| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance | L1 | Accepted-Finance Rate quoted is lowest | |
| 2 | L2₹2.0 L+₹601 (0.30%)Accepted-Finance | L2 | Accepted-Finance Rate quoted is second lowest | |
| 3 | L3₹2.0 L+₹1,416.40 (0.72%)Accepted-Finance | L3 | Accepted-Finance Rate quoted is highest | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.0 L
EMD Value
₹2,000
Closing Date
19 May 2021, 4:00 pmClosed
Superintending Engineer
SE ETC Sultanpur 400KV S/S Campus Payagipur Sultanpur
OVERHAULING ALONG WITH PERIODIC MAINTENANCE OF SPLIT AC INSTALLED IN CONTROL ROOM AT 220KV SUBSTATION SOHAWAL UNDER ETD, AYODHYA
2021_UPTCL_585879_1
S.T. T.No. 20/ETCS/2021-22
Open Tender
Electrical Works
Item Wise
365 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹236
SE ETC Sultanpur
₹2,000
29 May 2021
10 May 2021
20 May 2021
10 May 2021
19 May 2021
10 May 2021
10 May 2021 - 19 May 2021
Amount
Overhaulling along with periodic maintenace of split AC installed in control room at 220KV Substation Sohawal-
Complete overhaulling of 02 ton Hitachi make split AC indoor & outdoor unit by disassembling it from wall . Then cleaning its indoor &outdoor unit with low jet strem by applying descaling ajent thrice in the complete season. Post cleaning remounting the structure back on the wall. the work also includes checking of the healthiness of all its ascessories & preventive maintenance to make it run smoothly through the complete season.
Attending all type of faults of the AC unit at earliest by deploying skilled personnel within a day of intimation . The work includes replacement of damage spares(to be provided by dept)
Refilling of refrigant of AC units whose pressure is low and is supposed to ge low during the complete season.
Providing & Replacing damaged PCB
Providing & replacing outdoor Motor unit
Providing & replacing Capacitor suitable for starting
Providing & replacing Copper pipe
Providing & replacing Fan blade
Providing & replacing Capacitor suitable for running
Providing & replacing Auto-cut Stablizer(4kVA)
Following items to be provided as spare for quick maintenance In future
Capacitor starting - 40 micro farad
Capacitor running - 50 micro farad
Hose pipe
M/S ALOK TRADERS
DURGA CONSTRUCTION AND GEN. ORDER SUPPLIERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .