00 | — | — | ||
| Supply of 4 core XLPE insulated LTUG cable with aluminium conductor of 35 Sqmm standard as per enclosed specifications. Preferred make: Havells, Polycab, KEI, RR, Finolex. | — | — | — | 1,71,336 | |
| — | 450.00 | — | — | ||
| Supply of 4 core XLPE insulated LTUG cable with aluminium conductor of 16 Sqmm standard as per enclosed specifications. Preferred make: Havells, Polycab, KEI, RR, Finolex. | — | — | — | 86,913 | |
| — | 160.00 | — | — | ||
| Excavation of trench and refilling in all kinds of soil as per specifications and drawing enclosed. | — | — | — | 69,840 | |
| — | 60.00 | — | — | ||
| Excavation of trench and refilling across road, track/concrete flooring as per specification | — | — | — | 52,380 | |
| — | 55.00 | — | — | ||
| Demolishing plain cement concrete including disposal of material within 50m. including tools &plant labour etc., and as per instruction of site Engineer in charge. | — | — | — | 33,557.15 | |
| — | 40.00 | — | — | ||
| Demolishing Reinforced Cement Concrete work with the utilization of pavement breaker and disposal of unserviceable material within 50m lead | — | — | — | 72,012.8 | |
| — | 95.00 | — | — | ||
| Providing and laying of Plain Cement Concrete by mixing of 1:3:6 including supply of cement, sand and coarse aggregate etc and tools & plant labour etc. and as per the instruction of site Engineer in charge and as required at site. | — | — | — | 4,34,118.65 | |
| — | 1000.00 | — | — | ||
| Laying/Drawing and testing of LTUG power cable of up to and including 50 sqmm size complete with required tools & accessories. | — | — | — | 25,220 | |
| — | 700.00 | — | — | ||
| Laying/Drawing and testing of LTUG Power cable of above 50 sqmm and up to and including 185 sq.mm size complete with accessories. | — | — | — | 31,234 | |
| — | 40.00 | — | — | ||
| Supply and termination and connection of LTUG cable of sizes of up to and including 50 sqmm size with single flange type brass cable gland aluminium tube terminal type crimping sockets.Note: One termination comprises of one number of single flange type brass cable gland and with four numbers of aluminium crimping sockets for all cores of the cable. | — | — | — | 17,188.4 | |
| — | 16.00 | — | — | ||
| Supply and termination and connection of LTUG cable of sizes above 50sqmm but up to and including 185 sqmm with aluminium crimping sockets and single flange type brass cable gland. Note: One termination comprises of one number of single flange type brass cableg land and with four numbers of aluminium crimping sockets for all cores of the cable. | — | — | — | 11,686.56 | |
| — | 40.00 | — | — | ||
| Supply and provision of sealing compound for cable leading pipe for leading of power cables of upto and including 50sqmm size. | — | — | — | 3,802.4 | |
| — | 16.00 | — | — | ||
| Supply and provision of sealing compound for cable leading pipe for leading of cable of above 50 sqmm but up to and including 185 sqmm. | — | — | — | 2,033.12 | |
| — | 80.00 | — | — | ||
| Supply and fixing of medium duty GI pipe of 50 mm dia, conforming to IS.1239,part 1 (2004) ,for cable leading without clamp. | — | — | — | 73,021.6 | |
| — | 46.00 | — | — | ||
| Supply and fixing of medium duty GI pipe of 65 mm dia, conforming to IS.1239,part 1 (2004) ,for cable leading without clamp. | — | — | — | 54,079.44 | |
| — | 24.00 | — | — | ||
| Supply, placing of cast iron cable route indicators,cast iron plate type including MS flat size 40mm x 6mm x 350mm length concreting and coping, painting etc complete with all other accessories as per drawing No: CEE/CN/MS/11-2004 | — | — | — | 14,293.92 | |
| — | 40.00 | — | — | ||
| Fabrication, supply and fixing of clamps made out MS flats of different sizes for fabrication of clamps for various requirements.This shall be made use for fixing of items indicated in the note below. The clamp shall be made out of MS flat of suitable size,painted with two coats in each of zinc chromate and grey enamel paint or suitable colour as instructed by the Engineer in charge and using GI bolts with nuts of suitable size for fixing. Note: This shall be made use for fixing of items such as UG cables, cable leading pipe,'U' brackets for shelter mains, enclosures made out of 16 SWG sheet steel contemplated elsewhere and cable tray etc. | — | — | — | 5,276.8 | |
| — | 8.00 | — | — | ||
| Fabrication, supply and fixing of cable looping box with aluminium bus bars as per drawing No:DRM/EL/TPJ-10-2015. | — | — | — | 66,448.88 | |
| — | 8.00 | — | — | ||
| Erection of cut rail post upto and including 5.5 feet height with foundation and accessories like base plate, including supply of two coats of each Zinc chromate primer,aluminium paint as perdrawing noCEE/CN/MS/20-2004. | — | — | — | 17,654 | |
| — | 955.00 | — | — | ||
| Supply of 50mm dia HDPE pipe PE63 class PN 6.0 conforming to IS 4984/1995 latest complete with all accessories. | — | — | — | 89,836.85 | |
| — | 379.00 | — | — | ||
| Supply of 75mm dia HDPE pipe PE63 class PN 6.0 conforming to IS 4984/1995 latest complete with all accessories. | — | — | — | 1,32,824.34 | |
| — | 238.00 | — | — | ||
| Supply of 90mm dia HDPE pipe PE63 class PN 6.0 conforming to IS 4984/1995 latest complete with all accessories. | — | — | — | 1,15,144.4 | |
| — | 955.00 | — | — | ||
| Laying of HDPE pipes of sizes upto and including 63mm dia with required couplers. | — | — | — | 28,650 | |
| — | 617.00 | — | — | ||
| Laying of HDPE pipes of all sizes above 63mm Dia required couplers. | — | — | — | 37,020 | |
| — | 1660.00 | — | — | ||
| — | — | — | 36,520 | ||
| — | 3.00 | — | — | ||
| — | — | — | 97,557 | ||
| — | 1.00 | — | — | ||
| — | 8.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tender Document
ATTACHMENT
Correctionslipno1.pdf
ATTACHMENT
Correctionslipno2.pdf
ATTACHMENT
Correctionslipno3.pdf
ATTACHMENT
Correctionslipno4.pdf
ATTACHMENT
Correctionslipno5.pdf
ATTACHMENT
GCCACS11_compressed.pdf
ATTACHMENT
GCC_April-2022.pdf
ATTACHMENT
TenderDocument2026-14-02foruploading.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .