Tender Value
₹1.6 L
EMD Value
₹2,000
Closing Date
19 Sept 2023, 3:00 pmClosed
SE EDC-II RAEBARELI
SE EDC-II GORABAZAR RAEBARELI
LINE POLE SHIFTING WORK UNDER PRADHANMANTRI SADAK YOJAN UNDER EDD UNCHAHAR RAEBARELI
2023_MVVNL_835614_1
Tender No. 70/EDCR-II/2023-24
Open Tender
Electrical Works
Item Wise
60 days
EEEDD UNCHAHAR RAEBARELI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Chief Finance and Account Officer,Nagar Nigam
₹2,000
Yes
22 Sept 2023
9 Sept 2023
20 Sept 2023
9 Sept 2023
19 Sept 2023
9 Sept 2023
Amount
Safe loading & carriage including Loading-unloading & proper stacking at a Place of following store materials from ESC Tripula to site of work.
PCC Pole 8.5 Mtr. Long
11 KV M.S. Top Channel
11 KV M.S. Dropper Channel/Angle
Earthing Complete
Stay Set Complete
11 KV Composit Polymer Pin insulator
T off channel. 125X65X1300 mm
T/F Base angle set
ACSR Weasal conductor
ABC 350+1X35+1x16 sq.mm.
ABC 1X16 sq.mm.
11 KV Poly Disc Insulator
11 KV Disc fitting
11 KV "V" type X-Arms
Droper Channel
Labour Errection Charges
Digging of pits, Shifting of PCC Pole 8.5 Mtr. Long from dump site to pit site then errection of PCC poles with including all related accessories as per RESPO Norms.
Grouting of PCC poles 8.5 Mtr. Long with grouting materials as per RESPO Norms.
Erection of Double Pole of ST/PCC Pole for mounting of T/Fs. as per RESPO Norms and fitting of all accessories.
Earthing of Body & Neutral of Shifting Transformers complete work as per RESSPO norms.
Digging of pits, fixing & grouting of stay rods as per RESSPO norms including with grouting materials. Then after fixing and nozzling of stay wire.
Earthing of S.T/PCC. Poles as per RESSPO Norms
Work for Shifting & Mounting of 16 KVA ExistingTransformers on Pole alongwith fitting of all acessories.
Work for Shifting & Mounting of 25 KVA ExistingTransformers on D/Pole alongwith fitting of all acessories.
Stringing, Laying & sagging of 11KV Line by ACSR Weasal conductor, as per RESSPO Norms.
Stringing & sagging of A.B. conductor of 3X50+1x35+1X16 sq mm, as per RESSPO Norms.
Stringing & sagging of A.B. conductor of 16 sq mm, as per RESSPO Norms.
Work for Guarding of H.T. Line by G.I. Barbed wire (6SWG), Material Provided by Contractor.
work for Installtion of Holding Clamp, Material Provided by Contractor.
work for Installtion of PG Clamp, Material Provided by Contractor.
work for Installtion of Stone Pad 300X300X75 mm, Material Provided by Contractor.
work for fixing/Tightening of Nuts & Bolt, Material Provided by Contractor.
work for Installtion of F-Bracket with Pin, Material Provided by Contractor.
work for Installtion of LT. Insulator, Material Provided by Contractor.
Danger Board with Clamp, Material Provided by Contractor.
work for painting number mark with, Material Provided by Contractor.
Dismantling of 11KV line, L.T. Lines & Distribution Boxes, T/Fs and its dump at suitable place on site up to completion of work:-
Dismentling of old existing D/Pole, H.T./L.T. Line by (AB Conductor /Weasal Conductor).
Dismentling of Existing Transformers and other related materials.
Carriage Charges,Safe loading/unloading/weighing of receipt back materials from dump site to JE"s store/ESC Raebareli (Except broken PCC Pole):-
Carriage Charges for Scrap Materials form dump Site to ESC Tripula, Raebareli alongwith Loading Unloading.
Cutting of Tree Branches for cleaning of HT/LT Lines, as required.
NATIONAL ENTERPRISES
JYOTI CONSTRUCTION AND SUPPLIER
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .